| 10/23/2025 9:08:43 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 10/23/2025 8:12:43 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 10/22/2025 10:10:06 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 10/22/2025 10:10:05 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 10/22/2025 10:10:04 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 10/22/2025 10:10:03 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 10/22/2025 10:10:02 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 10/22/2025 10:10:00 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 10/22/2025 10:09:59 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 10/22/2025 10:09:58 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/22/2025 10:09:57 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/22/2025 10:09:56 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/22/2025 10:09:54 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/22/2025 10:09:53 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 10/22/2025 10:09:52 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/22/2025 10:09:49 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 10/22/2025 10:07:58 AM | Submission Triaged | 
                
                    | 10/21/2025 6:40:37 PM | Submission received from Applicant | 
                
                    | 9/17/2025 7:02:25 AM | Submission request sent to Applicant | 
                
                    | 9/16/2025 5:20:23 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/16/2025 4:20:15 PM | Submission request sent to Applicant | 
                
                    | 9/16/2025 9:27:34 AM | Submission request sent to Applicant | 
                
                    | 9/15/2025 5:17:46 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/15/2025 4:20:15 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/2/2025 3:46:05 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 3:46:04 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 3:46:03 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 3:46:02 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 9/2/2025 3:46:00 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/2/2025 3:45:58 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 9/2/2025 3:45:57 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 1:22:16 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/25/2025 1:22:15 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Jalal Saleh on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 1:22:14 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 1:22:13 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 1:20:59 PM | Submission Triaged | 
                
                    | 8/22/2025 12:22:51 PM | Submission received from Applicant | 
                
                    | 7/10/2025 10:20:52 AM | Submission request sent to Applicant | 
                
                    | 7/9/2025 2:43:16 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 7/3/2025 7:26:25 AM | Submission request sent to Applicant | 
                
                    | 7/2/2025 6:30:18 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 7/2/2025 4:40:52 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 6/30/2025 4:56:16 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/30/2025 3:01:11 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 6/30/2025 7:06:53 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 6/30/2025 7:06:52 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 6/30/2025 7:06:51 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by April Willie on behalf of County Attorney - Water | 
                
                    | 6/24/2025 3:55:36 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 6/20/2025 3:46:57 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 6/19/2025 9:06:17 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 6/17/2025 5:03:01 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 6/17/2025 5:00:00 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 6/17/2025 4:59:59 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 6/17/2025 4:59:58 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/17/2025 4:59:57 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/17/2025 4:59:56 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/17/2025 4:59:55 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 6/17/2025 4:59:54 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 6/17/2025 4:59:52 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Parks Department | 
                
                    | 6/17/2025 4:59:51 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 6/17/2025 4:59:50 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 6/17/2025 4:59:49 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 6/17/2025 4:59:47 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 6/17/2025 4:59:46 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/17/2025 4:59:45 PM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/17/2025 4:57:38 PM | Submission Triaged | 
                
                    | 6/17/2025 11:50:57 AM | Submission received from Applicant | 
                
                    | 5/2/2025 5:08:10 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 4/16/2025 8:05:11 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 4/10/2025 8:50:10 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 4/7/2025 6:16:13 AM | Submission request sent to Applicant | 
                
                    | 4/6/2025 7:25:19 AM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 4/4/2025 10:42:33 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 4/3/2025 2:36:05 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 4/3/2025 12:11:11 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 4/1/2025 6:17:45 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/1/2025 2:46:43 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/1/2025 1:49:27 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 3/31/2025 3:59:44 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 3/31/2025 10:38:12 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 3/26/2025 7:40:01 AM | Request for Review Comments returned by Falcon School District 49 | 
                
                    | 3/24/2025 11:02:45 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 3/20/2025 10:13:14 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 3/20/2025 10:13:02 AM | Fees paid: 3/20/2025 (Receipt: 1010317) | 
                
