5/13/2025 2:22:01 PM
|
Submission request sent to Applicant
|
5/12/2025 5:07:32 PM
|
Submission request sent to Applicant
|
5/12/2025 2:41:02 PM
|
Fees paid: 5/12/2025 (Receipt: 1010512)
|
5/8/2025 11:37:45 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/1/2025 12:19:28 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/30/2025 5:30:31 PM
|
Payment Request sent: 4/30/2025
|
4/23/2025 3:06:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/21/2025 2:45:29 PM
|
Submission Triaged
|
4/21/2025 2:42:59 PM
|
Submission received from Applicant
|
4/21/2025 2:40:31 PM
|
Submission request sent to Applicant
|
4/21/2025 2:40:13 PM
|
Submission Triaged
|
4/21/2025 2:35:24 PM
|
Submission received from Applicant
|
4/21/2025 1:35:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/21/2025 1:29:48 PM
|
Submission request sent to Applicant
|
4/21/2025 7:08:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
4/21/2025 7:08:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
4/21/2025 7:08:38 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
4/21/2025 7:08:36 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
4/21/2025 7:07:39 AM
|
Submission Triaged
|
4/18/2025 8:46:10 AM
|
Submission received from Applicant
|
4/17/2025 4:29:53 PM
|
Submission request sent to Applicant
|
4/17/2025 3:40:22 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/16/2025 1:53:34 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/16/2025 1:53:33 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 (AKA Sterling Ridge East Fil 6 ) Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
4/16/2025 1:53:07 PM
|
Submission Triaged
|
4/16/2025 9:11:11 AM
|
Submission received from Applicant
|
4/16/2025 7:35:44 AM
|
Submission request sent to Applicant
|
4/15/2025 5:23:53 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/15/2025 3:59:07 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/15/2025 10:33:00 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
4/15/2025 10:32:59 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/10/2025 11:23:43 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/26/2025 7:17:48 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/26/2025 7:17:47 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/26/2025 7:17:46 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
3/26/2025 7:17:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
3/26/2025 7:17:44 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
3/26/2025 7:17:43 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
3/26/2025 7:17:41 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
3/26/2025 7:17:40 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/26/2025 7:17:39 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
3/26/2025 7:15:47 PM
|
Submission Triaged
|
3/26/2025 4:24:17 PM
|
Submission received from Applicant
|
3/5/2025 10:02:59 AM
|
Fees paid: 3/5/2025 (Receipt: 1010239)
|
3/5/2025 7:52:36 AM
|
Submission request sent to Applicant
|
3/5/2025 7:51:55 AM
|
Submission request sent to Applicant
|
3/5/2025 7:49:53 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/4/2025 3:49:03 PM
|
Payment Request sent: 3/4/2025
|
3/3/2025 9:09:57 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/24/2025 4:21:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/24/2025 4:17:12 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/24/2025 8:17:37 AM
|
Request for Review Comments returned by EPC Health Department
|
2/6/2025 11:31:22 AM
|
Request for Review Comments returned by Parks Advisory Board
|
2/6/2025 11:30:28 AM
|
Request for Review Comments returned by EPC Parks Department
|
2/4/2025 3:14:54 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of Parks Advisory Board
|
2/4/2025 3:14:53 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/4/2025 3:14:52 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/4/2025 3:14:51 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
2/4/2025 3:14:50 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of EPC Parks Department
|
2/4/2025 3:14:49 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
|
2/4/2025 3:14:48 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
2/4/2025 3:14:46 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
2/4/2025 3:14:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
2/4/2025 3:14:44 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
2/4/2025 3:14:43 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
2/4/2025 3:14:40 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
2/4/2025 3:14:39 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/4/2025 3:14:38 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
2/4/2025 3:10:34 PM
|
Submission Triaged
|
2/4/2025 2:12:29 PM
|
Submission received from Applicant
|
12/12/2024 10:45:24 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
12/5/2024 3:44:11 PM
|
Request for Review Comments returned by EPC Health Department
|
11/19/2024 7:22:06 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/18/2024 7:35:04 AM
|
Submission request sent to Applicant
|
11/18/2024 7:32:04 AM
|
Submission request sent to Applicant
|
11/16/2024 7:57:17 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
11/15/2024 11:10:41 AM
|
Request for Review Comments returned by Parks Advisory Board
|
11/14/2024 3:17:20 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/14/2024 2:37:47 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/14/2024 1:12:01 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/14/2024 9:09:51 AM
|
Request for Review Comments returned by Falcon School District 49
|
11/13/2024 5:03:48 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/13/2024 10:22:32 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
11/13/2024 9:45:08 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
11/12/2024 1:22:09 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/11/2024 10:36:35 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/8/2024 2:18:21 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/6/2024 2:44:12 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
11/4/2024 11:25:59 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
11/4/2024 9:36:28 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
11/1/2024 2:15:02 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/31/2024 1:57:47 PM
|
