5/6/2025 11:10:34 AM
|
Project Closed
|
5/6/2025 11:10:34 AM
|
Project Approved: 5/6/2025
|
12/18/2024 10:05:59 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/16/2024 9:48:44 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/13/2024 1:48:06 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/12/2024 12:03:10 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
12/12/2024 12:03:08 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
12/12/2024 12:03:03 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/12/2024 12:03:01 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
12/12/2024 11:13:26 AM
|
Submission Triaged
|
12/12/2024 8:49:10 AM
|
Submission received from Applicant
|
11/14/2024 4:04:31 PM
|
Submission request sent to Applicant
|
11/14/2024 4:04:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/14/2024 3:49:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/14/2024 10:20:55 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/13/2024 10:17:47 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/31/2024 12:22:08 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
10/31/2024 12:22:06 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
10/31/2024 12:22:04 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
10/31/2024 12:22:02 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
10/31/2024 12:21:59 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
10/31/2024 12:21:56 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/31/2024 12:21:52 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/31/2024 12:15:48 PM
|
Submission Triaged
|
10/31/2024 11:53:52 AM
|
Submission received from Applicant
|
10/23/2024 7:21:13 AM
|
Submission request sent to Applicant
|
10/23/2024 7:18:29 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/23/2024 7:07:28 AM
|
Request for Review Comments email resent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/22/2024 5:15:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/22/2024 5:12:33 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/22/2024 2:44:39 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/21/2024 1:59:23 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/15/2024 2:43:24 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/11/2024 4:02:37 PM
|
Request for Review Comments returned by EPC Health Department
|
10/11/2024 8:47:35 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/8/2024 3:03:47 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
10/8/2024 3:03:45 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
10/8/2024 3:03:43 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
10/8/2024 3:03:41 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
10/8/2024 3:03:39 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/8/2024 3:03:37 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
10/8/2024 3:03:35 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
10/8/2024 3:03:33 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
10/8/2024 3:03:31 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
10/8/2024 3:03:27 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/8/2024 3:03:23 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/8/2024 2:57:42 PM
|
Submission Triaged
|
10/8/2024 2:56:01 PM
|
Submission received from Applicant
|
10/7/2024 11:09:20 AM
|
Submission request sent to Applicant
|
10/7/2024 11:08:53 AM
|
Submission Triaged
|
10/7/2024 11:08:05 AM
|
Submission Triaged
|
10/7/2024 11:05:44 AM
|
Submission request canceled
|
10/7/2024 11:02:07 AM
|
Submission request sent to Applicant
|
10/7/2024 9:16:22 AM
|
Submission Triaged
|
10/3/2024 5:45:34 PM
|
Submission received from Applicant
|
9/26/2024 7:00:04 AM
|
Submission request sent to Applicant
|
9/25/2024 10:14:58 AM
|
Submission request sent to Applicant
|
9/24/2024 10:40:10 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
9/20/2024 9:56:55 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
9/18/2024 5:29:30 PM
|
Submission request sent to Applicant
|
9/18/2024 5:28:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/18/2024 5:26:58 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/18/2024 8:48:25 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/17/2024 8:31:54 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/16/2024 1:35:24 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/12/2024 1:41:37 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/12/2024 8:34:33 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/11/2024 11:41:51 AM
|
Request for Review Comments returned by PCD Administrative
|
9/10/2024 11:54:08 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/5/2024 9:47:24 AM
|
Request for Review Comments returned by Road Impact Fee Administrator
|
9/4/2024 11:29:40 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
9/4/2024 6:53:57 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
9/3/2024 12:05:02 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
9/3/2024 9:55:15 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/29/2024 2:06:47 PM
|
Request for Review Comments returned by EPC Environmental Services
|
8/29/2024 11:41:10 AM
|
Request for Review Comments returned by Parks Advisory Board
|
8/29/2024 11:33:14 AM
|
Request for Review Comments returned by EPC Parks Department
|
8/29/2024 8:53:37 AM
|
Request for Review Comments returned by RBD Floodplain
|
8/29/2024 8:45:42 AM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
8/29/2024 8:44:23 AM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
8/29/2024 8:25:19 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/28/2024 4:45:46 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
8/28/2024 3:43:50 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/28/2024 3:43:48 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/28/2024 3:43:46 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
8/28/2024 1:42:05 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Tracey Garcia on behalf of PCD Administrative
|
8/28/2024 1:42:03 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Admin on behalf of PCD Administrative
|
8/28/2024 1:42:01 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Elena Krebs on behalf of PCD Administrative
|
8/28/2024 1:37:31 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/28/2024 1:12:08 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Black Forest Fire Protection District
|
8/28/2024 1:12:06 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
8/28/2024 1:12:04 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
8/28/2024 1:12:02 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
8/28/2024 1:12:00 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
8/28/2024 1:11:58 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
8/28/2024 1:11:56 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/28/2024 1:11:54 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
8/28/2024 1:11:52 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
8/28/2024 1:11:50 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
8/28/2024 1:11:48 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
8/28/2024 1:11:46 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
8/28/2024 1:11:44 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
8/28/2024 1:11:42 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
8/28/2024 1:11:40 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/28/2024 1:11:38 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
8/28/2024 1:11:36 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/28/2024 1:11:34 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
8/28/2024 1:11:32 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
8/28/2024 1:11:30 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
8/28/2024 1:11:28 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
8/28/2024 1:11:26 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
8/28/2024 1:11:24 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of Parks Advisory Board
|
8/28/2024 1:11:22 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
8/28/2024 1:11:20 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
8/28/2024 1:11:18 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
8/28/2024 1:11:16 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by on behalf of EPC Parks Department
|
8/28/2024 1:11:14 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
8/28/2024 1:11:12 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
8/28/2024 1:11:10 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
8/28/2024 1:11:08 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/28/2024 1:11:05 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Mindy Schulz on behalf of EPC Code Enforcement
|
8/28/2024 1:11:03 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
8/28/2024 1:11:01 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
8/28/2024 1:10:59 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
8/28/2024 1:10:57 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
8/28/2024 1:10:56 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
8/28/2024 1:10:54 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
8/28/2024 1:10:52 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
8/28/2024 1:10:48 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/28/2024 1:10:46 PM
|
Request for Review Comments email sent for Project Vollmer Rd Stimple Family Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
8/28/2024 11:45:14 AM
|
Fees paid: 8/28/2024 (Receipt: 1009525)
|
8/26/2024 7:34:17 AM
|
Project Manager Assigned: Joe Letke
|
8/26/2024 7:18:54 AM
|
Payment Request sent: 8/26/2024
|
8/26/2024 7:18:54 AM
|
File # Assigned: MS244
|
8/26/2024 7:18:45 AM
|
Submission Triaged
|
8/23/2024 10:57:22 AM
|
Submission received from Applicant
|
8/1/2024 2:17:49 PM
|
Submission request sent to Applicant
|
9/7/2023 4:14:29 PM
|
Submission request sent to Applicant
|
7/27/2023 8:28:54 AM
|
Submission request sent to Applicant
|
7/26/2023 9:29:56 AM
|
Project Manager Assigned: Ashlyn Mathy
|
7/26/2023 9:29:56 AM
|
Project Created
|