Project Details

Search


File Number
SP241
Project Name
Monument Ridge East Preliminary Plan
Parcels
7102200006 7102200006 7102200008 7102200008 7102200010 7102200010 7102200013 7102200013 7102201001 7102201001
Applicant
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
EA Number
EA2388
File Prefix
SP - Preliminary Plan
Year
2024
Project Manager
Kylie Bagley
Status
Closed
Created
9/20/2023 10:44:12 AM

View: Review Comments


Approved Documents (5)

Link Document
View Drainage Report - Preliminary
View Traffic Impact Study
View Deviation 1 -- access spacing along Misty Acres
View Deviation 2 -- Urban Collector standards
View Deviation 3 -- County Line Road


Additional Documents (124)

Link Document Comment
View Mailing Labels 99 sent out 6/4/24 MM
View Neighbor Notification 99 sent out 6/4/24
View Selected Range (500 ft) Map MM
View Returned Mail - 6/14/2024
View Returned Mail 6/25/2024
View Notarized Affidavit for Notice of Public Hearing
View Hearing Notice & Vicinity Map Hearing Notice for the Planning Commission hearing on 11/21/2024 (CENTENNIAL HALL) and the Board of County Commissioners hearing on 12/12/2024. MB
View Mailing Labels Mailing Labels for the 98 surrounding property owners that received notices. PCD mailed the letters on 11/7/2024. Cost included with P246 notice (combined). MB
View Selected Range Selected Range was 500 feet. MB
View PC & BOCC Poster Poster for the Planning Commission hearing on 11/21/2024 (CENTENNIAL HALL) and the Board of County Commissioners hearing on 12/12/2024. MB
View PC Hearing Agenda Hearing Agenda for the Planning Commission hearing on 11/21/2024. *LOCATED AT CENTENNIAL HALL* MB
View Public Opposition - Roche, Joni
View Public Opposition - Wilcox, Cathy
View Public Opposition - Pollack, Candice
View Public Opposition - Roche, Joni 2nd email
View Public Opposition - Kellar, Aaron
View Public Opposition - Kellar, Laura 2nd email
View Public Opposition - Kellar, Laura 2nd email
View Public Opposition - Foy, Grace
View Public Opposition - Gorman, Tina
View Public Opposition - Gorman, Jon
View Public Opposition - Hagopian, Annette
View Public Opposition - Walter, Janell
View Public Opposition - Doerner, Brandy
View Public Opposition - Ford-Wilkinson Rachel
View Public Opposition - Arbury, Heidi
View Public Opposition - Draper, Steve
View Public Opposition - Foy, Mike
View Public Opposition - Shea, Hannah
View PC Staff Report - final with attachments Staff Report for the Planning Commission hearing on 11/21/2024. MB **AT CENTENNIAL HALL**
View Posters on Property
View Public Comment Opposition - Kellar, Laura
View Public Comment Opposition - Wood, Garcia
View Public Comment Opposition - Wade, Stacy
View Returned Notice - 11/15/2024
View Returned Notice - 11/15/2024
View Returned Notice - 11/15/2024
View Public Comment Opposition - Anonymous
View Public Comment Opposition - Campbell, Chris and Shannon
View Public Comment Opposition - Lucero, Laura
View Public Comment Opposition - Smith, Susan
View Public Comment Opposition - Dinan, Amy
View Public Comment Opposition - Fowler, Joy
View Public Comment Opposition - MacDuff, Joan
View Public Comment Opposition - Mitchell, Henry
View Public Comment Opposition - Miller, D.Michael
View Public Comment Opposition - Griesser, Thomas
View Public Comment Opposition - Markle, Scott and Stephanie
View Public Comment Opposition - Nagaraj, Scheri
View Public Comment Opposition - Metzger, Nolene
View Public Comment Opposition - Craig, Karen
View Public Comment Opposition - Baker, Janelle
View Public Comment Opposition - Bender, John
View Public Comment Opposition - Strauser, Regina
View Public Comment Opposition - Van Cura, Robert and Karen
View Public Comment Opposition - Widdison, Mary
View Public Comment Opposition - Bean, Daniel
View Public Comment Opposition - Foust, Jim and Linda
View Public Comment Opposition - Abbott, Sana
View Public Comment Opposition - Austin, Ali
View Public Comment Opposition - Austin, Ryan
View Public Comment Opposition - Horvat, Ljubica & Credeur, Chad
View Public Comment Opposition - King, Steve - Monument Mayor Pro Tem
View Public Comment Opposition - LeMond, Catherine and Jacques
View Public Comment Opposition - Lewandowski, Darin
View Public Comment Opposition - Nafziger, Emmanuelle
View Public Comment Opposition - Vescent, Heather
View Public Comment Opposition - Beck, William and Virginia
View Public Comment Opposition - Harris, Beth
View Public Comment Opposition - Makarov, Jennifer
View Public Comment Opposition - Schmidt, Michael and Rebecca
View Public Comment Opposition - Hagopian, Jon and Michelle
View Public Comment Opposition - Hanks, Leslie
View Public Comment Opposition - McNally, Jane
View Public Comment Opposition - Wagner, Jennifer
View Public Comment Opposition - Padgett, Ryan
View Public Comment Opposition - Butler, Ben
View Public Comment Opposition - Bell, Lorraine
