Project Details

Search


File Number
PPR2436
Project Name
Cathedral Rock Church
Description
Site development of new church
Parcels
7136301013 7136301013
Applicant
Hammers Construction
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
File Prefix
PPR - Plot Plan Review
Year
2024
Project Manager
Lisa Elgin
Status
Closed
Created
8/23/2024 2:53:52 PM

View: Review Comments


Approved Documents (10)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View PBMP Applicability Form
View Storm Water Management Plan (SWMP)
View Grading & Erosion Control Plan
View Deviation Request
View Drainage Report - Final
View Traffic Impact Study
View Approved Site Development Plan
View O&M Rain Garden


Additional Documents (2)

Link Document Comment
View CONSTRUCTION DRAWLINGS
View Recorded - Private Detention Basin Stormwater Quality Best Management Practice Maintenance Agreement and Easement


Review Documents (37)

Link Document Date
View Application/Petition Form 9/27/2024 4:39:37 PM
View Grading & Erosion Control checklist 2/17/2025 4:50:42 PM
View Legal Description (MS WORD Version required) 9/27/2024 4:39:42 PM
View Letter of Intent 4/23/2025 5:10:43 PM
View Avigation Easement 5/1/2025 2:39:57 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 4/7/2025 1:35:22 PM
View Financial Assurance Forms 4/7/2025 1:35:18 PM
View Floor Plans (24" x 36") 9/27/2024 4:39:41 PM
View PBMP Applicability Form 2/17/2025 4:50:43 PM
View SWMP checklist 2/17/2025 4:50:43 PM
View Grading & Erosion Control Plan 2/17/2025 4:50:39 PM
View Landscape Plan drawings 4/23/2025 5:10:42 PM
View Lighting Plan 9/27/2024 4:39:43 PM
View Sign Plan 9/27/2024 4:39:44 PM
View Site Development Plan 4/7/2025 1:35:23 PM
View Soils Report Pursuant to Appendix C of the ECM 9/27/2024 4:39:47 PM
View Drainage Report - Final 4/7/2025 1:35:19 PM
View Traffic Impact Study 4/23/2025 5:10:44 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 2/17/2025 4:50:37 PM
View Building Elevation 4/23/2025 5:10:45 PM
View Building Elevations 2/17/2025 4:50:47 PM
View Deviation request for Traffic 4/7/2025 1:35:26 PM
View DMA pdf 4/7/2025 1:35:24 PM
View DMA with attachments 4/7/2025 1:35:23 PM
View Elevation Plans 4/23/2025 5:10:42 PM
View Floor plan 2/17/2025 4:50:47 PM
View Floor Plan 4/7/2025 1:39:42 PM
View GEC plans 4/7/2025 1:35:25 PM
View O&M Rain Garden 2/17/2025 4:50:44 PM
View Photometric plan 2/17/2025 4:50:45 PM
View Soils Report 2/17/2025 4:52:54 PM
View SWMP plan 2/17/2025 4:50:44 PM
View Traffic Report responses 4/7/2025 1:35:25 PM
View USAFA comment response 4/7/2025 1:39:40 PM
View Utility Plan 4/7/2025 1:39:41 PM
View Utility plan 9/27/2024 4:39:48 PM
View Utility plans 2/17/2025 4:50:46 PM



Events (134)

