8/22/2024 8:59:44 AM
|
Project Closed
|
8/22/2024 8:59:44 AM
|
Project Approved: 8/22/2024
|
8/22/2024 8:59:33 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
8/22/2024 8:56:47 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/22/2024 8:53:25 AM
|
Project reopened for Review Comments
|
8/22/2024 8:19:56 AM
|
Request for Review Comments email sent for Project Southern Colorado Rail Park Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
8/22/2024 8:19:54 AM
|
Request for Review Comments email sent for Project Southern Colorado Rail Park Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
8/22/2024 8:19:52 AM
|
Request for Review Comments email sent for Project Southern Colorado Rail Park Sketch Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
8/22/2024 8:19:50 AM
|
Request for Review Comments email sent for Project Southern Colorado Rail Park Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
6/5/2024 7:02:47 AM
|
Project Closed
|
6/5/2024 7:02:47 AM
|
Project Approved: 6/5/2024
|
5/15/2024 3:03:08 PM
|
Request for Review Comments returned by EPC Sheriff's Department
|
5/10/2024 3:21:20 PM
|
Request for Review Comments returned by Southwestern Hwy 115 Fire Protection District
|
5/10/2024 8:38:49 AM
|
Request for Review Comments returned by Fountain Ft. Carson SD 8
|
5/6/2024 1:53:48 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
5/6/2024 1:53:18 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
5/1/2024 3:32:17 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
4/29/2024 4:59:02 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/29/2024 4:58:02 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/29/2024 4:40:29 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/29/2024 8:08:39 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
4/29/2024 7:23:31 AM
|
Project reopened for Approval requests
|
4/29/2024 7:23:15 AM
|
Project Closed
|
4/29/2024 7:23:15 AM
|
Project Approved: 4/29/2024
|
4/26/2024 12:42:42 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/25/2024 5:06:25 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/24/2024 5:57:16 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/23/2024 4:04:45 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/15/2024 8:54:30 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/15/2024 3:01:20 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/12/2024 8:55:02 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/11/2024 3:43:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/11/2024 11:57:16 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
4/10/2024 3:13:25 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
4/10/2024 1:10:06 PM
|
Request for Review Comments returned by EPC Environmental Services
|
4/10/2024 11:11:39 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/10/2024 7:56:19 AM
|
Request for Review Comments returned by Assessor's Office
|
4/9/2024 4:05:48 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
4/8/2024 3:46:28 PM
|
Request for Review Comments returned by EPC Parks Department
|
4/8/2024 12:06:19 PM
|
Request for Review Comments returned by Hanover Fire Protection District
|
4/8/2024 9:26:59 AM
|
Request for Review Comments returned by RBD Floodplain
|
4/8/2024 8:43:27 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/8/2024 7:23:51 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Harold Noonan on behalf of U.S. Department of the Army/Fort Carson
|
4/8/2024 7:23:48 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Hart Wright on behalf of Southwestern Hwy 115 Fire Protection District
|
4/8/2024 7:23:46 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joan Armstrong on behalf of Pueblo County Planning
|
4/8/2024 7:23:44 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
|
4/8/2024 7:23:42 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Tyler Swanson on behalf of Public Service Company of Colorado dba X-cel Energy
|
4/8/2024 7:23:40 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
4/8/2024 7:23:38 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
|
4/8/2024 7:23:35 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
4/8/2024 7:23:33 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Steve White on behalf of Mountain Metro Transit (City of COS)
|
4/8/2024 7:23:31 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
4/8/2024 7:23:29 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Kyle Cooper on behalf of Hanover SD 28
|
4/8/2024 7:23:25 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Carl Tatum on behalf of Hanover Fire Protection District
|
4/8/2024 7:23:23 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by John Sanders on behalf of Ft. Carson, Directorate of Public Works, Master Planning
|
4/8/2024 7:23:21 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joel Stahn on behalf of Fountain Valley Power
|
4/8/2024 7:23:19 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by James Heckman on behalf of Fountain Sanitation District
|
4/8/2024 7:23:17 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Leslie Haren-Friesz on behalf of Fountain Ft. Carson SD 8
|
4/8/2024 7:23:14 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Michael Gates on behalf of Fountain Fire Department
|
4/8/2024 7:23:12 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Kristy Martinez on behalf of Fountain
|
4/8/2024 7:23:11 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Brandy Williams on behalf of Fountain
|
4/8/2024 7:23:09 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Ben Sheets on behalf of Fountain
|
4/8/2024 7:23:06 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by John Paget on behalf of El Paso County Fire Marshall
|
4/8/2024 7:23:04 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
|
4/8/2024 7:23:02 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
4/8/2024 7:23:00 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
4/8/2024 7:22:58 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Heather on behalf of City of Fountain Electric
|
4/8/2024 7:22:56 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
4/8/2024 7:22:54 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Terry Seaman on behalf of Cheyenne Mountain Air Force Station
|
4/8/2024 7:22:51 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Pamela Davidson on behalf of Central CO Conservation District
|
4/8/2024 7:22:49 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