View Public Comment Opposition - Currie, Kellie
View Public Comment Opposition - Kearney-Smith, Amanda
View Opposition - Cleaver, Jamison
View Opposition - Baker, Janelle
View Public Comment Opposition - Pirog, Paul
View Signed PC Resolution Recommendation from the Planning Commission hearing on 11/21/2024. MB
View Public Comment Opposition - Brown, D Edwin
View Public Comment Opposition - Foy, Grace
View Returned Notice - 11/27/2024
View Public Comment Opposition - McPherson, Sarah
View Public Comment Opposition - Dawson, Angie
View Public Comment Opposition - Grob, Darren
View Public Comment Opposition - Norton, Sandi
View Public Comment Opposition - Doan, Brandy
View Public Comment Opposition - Holland, Jackie
View BOCC Staff Report - final with attachments Staff Report for the Board of County Commissioners hearing on 12/12/2024. MB
View Public Comment Opposition - Stevenson, Kari
View Public Comment Opposition - Kinney, Tayler
View Adopted PC Minutes Adopted Minutes from the Planning Commission hearing on 11/21/2024. MB
View Public Comment Opposition - Gammell, Amy
View BOCC Hearing Agenda Hearing Agenda for the Board of County Commissioners hearing on 12/12/2024. MB
View Public Comment Opposition - Shipley, Avery
View Public Comment Opposition - Korn, Andrea
View Public Comment Opposition - McPherson, Peter
View Public Comment Opposition - Claypool, Mia
View Public Comment Opposition - Beverly, Christie
View Public Comment Opposition - Kellar, Laura
View Public Comment Opposition - Beverly, Caitlin
View Public Comment Opposition - Johnson, Anne
View Public Comment Opposition - Sidebotham, Peter
View Public Comment Opposition - Horvat, Ljubica & Credeur, Chad
View Public Comment Opposition - Buntyn, Theresa
View Public Comment Opposition - Ehresman, Kari
View Public Comment Opposition - Tivnan, Amanda
View Public Comment Opposition - Leiting, Kristopher
View Public Comment Opposition - Cherryhomes, Lisa
View Public Comment Opposition - Hill, Ruth
View Public Comment Opposition - Fisco, Tia
View Public Comment Opposition - Draper, Steve
View Public Comment Opposition - Guinto, Michelle
View Public Comment Opposition - Huth, Dustin
View Public Comment Opposition - Johnson, Jillian
View Public Comment Opposition - Phillips, Leah
View Opposition - Riesling, Melissa
View Opposition - Metzger, Nolene
View Recorded BOCC Resolution SP241 RECORDED BOCC RESOLUTION 24-489


Review Documents (52)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and USPS Certification of Bulk Mailing ) 5/20/2024 10:28:58 AM
View Application/Petition Form 5/15/2024 12:42:19 PM
View Legal Description (MS WORD Version required) 5/13/2024 9:59:39 AM
View Letter of Intent 10/18/2024 8:23:25 AM
View Title Commitment (Current within 30 days of submittal) 5/15/2024 12:17:37 PM
View Clearance Letter - USF&W 5/6/2024 10:36:37 AM
View Colorado Geological Survey Receipt 5/15/2024 12:29:28 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 5/15/2024 12:42:20 PM
View Mineral Rights Certification 5/6/2024 10:35:13 AM
View MS4 Post Construction Form 5/20/2024 10:27:06 AM
View Neighborhood Meeting Summary 5/15/2024 12:42:21 PM
View PBMP Applicability Form 8/9/2024 9:14:43 AM
View Roundabout Analysis 8/9/2024 9:12:20 AM
View Landscape Plan drawings 8/28/2024 11:33:13 AM
View Preliminary Plan Drawings 1/15/2025 6:56:29 PM
View Commitment letter from waste water service provider 8/9/2024 8:58:48 AM
View Commitment letter from water service provider 10/18/2024 8:58:20 AM
View Electric Provider Commitment Letter 5/6/2024 10:40:23 AM
View Natural Gas Commitment Letter 5/6/2024 10:40:23 AM
View Drainage Report - Preliminary 11/11/2024 10:09:41 AM
View Fire Protection Report 5/13/2024 9:58:27 AM
View Natural Landforms, Vegetation, Riparian Analysis 5/15/2024 12:33:29 PM
View Noxious Weed Management Plan 5/15/2024 12:33:28 PM
View Soils & Geology Report 8/8/2024 6:50:04 AM
View Subdivision Summary Sheet 5/17/2024 1:49:21 PM
View Traffic Impact Study 11/11/2024 9:57:54 AM
View Wastewater Disposal Report 5/13/2024 9:58:28 AM
View Wildland Fire & Hazard Mitigation Plan 5/17/2024 1:49:22 PM
View Water Resources Report 5/13/2024 9:58:28 AM
View Water Supply Information Summary 5/13/2024 9:58:29 AM
View Deviation 1 -- access spacing along Misty Acres 11/11/2024 1:56:44 PM
View Deviation 2 -- Urban Collector standards 11/11/2024 1:56:42 PM
View Deviation 3 -- County Line Road 11/11/2024 1:56:43 PM
View FDR RESPONSE 10/8/2024 7:55:38 AM
View Fire Protection Report Responses 8/9/2024 9:30:29 AM
View LSC Responses to CDOT Comments (2024 June 11) 8/9/2024 9:02:25 AM
View LSC Responses to CDOT Comments Memorandum - Nov 2024 11/12/2024 2:24:53 PM
View LSC Responses to Deviation No 1 Redline Comments 10/5/2024 9:50:28 AM
View LSC Responses to Deviation No 2 Redline Comments 10/5/2024 9:50:29 AM
