2/3/2025 11:48:19 AM
|
Project Closed
|
2/3/2025 11:48:19 AM
|
Project Approved: 2/3/2025
|
2/3/2025 11:47:40 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/17/2025 11:07:35 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/17/2025 10:10:52 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/17/2025 7:46:44 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
1/17/2025 7:46:43 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/17/2025 7:46:42 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/17/2025 7:46:39 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
1/17/2025 7:44:49 AM
|
Submission Triaged
|
1/15/2025 6:56:42 PM
|
Submission received from Applicant
|
1/7/2025 3:41:06 PM
|
Submission request sent to Applicant
|
12/9/2024 1:59:33 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/9/2024 1:24:19 PM
|
Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/6/2024 3:40:48 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/4/2024 8:09:50 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/3/2024 3:07:43 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/3/2024 3:05:49 PM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
12/3/2024 2:47:48 PM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/3/2024 2:47:46 PM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
12/3/2024 11:59:27 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/19/2024 8:30:44 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
11/19/2024 8:30:42 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/19/2024 8:30:40 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
11/14/2024 10:49:58 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/13/2024 1:09:37 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/13/2024 1:00:27 PM
|
Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
11/13/2024 12:41:38 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/13/2024 11:37:54 AM
|
Submission Triaged
|
11/13/2024 11:34:24 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
11/13/2024 11:34:22 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
11/13/2024 11:34:20 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
11/12/2024 2:28:54 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/12/2024 2:25:02 PM
|
Submission received from Applicant
|
11/12/2024 2:13:23 PM
|
Submission request sent to Applicant
|
11/12/2024 11:34:39 AM
|
Submission request sent to Applicant
|
11/12/2024 11:34:14 AM
|
Submission Triaged
|
11/11/2024 1:57:13 PM
|
Submission received from Applicant
|
11/8/2024 2:03:30 PM
|
Submission request sent to Applicant
|
11/8/2024 11:02:14 AM
|
Fees paid: 11/8/2024 (Receipt: 1009817)
|
11/8/2024 10:48:31 AM
|
Payment Request sent: 11/8/2024
|
11/7/2024 12:44:17 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/4/2024 3:57:51 PM
|
Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
11/4/2024 3:55:54 PM
|
Submission request sent to Applicant
|
11/4/2024 3:54:56 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/4/2024 3:03:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/4/2024 8:55:47 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/29/2024 8:38:44 AM
|
Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
10/28/2024 5:48:11 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/28/2024 11:34:31 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/24/2024 11:35:52 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/21/2024 4:51:04 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/21/2024 10:03:36 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
|
10/21/2024 10:03:34 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
10/21/2024 10:03:32 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/21/2024 10:03:30 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
10/21/2024 10:03:28 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/21/2024 10:03:26 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
10/21/2024 10:03:24 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/21/2024 10:03:20 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
10/21/2024 10:03:18 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
10/21/2024 10:03:17 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
10/21/2024 10:03:15 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
10/21/2024 10:03:13 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
10/21/2024 10:03:11 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
10/21/2024 10:03:07 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
10/21/2024 10:03:05 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/21/2024 10:03:03 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
10/21/2024 9:55:56 AM
|
Submission Triaged
|
10/18/2024 8:58:47 AM
|
Submission received from Applicant
|
10/11/2024 5:13:50 PM
|
Request for Review Comments returned by EPC Health Department
|
10/1/2024 12:28:24 PM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
9/24/2024 10:42:10 AM
|
Submission request sent to Applicant
|
9/23/2024 9:43:39 AM
|
Request for Review Comments returned by US Forest Service, Pikes Peak Ranger District
|
9/20/2024 8:04:21 AM
|
Submission request sent to Applicant
|
9/20/2024 8:03:44 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/19/2024 4:49:05 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/18/2024 3:26:19 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/17/2024 5:34:47 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/12/2024 7:15:49 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/10/2024 2:24:05 PM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
9/10/2024 11:48:53 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/10/2024 9:11:24 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
9/6/2024 11:42:39 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/4/2024 11:34:47 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/3/2024 12:01:33 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/30/2024 3:41:26 PM
|