Request for Review Comments returned by PCD Administrative
|
10/30/2024 11:50:22 AM
|
Request for Review Comments returned by EPC Parks Department
|
10/28/2024 9:18:04 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/24/2024 1:37:21 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/24/2024 10:51:16 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/23/2024 9:47:38 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Tracey Garcia on behalf of PCD Administrative
|
10/23/2024 9:47:36 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Admin on behalf of PCD Administrative
|
10/23/2024 9:47:34 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Elena Krebs on behalf of PCD Administrative
|
10/23/2024 9:27:58 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:56 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:54 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:52 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:50 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:48 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
10/23/2024 9:27:46 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
|
10/23/2024 9:22:11 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
10/23/2024 9:22:09 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Evelyn galanephillips on behalf of Falcon School District 49
|
10/23/2024 9:22:07 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/23/2024 9:22:05 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/23/2024 9:22:03 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
10/23/2024 9:22:01 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Rae Carlson on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:59 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Patrick Morris on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:58 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:56 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:54 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Joel Metzker on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:52 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:50 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:48 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Erin Powers on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:46 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by General Email on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Dana Davison on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:43 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Brian Shevock on behalf of Colorado Springs Public Works
|
10/23/2024 9:21:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
10/23/2024 9:21:38 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
10/23/2024 9:21:36 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
10/23/2024 9:21:34 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
10/23/2024 9:21:33 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
10/23/2024 9:21:30 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
10/23/2024 9:21:28 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/23/2024 9:21:27 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/23/2024 9:21:24 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of Black Forest Fire Protection District
|
10/23/2024 9:21:22 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
10/23/2024 9:21:20 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
10/23/2024 9:21:18 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
10/23/2024 9:21:16 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
10/23/2024 9:21:14 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
10/23/2024 9:21:12 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/23/2024 9:21:10 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
10/23/2024 9:21:08 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
10/23/2024 9:21:06 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/23/2024 9:21:04 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
10/23/2024 9:21:02 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
10/23/2024 9:21:00 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/23/2024 9:20:58 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
10/23/2024 9:20:56 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/23/2024 9:20:54 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of Parks Advisory Board
|
10/23/2024 9:20:52 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
10/23/2024 9:20:50 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
10/23/2024 9:20:48 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
10/23/2024 9:20:46 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
10/23/2024 9:20:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
10/23/2024 9:20:42 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
10/23/2024 9:20:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
10/23/2024 9:20:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
10/23/2024 9:20:36 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by on behalf of EPC Parks Department
|
10/23/2024 9:20:34 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
|
10/23/2024 9:20:33 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
10/23/2024 9:20:31 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
10/23/2024 9:20:28 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/23/2024 9:20:26 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
10/23/2024 9:20:25 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
10/23/2024 9:20:23 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
10/23/2024 9:20:19 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
10/23/2024 9:20:17 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/23/2024 9:20:15 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 6 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
10/21/2024 11:28:48 AM
|
Fees paid: 10/21/2024 (Receipt: 1009736)
|
10/16/2024 9:08:52 AM
|
Payment Request sent: 10/16/2024
|
10/16/2024 9:08:52 AM
|
File # Assigned: SP244
|
10/16/2024 9:08:45 AM
|
Submission Triaged
|
10/15/2024 4:00:52 PM
|
Submission received from Applicant
|
7/29/2024 3:50:33 PM
|
Submission request sent to Applicant
|
7/29/2024 3:40:54 PM
|
Project Manager Assigned: Kari Parsons
|
7/29/2024 3:40:54 PM
|
EA Assigned: EA21117
|
7/29/2024 3:40:54 PM
|
Project Created
|