                    | 3/19/2025 7:14:38 AM | Payment Request sent: 3/19/2025 | 
                
                    | 3/18/2025 3:21:46 PM | Request for Review Comments returned by Road Impact Fee Administrator | 
                
                    | 3/18/2025 9:38:51 AM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 3/12/2025 1:32:22 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 3/11/2025 12:50:37 PM | Request for Review Comments returned by US Postal Service | 
                
                    | 3/11/2025 9:50:38 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 3/11/2025 8:45:22 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 3/11/2025 8:45:20 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 3/11/2025 8:01:50 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 3/11/2025 7:34:59 AM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 3/11/2025 7:24:02 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 3/11/2025 7:24:00 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Evelyn galanephillips on behalf of Falcon School District 49 | 
                
                    | 3/11/2025 7:23:59 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 3/11/2025 7:23:58 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 3/11/2025 7:23:57 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:56 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:55 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:54 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:53 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:52 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:51 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:50 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 3/11/2025 7:23:48 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 3/11/2025 7:23:47 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 3/11/2025 7:23:46 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 3/11/2025 7:23:45 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 3/11/2025 7:23:44 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 3/11/2025 7:23:43 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 3/11/2025 7:23:42 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 3/11/2025 7:23:40 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 3/11/2025 7:23:39 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 3/11/2025 7:23:38 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 3/11/2025 7:23:37 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 3/11/2025 7:23:36 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Rita Otega on behalf of US Postal Service | 
                
                    | 3/11/2025 7:23:35 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Peyton Post Office on behalf of US Postal Service | 
                
                    | 3/11/2025 7:23:34 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 3/11/2025 7:23:33 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 3/11/2025 7:23:32 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 3/11/2025 7:23:31 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 3/11/2025 7:23:30 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 3/11/2025 7:23:28 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 3/11/2025 7:23:27 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 3/11/2025 7:23:26 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator | 
                
                    | 3/11/2025 7:23:25 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of Parks Advisory Board | 
                
                    | 3/11/2025 7:23:24 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 3/11/2025 7:23:23 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 3/11/2025 7:23:21 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 3/11/2025 7:23:20 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 3/11/2025 7:23:19 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 3/11/2025 7:23:18 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 3/11/2025 7:23:17 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 3/11/2025 7:23:16 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 3/11/2025 7:23:15 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of EPC Parks Department | 
                
                    | 3/11/2025 7:23:14 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 3/11/2025 7:23:13 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 3/11/2025 7:23:11 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 3/11/2025 7:23:10 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 3/11/2025 7:23:09 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 3/11/2025 7:23:08 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 3/11/2025 7:23:07 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 3/11/2025 7:23:05 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 3/11/2025 7:23:03 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 3/11/2025 7:23:02 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 3/11/2025 7:23:01 AM | Request for Review Comments email sent for Project Retreat at Prairie Ridge Filing No 1 for review by  on behalf of PCD Administrative Notice | 
                
                    | 3/10/2025 4:00:26 PM | Fees paid: 3/10/2025 (Receipt: 1010260) | 
                
                    | 3/10/2025 7:34:29 AM | Payment Request sent: 3/10/2025 | 
                
                    | 3/10/2025 7:34:28 AM | File # Assigned: SF257 | 
                
                    | 3/10/2025 7:34:24 AM | Submission Triaged | 
                
                    | 3/7/2025 4:24:02 PM | Submission received from Applicant | 
                
                    | 10/31/2024 8:56:17 AM | Submission request sent to Applicant | 
                
                    | 10/29/2024 4:57:35 PM | Submission request sent to Applicant | 
                
                    | 6/20/2024 7:36:00 AM | Submission request sent to Applicant | 
                
                    | 5/30/2024 7:01:42 AM | Submission request sent to Applicant | 
                
                    | 5/29/2024 5:29:55 PM | Project Manager Assigned: Kari Parsons | 
                
                    | 5/29/2024 5:29:55 PM | Project Created |