Date Comment
5/16/2025 11:40:03 AM Project Closed
5/16/2025 11:40:03 AM Project Approved: 5/16/2025
5/1/2025 2:48:04 PM Request for Review Comments returned by PCD Project Manager
5/1/2025 2:46:56 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of Woodmoor Improvement Association
5/1/2025 2:46:55 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Peter Susemihl on behalf of Walden Metropolitan Districts 1 and 2
5/1/2025 2:46:53 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Justin Kilgore on behalf of PCD Project Manager
5/1/2025 2:46:07 PM Submission Triaged
5/1/2025 2:40:01 PM Submission received from Applicant
5/1/2025 2:33:34 PM Submission request sent to Applicant
5/1/2025 2:32:26 PM Request for Review Comments returned by PCD Project Manager
5/1/2025 11:57:16 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/1/2025 11:47:17 AM Request for Review Comments email resent for Project Cathedral Rock Church for review by General Email on behalf of Mountain View Electric Association, Inc.
4/30/2025 2:08:28 PM Request for Review Comments returned by PCD Engineering Division
4/30/2025 11:37:06 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/24/2025 3:14:44 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Justin Kilgore on behalf of PCD Project Manager
4/24/2025 3:14:43 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Gilbert LaForce on behalf of PCD Engineering Division
4/24/2025 3:14:42 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Engineering Manager on behalf of PCD Engineering Division
4/24/2025 3:10:39 PM Submission Triaged
4/23/2025 5:10:57 PM Submission received from Applicant
4/22/2025 12:57:01 PM Submission request sent to Applicant
4/21/2025 4:29:24 PM Request for Review Comments returned by County Attorney - Development Review
4/21/2025 1:06:27 PM Request for Review Comments returned by PCD Engineering Division
4/21/2025 9:31:44 AM Request for Review Comments email resent for Project Cathedral Rock Church for review by Engineering Manager on behalf of PCD Engineering Division
4/21/2025 9:23:23 AM Request for Review Comments returned by PCD Engineering Division
4/21/2025 8:32:14 AM Request for Review Comments returned by EPC Stormwater Review
4/18/2025 11:01:21 AM Request for Review Comments returned by PCD Project Manager
4/7/2025 2:40:22 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by General Email on behalf of Mountain View Electric Association, Inc.
4/7/2025 2:40:21 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Zachary Jannusch on behalf of EPC Stormwater Review
4/7/2025 2:40:20 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Mikayla Hartford on behalf of EPC Stormwater Review
4/7/2025 2:40:19 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Glenn Reese on behalf of EPC Stormwater Review
4/7/2025 2:40:18 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Christina Prete on behalf of EPC Stormwater Review
4/7/2025 2:40:17 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Lori Seago on behalf of County Attorney - Development Review
4/7/2025 2:40:16 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Erika Keech on behalf of County Attorney - Development Review
4/7/2025 2:40:15 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by April Willie on behalf of County Attorney - Development Review
4/7/2025 2:40:12 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Justin Kilgore on behalf of PCD Project Manager
4/7/2025 2:40:11 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Gilbert LaForce on behalf of PCD Engineering Division
4/7/2025 2:40:10 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Engineering Manager on behalf of PCD Engineering Division
4/7/2025 2:25:27 PM Submission Triaged
4/7/2025 1:40:01 PM Submission received from Applicant
4/7/2025 10:31:00 AM Submission request sent to Applicant
3/10/2025 12:58:09 PM Submission request sent to Applicant
3/10/2025 12:53:44 PM Request for Review Comments returned by PCD Project Manager
3/7/2025 2:26:13 PM Request for Review Comments returned by USAFA Base Planner
3/6/2025 3:40:29 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/6/2025 1:28:05 PM Request for Review Comments returned by PCD Engineering Division
3/4/2025 12:03:24 PM Request for Review Comments returned by County Attorney - Development Review
3/3/2025 4:21:06 PM Request for Review Comments returned by EPC Stormwater Review
3/3/2025 9:53:15 AM Request for Review Comments email sent for Project Cathedral Rock Church for review by Lori Seago on behalf of County Attorney - Development Review
3/3/2025 9:53:14 AM Request for Review Comments email sent for Project Cathedral Rock Church for review by Erika Keech on behalf of County Attorney - Development Review
3/3/2025 9:53:13 AM Request for Review Comments email sent for Project Cathedral Rock Church for review by April Willie on behalf of County Attorney - Development Review
2/26/2025 12:49:46 PM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
2/20/2025 4:02:12 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Sabrina Untal on behalf of USAFA Base Planner
2/20/2025 4:02:11 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
2/20/2025 4:02:10 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Amy Kelley on behalf of USAFA Base Planner
2/20/2025 4:02:09 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of USAFA Base Planner
2/20/2025 4:02:08 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
2/20/2025 4:02:07 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
2/20/2025 4:02:06 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by General Email on behalf of Mountain View Electric Association, Inc.
2/20/2025 4:02:04 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/20/2025 4:02:03 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Glenn Reese on behalf of EPC Stormwater Review
2/20/2025 4:02:02 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Christina Prete on behalf of EPC Stormwater Review
2/20/2025 4:02:00 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Justin Kilgore on behalf of PCD Project Manager
2/20/2025 4:01:59 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Gilbert LaForce on behalf of PCD Engineering Division
2/20/2025 4:01:58 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Engineering Manager on behalf of PCD Engineering Division
2/20/2025 3:55:55 PM Submission Triaged
