| 10/30/2025 1:23:02 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/30/2025 12:47:38 PM | Submission request sent to Applicant | 
                
                    | 10/29/2025 3:35:28 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 10/28/2025 6:07:37 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/28/2025 3:07:06 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/14/2025 4:34:24 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 10/14/2025 4:34:23 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 10/14/2025 4:34:22 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 10/14/2025 4:34:21 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 10/14/2025 4:34:20 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/14/2025 4:34:19 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/14/2025 4:34:18 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/14/2025 4:34:16 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/14/2025 4:34:14 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 10/14/2025 4:34:13 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/14/2025 4:11:19 PM | Submission Triaged | 
                
                    | 10/13/2025 3:15:20 PM | Submission received from Applicant | 
                
                    | 9/30/2025 3:09:21 PM | Submission request sent to Applicant | 
                
                    | 9/25/2025 1:12:25 PM | Request for Review Comments returned by Colorado Springs Airport Advisory Commission | 
                
                    | 9/19/2025 5:03:54 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 9/15/2025 2:31:59 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 9/8/2025 3:35:09 PM | Submission request sent to Applicant | 
                
                    | 9/8/2025 2:47:22 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/4/2025 5:32:23 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/4/2025 5:31:33 PM | Request for Review Comments email resent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/4/2025 5:30:45 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/4/2025 3:52:00 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/3/2025 3:13:31 PM | Request for Review Comments returned by Cherokee Metro Dist | 
                
                    | 9/2/2025 4:18:26 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/28/2025 12:24:27 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 8/21/2025 2:56:10 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 8/21/2025 1:37:38 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:37 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:36 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:35 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:34 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:33 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:32 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:31 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 8/21/2025 1:37:29 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 8/21/2025 1:37:28 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 8/21/2025 1:37:27 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 8/21/2025 1:37:26 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 8/21/2025 1:37:25 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 8/21/2025 1:37:24 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:37:23 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:37:22 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:37:20 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/21/2025 1:37:19 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Jalal Saleh on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:37:17 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:37:16 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:36:04 PM | Request for Review Comments sent for Project 8145 SANDY CT - Site Development Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 8/21/2025 1:35:44 PM | Request for Review Comments sent for Project 8145 SANDY CT - Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 8/21/2025 1:35:05 PM | Request for Review Comments sent for Project 8145 SANDY CT - Site Development Plan for review by Brandon Zembles on behalf of Cherokee Metro Dist | 
                
                    | 8/21/2025 1:34:41 PM | Request for Review Comments sent for Project 8145 SANDY CT - Site Development Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 8/21/2025 1:34:16 PM | Request for Review Comments sent for Project 8145 SANDY CT - Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 8/21/2025 12:22:02 PM | Submission Triaged | 
                
                    | 8/20/2025 10:51:54 AM | Submission received from Applicant | 
                
                    | 6/27/2025 8:31:46 AM | Submission request sent to Applicant | 
                
                    | 6/26/2025 5:43:07 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 6/26/2025 1:27:11 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 6/25/2025 4:29:09 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/17/2025 11:07:40 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 6/4/2025 2:13:20 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 6/4/2025 2:13:19 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/4/2025 2:13:18 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/4/2025 2:13:17 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/4/2025 2:13:15 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 6/4/2025 2:13:14 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/4/2025 2:13:13 PM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/2/2025 10:26:26 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 6/2/2025 10:26:25 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/2/2025 10:26:24 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/2/2025 10:26:23 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/2/2025 10:26:22 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 6/2/2025 10:26:21 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 6/2/2025 10:26:20 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 6/2/2025 10:26:18 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 6/2/2025 10:26:17 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/2/2025 10:26:16 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/2/2025 9:41:09 AM | Submission Triaged | 
                
                    | 5/30/2025 4:17:14 PM | Submission received from Applicant | 
                
                    | 3/5/2025 11:52:08 AM | Request for Review Comments returned by Cherokee Metro Dist | 
                
                    | 3/2/2025 9:44:14 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 2/24/2025 9:11:23 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 2/24/2025 9:11:22 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 2/24/2025 9:11:21 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 2/23/2025 8:59:56 PM | Submission request sent to Applicant | 
                
                    | 2/20/2025 6:07:02 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 2/19/2025 1:32:26 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 2/18/2025 4:59:15 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 2/18/2025 4:09:21 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 2/14/2025 3:35:54 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 2/14/2025 8:35:03 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 2/5/2025 8:12:23 AM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 2/3/2025 11:39:49 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 2/3/2025 11:39:48 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 2/3/2025 11:39:47 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 2/3/2025 11:39:45 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:44 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:43 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:42 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:41 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:40 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:39 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:38 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 2/3/2025 11:39:36 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 2/3/2025 11:39:35 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Jeff Munger on behalf of Cherokee Metro Dist | 
                
                    | 2/3/2025 11:39:34 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Brandon Zembles on behalf of Cherokee Metro Dist | 
                
                    | 2/3/2025 11:39:33 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 2/3/2025 11:39:32 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 2/3/2025 11:39:31 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 2/3/2025 11:39:30 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 2/3/2025 11:39:29 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 2/3/2025 11:39:28 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 2/3/2025 11:39:26 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 2/3/2025 11:39:24 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 2/3/2025 11:39:23 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 2/3/2025 11:39:22 AM | Request for Review Comments email sent for Project 8145 SANDY CT - Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 2/3/2025 9:56:06 AM | Fees paid: 2/3/2025 (Receipt: 1010115) | 
                
                    | 2/3/2025 9:05:40 AM | Payment Request sent: 2/3/2025 | 
                
                    | 2/3/2025 9:05:34 AM | Submission Triaged | 
                
                    | 1/31/2025 3:37:31 PM | Submission received from Applicant | 
                
                    | 1/21/2025 1:17:06 PM | Submission request sent to Applicant | 
                
                    | 9/30/2024 3:13:31 PM | Submission request sent to Applicant | 
                
                    | 9/3/2024 4:10:35 PM | Submission request sent to Applicant | 
                
                    | 6/13/2024 3:45:17 PM | Submission request sent to Applicant | 
                
                    | 6/13/2024 3:43:35 PM | Submission request canceled | 
                
                    | 6/13/2024 3:29:57 PM | Submission request sent to Applicant | 
                
                    | 6/13/2024 3:28:39 PM | Submission request canceled | 
                
                    | 6/13/2024 3:26:57 PM | Submission request sent to Applicant | 
                
                    | 2/7/2024 3:12:49 PM | Submission request sent to Applicant | 
                
                    | 1/24/2024 8:44:12 AM | Submission request sent to Applicant | 
                
                    | 1/24/2024 8:05:40 AM | File # Assigned: PPR241 | 
                
                    | 1/23/2024 11:21:58 AM | Project Manager Assigned: Lacey Dean | 
                
                    | 1/23/2024 11:21:58 AM | Project Created |