| 3/28/2024 2:41:15 PM | Fees paid: 3/28/2024 (Receipt: 1008940) | 
                
                    | 3/21/2024 8:46:42 AM | Payment Request sent: 3/21/2024 | 
                
                    | 2/22/2024 12:55:29 PM | Project Closed | 
                
                    | 2/22/2024 12:55:29 PM | Project Approved: 2/22/2024 | 
                
                    | 1/25/2024 1:25:13 PM | Project reopened for Approval requests | 
                
                    | 1/25/2024 1:25:03 PM | Project Closed | 
                
                    | 1/25/2024 1:25:03 PM | Project Approved: 1/25/2024 | 
                
                    | 1/25/2024 1:24:26 PM | Project Ready for Approval requests.  Review Comment period is complete. | 
                
                    | 1/22/2024 12:02:37 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 1/22/2024 7:43:04 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 1/22/2024 7:43:02 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 1/18/2024 9:52:06 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/18/2024 8:52:06 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/17/2024 12:13:14 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 1/17/2024 11:39:00 AM | Request for Review Comments returned by Falcon School District 49 | 
                
                    | 1/17/2024 8:07:45 AM | Request for Review Comments email resent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 1/17/2024 7:09:41 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 1/17/2024 7:09:39 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 1/16/2024 3:58:00 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 1/16/2024 1:39:21 PM | Request for Review Comments returned by Colorado Springs Airport Advisory Commission | 
                
                    | 1/16/2024 1:27:46 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 1/16/2024 1:03:21 PM | Request for Review Comments returned by Colorado Springs Airport Advisory Commission | 
                
                    | 1/16/2024 7:20:15 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/16/2024 7:20:13 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/16/2024 7:18:54 AM | Submission Triaged | 
                
                    | 1/12/2024 2:30:25 PM | Submission received from Applicant | 
                
                    | 1/11/2024 9:41:50 AM | Request for Review Comments returned by EPC Health Department | 
                
                    | 1/10/2024 3:45:12 PM | Submission request sent to Applicant | 
                
                    | 1/10/2024 3:04:09 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/10/2024 11:50:49 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/10/2024 11:41:34 AM | Submission request sent to Applicant | 
                
                    | 1/10/2024 11:41:12 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/9/2024 1:18:39 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 1/8/2024 4:48:59 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 1/8/2024 4:48:58 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 1/8/2024 4:48:53 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/8/2024 4:48:50 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/8/2024 4:46:28 PM | Submission Triaged | 
                
                    | 1/8/2024 4:12:38 PM | Submission received from Applicant | 
                
                    | 1/8/2024 10:44:24 AM | Submission request sent to Applicant | 
                
                    | 1/8/2024 10:00:25 AM | Submission request sent to Applicant | 
                
                    | 1/8/2024 9:52:16 AM | Request for Review Comments email resent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 1/8/2024 9:47:47 AM | Submission request sent to Applicant | 
                
                    | 1/5/2024 9:24:57 AM | Request for Review Comments email resent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 12/20/2023 9:10:05 AM | Submission request sent to Applicant | 
                
                    | 12/20/2023 9:09:38 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 12/20/2023 8:54:02 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 12/18/2023 4:54:30 PM | Submission request sent to Applicant | 
                
                    | 12/15/2023 9:34:52 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 12/14/2023 8:12:01 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 12/12/2023 4:20:22 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 12/12/2023 8:07:33 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 12/12/2023 8:07:31 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/11/2023 1:10:36 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 12/11/2023 1:10:07 PM | Request for Review Comments email resent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/11/2023 12:35:31 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 12/11/2023 7:30:33 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 12/11/2023 7:30:31 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/7/2023 3:03:05 PM | Submission request sent to Applicant | 
                
                    | 12/7/2023 3:01:57 PM | Submission request sent to Applicant | 
                
                    | 12/7/2023 2:32:53 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 12/7/2023 1:39:01 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 12/5/2023 8:15:50 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 12/5/2023 8:15:46 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 12/5/2023 8:15:44 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/5/2023 7:28:14 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Evelyn galanephillips on behalf of Falcon School District 49 | 
                
                    | 12/5/2023 7:28:12 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 12/5/2023 7:28:10 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 12/5/2023 7:28:08 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 12/5/2023 7:28:06 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 12/5/2023 7:28:04 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 12/5/2023 7:28:02 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 12/5/2023 7:28:00 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 12/5/2023 7:27:58 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 12/5/2023 7:27:56 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 12/5/2023 7:27:51 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Lupe Packman on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:49 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:47 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:45 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Edward Schoenheit on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:43 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:41 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Charlene Durham on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:27:40 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division | 
                