Request for Review Comments returned by Misty Acres Metro
|
8/29/2024 2:53:31 PM
|
Request for Review Comments returned by EPC Environmental Services
|
8/29/2024 9:44:25 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
8/29/2024 9:44:24 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
|
8/29/2024 9:44:22 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
8/29/2024 9:44:20 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
|
8/29/2024 9:44:17 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Chester Sawyer on behalf of Misty Acres Metro
|
8/29/2024 9:44:16 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Bussa on behalf of Misty Acres Metro
|
8/29/2024 9:44:13 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Douglas County on behalf of Douglas County Planning
|
8/29/2024 9:44:11 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
8/29/2024 9:44:09 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/29/2024 9:44:08 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
8/29/2024 9:44:06 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
|
8/29/2024 9:44:04 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
8/29/2024 9:44:02 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/29/2024 9:44:00 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/29/2024 9:43:58 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
8/29/2024 9:43:55 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/29/2024 9:43:53 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
8/29/2024 9:43:52 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/29/2024 9:43:48 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
8/29/2024 9:43:46 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
8/29/2024 9:43:44 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
8/29/2024 9:43:42 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
8/29/2024 9:43:40 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Colorado Department of Public Health and Environment
|
8/29/2024 9:43:38 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/29/2024 9:43:36 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/29/2024 9:43:34 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
8/29/2024 9:43:32 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
8/29/2024 9:43:31 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
8/29/2024 9:43:29 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
8/29/2024 9:43:27 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
8/29/2024 9:43:25 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
8/29/2024 9:43:23 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
|
8/29/2024 9:43:21 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
8/29/2024 9:43:19 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
8/29/2024 9:43:17 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/29/2024 9:43:15 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
8/29/2024 9:43:13 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
8/29/2024 9:43:11 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
8/29/2024 9:43:09 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
8/29/2024 9:43:07 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
8/29/2024 9:43:05 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
|
8/29/2024 9:43:02 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/29/2024 9:43:00 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/29/2024 9:42:58 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
8/29/2024 9:30:02 AM
|
Submission Triaged
|
8/29/2024 9:27:05 AM
|
Submission received from Applicant
|
7/8/2024 11:27:09 AM
|
Request for Review Comments returned by Monument
|
7/8/2024 11:25:08 AM
|
Submission request sent to Applicant
|
7/8/2024 11:24:18 AM
|
Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
|
7/8/2024 11:21:39 AM
|
Submission request canceled
|
6/24/2024 3:29:09 PM
|
Submission request sent to Applicant
|
6/18/2024 3:38:06 PM
|
Request for Review Comments returned by Parks Advisory Board
|
6/18/2024 10:17:29 AM
|
Submission request sent to Applicant
|
6/18/2024 10:16:56 AM
|
Submission request sent to Applicant
|
6/18/2024 10:15:13 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/18/2024 10:13:38 AM
|
Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
6/17/2024 11:58:07 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/14/2024 1:53:21 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/14/2024 1:49:41 PM
|
Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
6/14/2024 1:38:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/13/2024 3:51:11 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
6/13/2024 2:43:09 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/12/2024 11:45:24 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
6/11/2024 11:37:15 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/11/2024 10:42:57 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
6/10/2024 2:06:58 PM
|
Fees paid: 6/10/2024 (Receipt: 1009218)
|
6/10/2024 10:09:15 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/10/2024 10:03:55 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/10/2024 9:17:47 AM
|
Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
|
6/7/2024 9:38:38 AM
|
Request for Review Comments returned by EPC Environmental Services
|
6/6/2024 8:23:26 AM
|
Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by Vicki Wood on behalf of Lewis Palmer 38
|
6/5/2024 12:49:41 PM
|
Payment Request sent: 6/5/2024
|
6/5/2024 10:53:28 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
6/5/2024 10:18:59 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/4/2024 4:13:25 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
6/4/2024 10:46:58 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/4/2024 7:30:50 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/31/2024 2:57:38 PM
|
Request for Review Comments returned by EPC Parks Department
|
5/24/2024 9:03:25 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