View LSC Responses to Deviation No 3 Redline Comments 10/5/2024 9:50:30 AM
View LSC Responses to TIS Redline Comments 8/9/2024 9:02:24 AM
View LSC Responses to TIS Redline Comments (Preliminary Plan) 10/5/2024 9:50:30 AM
View Memo w Responses to CDOT Comments and new analysis 9/30/2024 10:16:08 AM
View Monument Ridge East_Drainage Report 8/9/2024 9:11:46 AM
View MRE Drainage Report County Review #1_PRC Responses 2024.08.04 8/9/2024 9:11:44 AM
View Noise Study 11/12/2024 2:24:52 PM
View Preliminary Plan Responses 11/11/2024 1:56:44 PM
View Soils and Geo Response 8/8/2024 6:50:05 AM
View USFWS Effects Determination 5/6/2024 10:35:17 AM
View Wastewater Resources Report 10/18/2024 8:58:21 AM
View Water Resources Report 9/30/2024 10:16:06 AM
View Water Supply Information Summary 10/18/2024 8:58:22 AM



Events (249)

Date Comment
2/3/2025 11:48:19 AM Project Closed
2/3/2025 11:48:19 AM Project Approved: 2/3/2025
2/3/2025 11:47:40 AM Request for Review Comments returned by PCD Project Manager
1/17/2025 11:07:35 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/17/2025 10:10:52 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/17/2025 7:46:44 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
1/17/2025 7:46:43 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/17/2025 7:46:42 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
1/17/2025 7:46:39 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
1/17/2025 7:44:49 AM Submission Triaged
1/15/2025 6:56:42 PM Submission received from Applicant
1/7/2025 3:41:06 PM Submission request sent to Applicant
12/9/2024 1:59:33 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
12/9/2024 1:24:19 PM Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
12/6/2024 3:40:48 PM Request for Review Comments returned by Pikes Peak Regional Building Department
12/4/2024 8:09:50 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
12/3/2024 3:07:43 PM Request for Review Comments returned by PCD Project Manager
12/3/2024 3:05:49 PM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
12/3/2024 2:47:48 PM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
12/3/2024 2:47:46 PM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
12/3/2024 11:59:27 AM Request for Review Comments returned by PCD Engineering Division
11/19/2024 8:30:44 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
11/19/2024 8:30:42 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
11/19/2024 8:30:40 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
11/14/2024 10:49:58 AM Request for Review Comments returned by County Attorney - Water
11/13/2024 1:09:37 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
11/13/2024 1:00:27 PM Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
11/13/2024 12:41:38 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
11/13/2024 11:37:54 AM Submission Triaged
11/13/2024 11:34:24 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
11/13/2024 11:34:22 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
11/13/2024 11:34:20 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
11/12/2024 2:28:54 PM Request for Review Comments returned by County Attorney - Development Review
11/12/2024 2:25:02 PM Submission received from Applicant
11/12/2024 2:13:23 PM Submission request sent to Applicant
11/12/2024 11:34:39 AM Submission request sent to Applicant
11/12/2024 11:34:14 AM Submission Triaged
11/11/2024 1:57:13 PM Submission received from Applicant
11/8/2024 2:03:30 PM Submission request sent to Applicant
11/8/2024 11:02:14 AM Fees paid: 11/8/2024 (Receipt: 1009817)
11/8/2024 10:48:31 AM Payment Request sent: 11/8/2024
11/7/2024 12:44:17 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
11/4/2024 3:57:51 PM Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
11/4/2024 3:55:54 PM Submission request sent to Applicant
11/4/2024 3:54:56 PM Request for Review Comments returned by PCD Project Manager
11/4/2024 3:03:09 PM Request for Review Comments returned by PCD Engineering Division
11/4/2024 8:55:47 AM Request for Review Comments returned by Colorado Geological Survey
10/29/2024 8:38:44 AM Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
10/28/2024 5:48:11 PM Request for Review Comments returned by Colorado Division of Water Resources
10/28/2024 11:34:31 AM Request for Review Comments returned by Pikes Peak Regional Building Department
10/24/2024 11:35:52 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/21/2024 4:51:04 PM Request for Review Comments returned by County Attorney - Water
10/21/2024 10:03:36 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
10/21/2024 10:03:34 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
10/21/2024 10:03:32 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/21/2024 10:03:30 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