4/8/2024 7:22:47 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
4/8/2024 7:22:45 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
4/8/2024 7:22:43 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of Pikes Peak Regional Building Department
|
4/8/2024 7:22:41 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/8/2024 7:22:39 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
4/8/2024 7:22:37 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/8/2024 7:22:35 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/8/2024 7:22:33 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
4/8/2024 7:22:31 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Justin Osborne on behalf of Colorado State Land Board
|
4/8/2024 7:22:29 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:27 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:25 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:23 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:21 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:19 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:17 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:16 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:14 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:10 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:22:08 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/8/2024 7:22:04 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
4/8/2024 7:22:02 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/8/2024 7:22:00 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Wally Erickson on behalf of Colorado Division of Mining Reclamation
|
4/8/2024 7:21:58 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
4/8/2024 7:21:56 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
4/8/2024 7:21:54 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
4/8/2024 7:21:52 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
4/8/2024 7:21:48 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of Colorado Department of Public Health and Environment
|
4/8/2024 7:21:46 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by John Hunyadi on behalf of Colorado Dam Safety Division
|
4/8/2024 7:21:44 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Brian McCormick PE on behalf of Colorado Dam Safety Division
|
4/8/2024 7:21:42 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Michael Diehl on behalf of Xcel Energy
|
4/8/2024 7:21:40 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of Parks Advisory Board
|
4/8/2024 7:21:38 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/8/2024 7:21:36 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/8/2024 7:21:34 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
4/8/2024 7:21:32 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
4/8/2024 7:21:30 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
4/8/2024 7:21:28 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
4/8/2024 7:21:26 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of EPC Public Works, County Engineer
|
4/8/2024 7:21:24 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of EPC Public Works, County Engineer
|
4/8/2024 7:21:22 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of EPC Parks Department
|
4/8/2024 7:21:20 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Mike McCarthy on behalf of EPC Health Department
|
4/8/2024 7:21:18 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
4/8/2024 7:21:16 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
4/8/2024 7:21:14 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Shanna Smith on behalf of EPC Finance
|
4/8/2024 7:21:12 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Nikki Simmons on behalf of EPC Finance
|
4/8/2024 7:21:10 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/8/2024 7:21:08 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
4/8/2024 7:21:06 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by April Willie on behalf of County Attorney - Development Review
|
4/8/2024 7:21:04 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Mark Flutcher on behalf of Assessor's Office
|
4/8/2024 7:21:02 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
4/8/2024 7:21:00 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/8/2024 7:20:56 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
4/8/2024 7:20:52 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of PCD Administrative Notice
|
4/8/2024 7:17:53 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/8/2024 7:17:51 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/8/2024 7:17:49 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:47 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Rae Carlson on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:46 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Patrick Morris on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:44 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:42 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:40 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joel Metzker on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:38 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:36 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:34 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Erin Powers on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:32 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by General Email on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:30 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Dana Davison on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:28 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Brian Shevock on behalf of Colorado Springs Public Works
|
4/8/2024 7:17:26 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
4/8/2024 7:17:23 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
|
4/8/2024 7:17:21 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:19 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:17 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:15 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:13 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:12 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:10 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:08 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:06 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:17:02 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