                    | 12/5/2023 7:23:14 AM | Submission Triaged | 
                
                    | 12/4/2023 6:33:23 PM | Submission received from Applicant | 
                
                    | 11/28/2023 4:33:28 PM | Submission request sent to Applicant | 
                
                    | 10/17/2023 2:48:44 PM | Request for Review Comments returned by Black Forest Land Use Committee | 
                
                    | 10/5/2023 9:18:40 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 10/2/2023 4:29:54 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/2/2023 3:49:08 PM | Submission request sent to Applicant | 
                
                    | 10/2/2023 3:46:57 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/28/2023 9:34:32 AM | Request for Review Comments returned by Colorado Springs Public Works | 
                
                    | 9/27/2023 10:37:59 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 9/26/2023 10:58:00 AM | Request for Review Comments returned by El Paso County Conservation Dist | 
                
                    | 9/25/2023 12:29:25 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/21/2023 8:33:03 AM | Request for Review Comments returned by Colorado Springs Airport Advisory Commission | 
                
                    | 9/20/2023 10:30:13 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 9/15/2023 1:08:20 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 9/14/2023 11:37:25 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 9/14/2023 11:32:44 AM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 9/13/2023 11:08:21 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 9/12/2023 9:43:46 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 9/12/2023 7:39:20 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 9/11/2023 10:50:53 AM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 9/6/2023 3:22:10 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 9/6/2023 7:36:38 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 9/2/2023 12:06:54 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 9/2/2023 8:24:57 AM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 9/1/2023 3:46:38 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 8/31/2023 2:24:59 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 8/31/2023 2:12:30 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3 | 
                
                    | 8/31/2023 2:12:29 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 8/31/2023 2:12:28 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Elizabeth Dukes on behalf of Falcon School District 49 | 
                
                    | 8/31/2023 2:12:27 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 8/31/2023 2:12:26 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 8/31/2023 2:12:25 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works | 
                
                    | 8/31/2023 2:12:24 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Senior Planner Chris Padilla on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 8/31/2023 2:12:23 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 8/31/2023 2:12:22 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 8/31/2023 2:12:21 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 8/31/2023 2:12:20 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by 6/2023 updated email Black Forest Fire  Chief on behalf of Black Forest Fire Protection District | 
                
                    | 8/31/2023 2:12:19 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 8/31/2023 2:12:18 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 8/31/2023 2:12:17 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 8/31/2023 2:12:16 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 8/31/2023 2:12:15 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 8/31/2023 2:12:14 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 8/31/2023 2:12:13 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 8/31/2023 2:12:05 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 8/31/2023 2:12:04 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 8/31/2023 2:12:02 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 8/31/2023 2:11:59 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Bill Elder on behalf of EPC Sheriff's Department | 
                
                    | 8/31/2023 2:11:58 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Bill Elder on behalf of EPC Sheriff's Department | 
                
                    | 8/31/2023 2:11:57 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 8/31/2023 2:11:56 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 8/31/2023 2:11:53 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 8/31/2023 2:11:52 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 8/31/2023 2:11:50 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/31/2023 2:11:49 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/31/2023 2:11:48 PM | Request for Review Comments email sent for Project Sterling Ranch Fil No. 5 PUD Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/31/2023 12:01:22 PM | Fees paid: 8/31/2023 (Receipt: 1008268) | 
                
                    | 8/29/2023 7:28:16 AM | Submission Triaged | 
                
                    | 8/28/2023 3:01:56 PM | Submission received from Applicant | 
                
                    | 8/28/2023 7:06:30 AM | Submission request sent to Applicant | 
                
                    | 8/28/2023 7:05:52 AM | Payment Request sent: 8/28/2023 | 
                
                    | 8/28/2023 7:05:52 AM | File # Assigned: PUDSP232 | 
                
                    | 8/28/2023 7:05:48 AM | Submission Triaged | 
                
                    | 8/25/2023 12:54:52 PM | Submission received from Applicant | 
                
                    | 7/10/2023 10:59:23 AM | Submission request sent to Applicant | 
                
                    | 6/12/2023 1:24:24 PM | Submission request sent to Applicant | 
                
                    | 6/12/2023 12:44:54 PM | Project Manager Assigned: Kari Parsons | 
                
                    | 6/12/2023 12:44:54 PM | Project Created |