10/21/2024 10:03:28 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/21/2024 10:03:26 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
10/21/2024 10:03:24 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
10/21/2024 10:03:20 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
10/21/2024 10:03:18 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
10/21/2024 10:03:17 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/21/2024 10:03:15 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
10/21/2024 10:03:13 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
10/21/2024 10:03:11 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
10/21/2024 10:03:07 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
10/21/2024 10:03:05 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
10/21/2024 10:03:03 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
10/21/2024 9:55:56 AM Submission Triaged
10/18/2024 8:58:47 AM Submission received from Applicant
10/11/2024 5:13:50 PM Request for Review Comments returned by EPC Health Department
10/1/2024 12:28:24 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
9/24/2024 10:42:10 AM Submission request sent to Applicant
9/23/2024 9:43:39 AM Request for Review Comments returned by US Forest Service, Pikes Peak Ranger District
9/20/2024 8:04:21 AM Submission request sent to Applicant
9/20/2024 8:03:44 AM Request for Review Comments returned by PCD Project Manager
9/19/2024 4:49:05 PM Request for Review Comments returned by PCD Engineering Division
9/18/2024 3:26:19 PM Request for Review Comments returned by Colorado Geological Survey
9/17/2024 5:34:47 PM Request for Review Comments returned by EPC Stormwater Review
9/12/2024 7:15:49 PM Request for Review Comments returned by Colorado Division of Water Resources
9/10/2024 2:24:05 PM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
9/10/2024 11:48:53 AM Request for Review Comments returned by County Attorney - Development Review
9/10/2024 9:11:24 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/6/2024 11:42:39 AM Request for Review Comments returned by Pikes Peak Regional Building Department
9/4/2024 11:34:47 AM Request for Review Comments returned by County Attorney - Water
9/3/2024 12:01:33 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
8/30/2024 3:41:26 PM Request for Review Comments returned by Misty Acres Metro
8/29/2024 2:53:31 PM Request for Review Comments returned by EPC Environmental Services
8/29/2024 9:44:25 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
8/29/2024 9:44:24 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
8/29/2024 9:44:22 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
8/29/2024 9:44:20 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
8/29/2024 9:44:17 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Chester Sawyer on behalf of Misty Acres Metro
8/29/2024 9:44:16 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Bussa on behalf of Misty Acres Metro
8/29/2024 9:44:13 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Douglas County on behalf of Douglas County Planning
8/29/2024 9:44:11 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
8/29/2024 9:44:09 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
8/29/2024 9:44:08 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
8/29/2024 9:44:06 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
8/29/2024 9:44:04 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
8/29/2024 9:44:02 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/29/2024 9:44:00 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/29/2024 9:43:58 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
8/29/2024 9:43:55 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
8/29/2024 9:43:53 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
8/29/2024 9:43:52 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
8/29/2024 9:43:48 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
8/29/2024 9:43:46 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
8/29/2024 9:43:44 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
8/29/2024 9:43:42 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
8/29/2024 9:43:40 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Colorado Department of Public Health and Environment
8/29/2024 9:43:38 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
8/29/2024 9:43:36 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
8/29/2024 9:43:34 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
8/29/2024 9:43:32 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
8/29/2024 9:43:31 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
8/29/2024 9:43:29 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
8/29/2024 9:43:27 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
8/29/2024 9:43:25 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
8/29/2024 9:43:23 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