5/23/2024 4:53:50 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/23/2024 1:42:24 PM
|
Request for Review Comments returned by RBD Floodplain
|
5/23/2024 11:30:12 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
5/23/2024 11:30:11 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
|
5/23/2024 11:30:09 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
5/23/2024 11:30:07 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
|
5/23/2024 11:30:05 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
5/23/2024 11:30:03 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/23/2024 11:30:01 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
|
5/23/2024 11:29:59 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Chester Sawyer on behalf of Misty Acres Metro
|
5/23/2024 11:29:56 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Douglas County on behalf of Douglas County Planning
|
5/23/2024 11:29:54 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
5/23/2024 11:29:52 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
5/23/2024 11:29:50 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
5/23/2024 11:29:48 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
5/23/2024 11:29:46 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
|
5/23/2024 11:29:44 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
5/23/2024 11:29:43 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
5/23/2024 11:29:40 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
|
5/23/2024 11:29:39 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
5/23/2024 11:29:37 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/23/2024 11:29:35 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/23/2024 11:29:33 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
5/23/2024 11:29:31 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
5/23/2024 11:29:28 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
5/23/2024 11:29:26 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
5/23/2024 11:29:25 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
5/23/2024 11:29:23 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
5/23/2024 11:29:21 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
5/23/2024 11:29:19 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
5/23/2024 11:29:17 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
5/23/2024 11:29:15 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
5/23/2024 11:29:13 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
5/23/2024 11:29:11 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
5/23/2024 11:29:09 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
5/23/2024 11:29:07 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Parks Advisory Board
|
5/23/2024 11:29:05 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/23/2024 11:29:03 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/23/2024 11:29:02 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/23/2024 11:29:00 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
5/23/2024 11:28:58 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
5/23/2024 11:28:56 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
5/23/2024 11:28:54 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
5/23/2024 11:28:52 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
5/23/2024 11:28:50 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
|
5/23/2024 11:28:48 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Parks Department
|
5/23/2024 11:28:46 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
|
5/23/2024 11:28:44 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
5/23/2024 11:28:42 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
5/23/2024 11:28:40 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
5/23/2024 11:28:38 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mindy Schulz on behalf of EPC Code Enforcement
|
5/23/2024 11:28:36 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
|
5/23/2024 11:28:34 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
|
5/23/2024 11:28:32 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
|
5/23/2024 11:28:30 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
5/23/2024 11:28:28 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
5/23/2024 11:28:26 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
|
5/23/2024 11:28:25 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
5/23/2024 11:28:23 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/23/2024 11:28:21 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
5/23/2024 11:28:19 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of PCD Administrative Notice
|
5/23/2024 11:28:17 AM
|
Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Miranda Benson on behalf of PCD Administrative Notice
|
5/23/2024 11:23:41 AM
|
Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of PCD Administrative Notice
|
5/23/2024 11:07:30 AM
|
Fees paid: 5/23/2024 (Receipt: 1009171)
|
5/20/2024 3:03:17 PM
|
Payment Request sent: 5/20/2024
|
5/20/2024 3:03:17 PM
|
File # Assigned: SP241
|
5/20/2024 3:03:07 PM
|
Submission Triaged
|
5/20/2024 1:54:28 PM
|
Submission received from Applicant
|
5/20/2024 10:57:55 AM
|
Submission request sent to Applicant
|
5/20/2024 10:57:11 AM
|
Submission Triaged
|
5/20/2024 10:29:15 AM
|
Submission received from Applicant
|
5/20/2024 7:38:23 AM
|
Submission request sent to Applicant
|
5/20/2024 7:38:09 AM
|
Submission Triaged
|
5/17/2024 2:26:18 PM
|
Submission received from Applicant
|
10/23/2023 9:15:28 AM
|
Submission request sent to Applicant
|
10/3/2023 11:39:08 AM
|
Submission request sent to Applicant
|
10/3/2023 8:07:24 AM
|
Submission request sent to Applicant
|
10/3/2023 8:04:34 AM
|
Submission request canceled
|
10/2/2023 3:54:38 PM
|
Submission request sent to Applicant
|
9/20/2023 10:44:42 AM
|
Project Manager Assigned: Kylie Bagley
|
9/20/2023 10:44:42 AM
|
EA Assigned: EA2388
|
9/20/2023 10:44:42 AM
|
Project Created
|