2/17/2025 4:53:07 PM Submission received from Applicant
12/3/2024 10:52:19 AM Project Manager Assigned: Lisa Elgin
11/18/2024 10:54:13 AM Request for Review Comments returned by USAFA Base Planner
11/15/2024 6:06:54 PM Request for Review Comments returned by EPC Health Department
11/15/2024 5:08:38 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Rachel Martell on behalf of USAFA Base Planner
11/15/2024 5:08:37 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by matthew. fitzsimmons on behalf of USAFA Base Planner
11/15/2024 5:08:35 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Amy Kelley on behalf of USAFA Base Planner
11/15/2024 5:08:33 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of USAFA Base Planner
10/18/2024 11:00:41 AM Submission request sent to Applicant
10/17/2024 3:49:58 PM Request for Review Comments returned by EPC Stormwater Review
10/16/2024 4:03:35 PM Request for Review Comments returned by PCD Engineering Division
10/16/2024 2:44:15 PM Request for Review Comments returned by PCD Project Manager
10/15/2024 10:29:20 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/10/2024 10:28:01 AM Request for Review Comments returned by Pikes Peak Regional Building Department
10/9/2024 7:10:10 AM Request for Review Comments returned by Academy SD 20 Building Fund
10/7/2024 1:45:00 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
10/4/2024 2:46:45 PM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
10/4/2024 2:34:39 PM Request for Review Comments returned by USAFA Base Planner
10/3/2024 1:36:26 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/3/2024 11:26:43 AM Request for Review Comments returned by EPC Environmental Services
10/3/2024 9:30:38 AM Request for Review Comments returned by EPC Parks Department
10/3/2024 9:10:57 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/2/2024 2:40:17 PM Project Manager Assigned: Scott Weeks
10/2/2024 2:39:11 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
10/2/2024 2:39:09 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
10/2/2024 2:39:07 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of Woodmoor Improvement Association
10/2/2024 2:39:05 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Peter Susemihl on behalf of Walden Metropolitan Districts 1 and 2
10/2/2024 2:39:02 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Rachel Martell on behalf of USAFA Base Planner
10/2/2024 2:39:01 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by matthew. fitzsimmons on behalf of USAFA Base Planner
10/2/2024 2:38:59 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Amy Kelley on behalf of USAFA Base Planner
10/2/2024 2:38:57 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of USAFA Base Planner
10/2/2024 2:38:55 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
10/2/2024 2:38:53 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
10/2/2024 2:38:51 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
10/2/2024 2:38:49 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by General Email on behalf of Mountain View Electric Association, Inc.
10/2/2024 2:38:46 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Jeff Hodge on behalf of Donala Water and San Dist
10/2/2024 2:38:45 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Christina Hawker on behalf of Donala Water and San Dist
10/2/2024 2:38:42 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
10/2/2024 2:38:41 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Bob Swatek on behalf of Black Hills Energy-Aquila
10/2/2024 2:38:39 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Adam Magoon on behalf of Black Hills Energy-Aquila
10/2/2024 2:38:36 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Tom Gregory on behalf of Academy SD 20 Building Fund
10/2/2024 2:38:34 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Donald Smith on behalf of Academy SD 20 Building Fund
10/2/2024 2:38:32 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Becky Allan on behalf of Academy SD 20 Building Fund
10/2/2024 2:38:30 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of Pikes Peak Regional Building Department
10/2/2024 2:38:28 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/2/2024 2:38:26 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
10/2/2024 2:38:24 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
10/2/2024 2:38:22 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
10/2/2024 2:38:20 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
10/2/2024 2:38:18 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/2/2024 2:38:16 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Mikayla Hartford on behalf of EPC Stormwater Review
10/2/2024 2:38:14 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Glenn Reese on behalf of EPC Stormwater Review
10/2/2024 2:38:12 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Christina Prete on behalf of EPC Stormwater Review
10/2/2024 2:38:10 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by on behalf of EPC Parks Department
10/2/2024 2:38:08 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Mike McCarthy on behalf of EPC Health Department
10/2/2024 2:38:06 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Catherine McGarvy on behalf of EPC Health Department
10/2/2024 2:38:04 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by HEAEH LandUse on behalf of EPC Health Department
10/2/2024 2:38:02 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Kathy Andrew on behalf of EPC Environmental Services
10/2/2024 2:37:58 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Kari Parsons on behalf of PCD Project Manager
10/2/2024 2:37:56 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Gilbert LaForce on behalf of PCD Engineering Division
10/2/2024 2:37:54 PM Request for Review Comments email sent for Project Cathedral Rock Church for review by Engineering Manager on behalf of PCD Engineering Division
9/30/2024 9:58:29 AM Project Manager Assigned: Kari Parsons
9/30/2024 9:03:49 AM Fees paid: 9/30/2024 (Receipt: 1009637)
9/29/2024 7:10:41 PM Payment Request sent: 9/29/2024
9/29/2024 7:10:41 PM File # Assigned: PPR2436
9/29/2024 7:10:39 PM Submission Triaged
9/27/2024 4:42:11 PM Submission received from Applicant
8/23/2024 2:58:14 PM Submission request sent to Applicant
8/23/2024 2:53:56 PM Project Created