8/29/2024 9:43:21 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
8/29/2024 9:43:19 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
8/29/2024 9:43:17 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
8/29/2024 9:43:15 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
8/29/2024 9:43:13 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
8/29/2024 9:43:11 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
8/29/2024 9:43:09 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
8/29/2024 9:43:07 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
8/29/2024 9:43:05 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
8/29/2024 9:43:02 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/29/2024 9:43:00 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
8/29/2024 9:42:58 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
8/29/2024 9:30:02 AM Submission Triaged
8/29/2024 9:27:05 AM Submission received from Applicant
7/8/2024 11:27:09 AM Request for Review Comments returned by Monument
7/8/2024 11:25:08 AM Submission request sent to Applicant
7/8/2024 11:24:18 AM Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
7/8/2024 11:21:39 AM Submission request canceled
6/24/2024 3:29:09 PM Submission request sent to Applicant
6/18/2024 3:38:06 PM Request for Review Comments returned by Parks Advisory Board
6/18/2024 10:17:29 AM Submission request sent to Applicant
6/18/2024 10:16:56 AM Submission request sent to Applicant
6/18/2024 10:15:13 AM Request for Review Comments returned by PCD Project Manager
6/18/2024 10:13:38 AM Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
6/17/2024 11:58:07 AM Request for Review Comments returned by PCD Engineering Division
6/14/2024 1:53:21 PM Request for Review Comments returned by PCD Project Manager
6/14/2024 1:49:41 PM Request for Review Comments email resent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
6/14/2024 1:38:09 PM Request for Review Comments returned by PCD Project Manager
6/13/2024 3:51:11 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
6/13/2024 2:43:09 PM Request for Review Comments returned by Colorado Geological Survey
6/12/2024 11:45:24 AM Request for Review Comments returned by Colorado Parks and Wildlife
6/11/2024 11:37:15 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
6/11/2024 10:42:57 AM Request for Review Comments returned by Pikes Peak Regional Building Department
6/10/2024 2:06:58 PM Fees paid: 6/10/2024 (Receipt: 1009218)
6/10/2024 10:09:15 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/10/2024 10:03:55 AM Request for Review Comments returned by EPC Stormwater Review
6/10/2024 9:17:47 AM Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
6/7/2024 9:38:38 AM Request for Review Comments returned by EPC Environmental Services
6/6/2024 8:23:26 AM Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by Vicki Wood on behalf of Lewis Palmer 38
6/5/2024 12:49:41 PM Payment Request sent: 6/5/2024
6/5/2024 10:53:28 AM Request for Review Comments returned by Colorado State Forest Service
6/5/2024 10:18:59 AM Request for Review Comments returned by Colorado Division of Water Resources
6/4/2024 4:13:25 PM Request for Review Comments returned by PCD Administrative Notice
6/4/2024 10:46:58 AM Request for Review Comments returned by County Attorney - Water
6/4/2024 7:30:50 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
5/31/2024 2:57:38 PM Request for Review Comments returned by EPC Parks Department
5/24/2024 9:03:25 AM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
5/23/2024 4:53:50 PM Request for Review Comments returned by County Attorney - Development Review
5/23/2024 1:42:24 PM Request for Review Comments returned by RBD Floodplain
5/23/2024 11:30:12 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
5/23/2024 11:30:11 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
5/23/2024 11:30:09 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
5/23/2024 11:30:07 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
5/23/2024 11:30:05 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
5/23/2024 11:30:03 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
5/23/2024 11:30:01 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Monument
5/23/2024 11:29:59 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Chester Sawyer on behalf of Misty Acres Metro
5/23/2024 11:29:56 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Douglas County on behalf of Douglas County Planning
5/23/2024 11:29:54 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
5/23/2024 11:29:52 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
5/23/2024 11:29:50 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
5/23/2024 11:29:48 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
5/23/2024 11:29:46 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
