7/18/2025 10:20:28 AM
|
Project Closed
|
7/18/2025 10:20:28 AM
|
Project Approved: 7/18/2025
|
7/15/2025 12:08:01 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
7/15/2025 12:06:11 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/9/2025 9:38:14 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/8/2025 2:30:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/8/2025 9:00:13 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/3/2025 12:53:14 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
7/3/2025 12:53:13 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/3/2025 12:53:12 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/3/2025 12:53:11 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
7/3/2025 12:53:10 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
7/3/2025 12:53:09 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
7/3/2025 12:53:08 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by April Willie on behalf of County Attorney - Development Review
|
7/3/2025 12:53:06 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
7/3/2025 12:53:05 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/3/2025 12:53:03 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
7/3/2025 12:41:09 PM
|
Submission Triaged
|
7/2/2025 7:22:43 PM
|
Submission received from Applicant
|
6/23/2025 3:38:43 PM
|
Submission request sent to Applicant
|
6/23/2025 2:56:28 PM
|
Submission request sent to Applicant
|
6/23/2025 2:43:51 PM
|
Submission request sent to Applicant
|
6/23/2025 2:39:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/23/2025 2:36:06 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/23/2025 1:43:48 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/23/2025 12:17:19 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/20/2025 10:58:40 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
6/20/2025 10:58:39 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/20/2025 10:58:38 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/20/2025 10:58:38 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
6/20/2025 10:58:35 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
6/20/2025 10:58:34 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/20/2025 10:58:32 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
6/20/2025 10:58:03 AM
|
Submission Triaged
|
6/20/2025 10:35:02 AM
|
Submission received from Applicant
|
6/19/2025 3:27:29 PM
|
Submission request sent to Applicant
|
6/10/2025 2:39:06 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
6/3/2025 9:21:08 AM
|
Submission request sent to Applicant
|
6/3/2025 9:17:34 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/3/2025 9:15:53 AM
|
Request for Review Comments email resent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
6/2/2025 6:54:02 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/2/2025 2:55:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/2/2025 7:58:32 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/19/2025 1:43:02 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
5/19/2025 1:04:14 PM
|
Request for Review Comments returned by Woodmen Road Metro
|
5/19/2025 12:44:46 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
5/19/2025 12:44:45 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Steve Knepper on behalf of Paint Brush Hills Metro
|
5/19/2025 12:44:44 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Robert Guevara on behalf of Paint Brush Hills Metro
|
5/19/2025 12:44:43 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/19/2025 12:44:42 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
|
5/19/2025 12:44:41 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
5/19/2025 12:44:40 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
5/19/2025 12:44:39 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
5/19/2025 12:44:38 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
5/19/2025 12:44:36 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
5/19/2025 12:44:35 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
5/19/2025 12:44:34 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Osborne on behalf of Colorado State Land Board
|
5/19/2025 12:44:33 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by on behalf of Colorado Department of Public Health and Environment
|
5/19/2025 12:44:32 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
|
5/19/2025 12:44:31 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
5/19/2025 12:44:30 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/19/2025 12:44:29 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/19/2025 12:44:28 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
5/19/2025 12:44:26 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mike McCarthy on behalf of EPC Health Department
|
5/19/2025 12:44:25 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
5/19/2025 12:44:24 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
5/19/2025 12:44:22 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
5/19/2025 12:44:21 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/19/2025 12:44:19 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
5/19/2025 12:18:04 PM
|
Submission Triaged
|
5/19/2025 11:24:54 AM
|
Submission received from Applicant
|
5/19/2025 9:27:30 AM
|
Submission request sent to Applicant
|
5/19/2025 8:30:03 AM
|
Submission request sent to Applicant
|
3/20/2025 8:02:17 AM
|
Submission request sent to Applicant
|
3/4/2025 9:33:49 AM
|
Request for Review Comments returned by Falcon School District 49
|
2/27/2025 4:03:38 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
2/10/2025 3:11:36 PM
|
Request for Review Comments returned by Paint Brush Hills Metro
|
2/7/2025 11:44:39 AM
|
Submission request sent to Applicant
|
2/6/2025 12:01:59 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/5/2025 3:17:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/4/2025 4:44:47 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/4/2025 12:31:06 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Steve Knepper on behalf of Paint Brush Hills Metro
|
2/4/2025 12:31:05 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Robert Guevara on behalf of Paint Brush Hills Metro
|
2/4/2025 12:31:03 PM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Osborne on behalf of Colorado State Land Board
|
2/4/2025 10:07:09 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/31/2025 4:48:54 PM
|
Request for Review Comments returned by EPC Health Department
|
1/31/2025 12:11:09 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
1/31/2025 10:12:53 AM
|
Request for Review Comments email resent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
1/31/2025 9:50:50 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
1/31/2025 9:32:19 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
1/30/2025 8:04:11 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/28/2025 8:51:51 AM
|
Project Manager Assigned: Miranda Benson
|
1/27/2025 1:02:01 PM
|
Request for Review Comments returned by Woodmen Hills Metro
|
1/27/2025 8:55:08 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/27/2025 6:59:04 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
1/27/2025 6:59:03 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Wally Eaves on behalf of Woodmen Hills Metro
|
1/27/2025 6:59:02 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Daniel Cole on behalf of Woodmen Hills Metro
|
1/27/2025 6:59:01 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by on behalf of Woodmen Hills Metro
|
1/27/2025 6:59:00 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/27/2025 6:58:59 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Evelyn galanephillips on behalf of Falcon School District 49
|
1/27/2025 6:58:57 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
|
1/27/2025 6:58:56 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
1/27/2025 6:58:55 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
1/27/2025 6:58:54 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
1/27/2025 6:58:53 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
1/27/2025 6:58:52 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
1/27/2025 6:58:51 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
1/27/2025 6:58:50 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by on behalf of Pikes Peak Regional Building Department
|
1/27/2025 6:58:49 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/27/2025 6:58:48 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/27/2025 6:58:46 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by on behalf of Colorado Department of Public Health and Environment
|
1/27/2025 6:58:45 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
|
1/27/2025 6:58:44 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mike McCarthy on behalf of EPC Health Department
|
1/27/2025 6:58:43 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
1/27/2025 6:58:42 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
1/27/2025 6:56:56 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/27/2025 6:56:55 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/27/2025 6:56:54 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
1/27/2025 6:56:52 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
1/27/2025 6:56:50 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/27/2025 6:56:49 AM
|
Request for Review Comments email sent for Project WHMD Theriot Tank Rebuild Site Dev Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
1/24/2025 12:49:31 PM
|
Fees paid: 1/24/2025 (Receipt: 1010086)
|
1/6/2025 8:44:51 AM
|
Payment Request sent: 1/6/2025
|
1/6/2025 8:44:51 AM
|
File # Assigned: PPR251
|
1/6/2025 8:44:45 AM
|
Submission Triaged
|
1/6/2025 7:57:20 AM
|
Submission received from Applicant
|
4/17/2024 3:46:18 PM
|
Project Manager Assigned: Kari Parsons
|
12/14/2023 11:15:28 AM
|
Project Manager Assigned: Christian Haas
|
10/23/2023 7:43:30 AM
|
Submission request sent to Applicant
|
10/23/2023 7:39:35 AM
|
Project Manager Assigned: Lekishia Bellamy
|
10/23/2023 7:39:35 AM
|
Project Created
|