5/23/2024 11:29:44 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
5/23/2024 11:29:43 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
5/23/2024 11:29:40 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
5/23/2024 11:29:39 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
5/23/2024 11:29:37 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
5/23/2024 11:29:35 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
5/23/2024 11:29:33 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
5/23/2024 11:29:31 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andy Schlosberg on behalf of Colorado State Forest Service
5/23/2024 11:29:28 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
5/23/2024 11:29:26 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
5/23/2024 11:29:25 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
5/23/2024 11:29:23 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
5/23/2024 11:29:21 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
5/23/2024 11:29:19 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
5/23/2024 11:29:17 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
5/23/2024 11:29:15 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
5/23/2024 11:29:13 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
5/23/2024 11:29:11 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
5/23/2024 11:29:09 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
5/23/2024 11:29:07 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of Parks Advisory Board
5/23/2024 11:29:05 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review
5/23/2024 11:29:03 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
5/23/2024 11:29:02 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review
5/23/2024 11:29:00 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review
5/23/2024 11:28:58 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
5/23/2024 11:28:56 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
5/23/2024 11:28:54 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
5/23/2024 11:28:52 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
5/23/2024 11:28:50 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Public Works, County Engineer
5/23/2024 11:28:48 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of EPC Parks Department
5/23/2024 11:28:46 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
5/23/2024 11:28:44 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
5/23/2024 11:28:42 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
5/23/2024 11:28:40 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
5/23/2024 11:28:38 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Mindy Schulz on behalf of EPC Code Enforcement
5/23/2024 11:28:36 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
5/23/2024 11:28:34 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
5/23/2024 11:28:32 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Water
5/23/2024 11:28:30 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
5/23/2024 11:28:28 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
5/23/2024 11:28:26 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
5/23/2024 11:28:25 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
5/23/2024 11:28:23 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
5/23/2024 11:28:21 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division
5/23/2024 11:28:19 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by on behalf of PCD Administrative Notice
5/23/2024 11:28:17 AM Request for Review Comments email sent for Project Monument Ridge East Preliminary Plan for review by Miranda Benson on behalf of PCD Administrative Notice
5/23/2024 11:23:41 AM Request for Review Comments sent for Project Monument Ridge East Preliminary Plan for review by on behalf of PCD Administrative Notice
5/23/2024 11:07:30 AM Fees paid: 5/23/2024 (Receipt: 1009171)
5/20/2024 3:03:17 PM Payment Request sent: 5/20/2024
5/20/2024 3:03:17 PM File # Assigned: SP241
5/20/2024 3:03:07 PM Submission Triaged
5/20/2024 1:54:28 PM Submission received from Applicant
5/20/2024 10:57:55 AM Submission request sent to Applicant
5/20/2024 10:57:11 AM Submission Triaged
5/20/2024 10:29:15 AM Submission received from Applicant
5/20/2024 7:38:23 AM Submission request sent to Applicant
5/20/2024 7:38:09 AM Submission Triaged
5/17/2024 2:26:18 PM Submission received from Applicant
10/23/2023 9:15:28 AM Submission request sent to Applicant
10/3/2023 11:39:08 AM Submission request sent to Applicant
10/3/2023 8:07:24 AM Submission request sent to Applicant
10/3/2023 8:04:34 AM Submission request canceled
10/2/2023 3:54:38 PM Submission request sent to Applicant
9/20/2023 10:44:42 AM Project Manager Assigned: Kylie Bagley
9/20/2023 10:44:42 AM EA Assigned: EA2388
9/20/2023 10:44:42 AM Project Created