4/8/2024 7:16:59 AM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/8/2024 7:02:46 AM
|
Submission Triaged
|
4/4/2024 4:34:32 PM
|
Submission received from Applicant
|
3/21/2024 9:17:18 AM
|
Fees paid: 3/21/2024 (Receipt: 1008909)
|
3/21/2024 9:08:55 AM
|
Payment Request sent: 3/21/2024
|
11/16/2023 9:10:49 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
11/15/2023 12:25:11 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/14/2023 9:37:22 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
11/13/2023 10:37:17 AM
|
Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
|
11/6/2023 8:11:59 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
11/2/2023 11:33:20 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
10/30/2023 3:27:21 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
10/30/2023 3:06:10 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/30/2023 10:23:48 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
10/30/2023 9:50:51 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
10/30/2023 9:32:46 AM
|
Submission request sent to Applicant
|
10/30/2023 9:31:31 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/30/2023 9:26:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/27/2023 3:37:10 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/26/2023 1:24:40 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/25/2023 4:46:35 PM
|
Request for Review Comments email resent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/25/2023 3:50:03 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/25/2023 3:16:45 PM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/25/2023 11:48:41 AM
|
Submission Triaged
|
10/25/2023 11:43:50 AM
|
Submission received from Applicant
|
10/25/2023 11:08:56 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/25/2023 10:58:12 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/25/2023 10:15:01 AM
|
Submission request sent to Applicant
|
10/25/2023 7:45:23 AM
|
Request for Review Comments sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by on behalf of PCD Administrative Notice
|
10/18/2023 8:17:38 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/16/2023 1:53:22 PM
|
Fees paid: 10/16/2023 (Receipt: 1008435)
|
10/16/2023 1:48:56 PM
|
Payment Request sent: 10/16/2023
|
10/16/2023 6:52:50 AM
|
Request for Review Comments returned by Fountain Ft. Carson SD 8
|
10/13/2023 4:31:41 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
10/12/2023 4:03:23 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/12/2023 1:52:57 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/12/2023 9:42:05 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/11/2023 4:42:11 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/11/2023 4:41:04 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/10/2023 1:49:30 PM
|
Request for Review Comments email resent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
10/10/2023 1:02:41 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
10/10/2023 12:19:28 PM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Hart Wright on behalf of Southwestern Hwy 115 Fire Protection District
|
10/10/2023 12:19:26 PM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
10/10/2023 12:19:23 PM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
10/10/2023 12:19:21 PM
|
Request for Review Comments email sent for Project Southern Colorado Dual-Service Rail Park Sketch Plan for review by Pamela Davidson on behalf of Central CO Conservation District
|
10/9/2023 11:47:10 AM
|
Request for Review Comments returned by Assessor's Office
|
10/9/2023 11:35:39 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by on behalf of PCD Administrative Notice
|
10/9/2023 7:46:34 AM
|
Request for Review Comments returned by RBD Floodplain
|
10/9/2023 7:14:37 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Harold Noonan on behalf of U.S. Department of the Army/Fort Carson
|
10/9/2023 7:14:35 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Joan Armstrong on behalf of Pueblo County Planning
|
10/9/2023 7:14:33 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
|
10/9/2023 7:14:30 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
10/9/2023 7:14:27 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
|
10/9/2023 7:14:25 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by General Email on behalf of Mountain View Electric Association, Inc.
|
10/9/2023 7:14:23 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
10/9/2023 7:14:21 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Kyle Cooper on behalf of Hanover SD 28
|
10/9/2023 7:14:18 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Chief Carl Tatum on behalf of Hanover Fire Protection District
|
10/9/2023 7:14:16 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Thomas Wiersma on behalf of Ft. Carson, Directorate of Public Works, Master Planning
|
10/9/2023 7:14:14 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Joel Stahn on behalf of Fountain Valley Power
|
10/9/2023 7:14:12 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by James Heckman on behalf of Fountain Sanitation District
|
10/9/2023 7:14:09 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Leslie Haren-Friesz on behalf of Fountain Ft. Carson SD 8
|
10/9/2023 7:14:07 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Michael Gates on behalf of Fountain Fire Department
|
10/9/2023 7:14:05 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Kristy Martinez on behalf of Fountain
|
10/9/2023 7:14:03 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by John Paget on behalf of El Paso County Fire Marshall
|
10/9/2023 7:14:01 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
10/9/2023 7:13:58 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/9/2023 7:13:56 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
10/9/2023 7:13:54 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
10/9/2023 7:13:52 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Heather on behalf of City of Fountain Electric
|
10/9/2023 7:13:50 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Terry Seaman on behalf of Cheyenne Mountain Air Force Station
|
10/9/2023 7:13:48 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
|
10/9/2023 7:13:45 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Keith Curtis on behalf of RBD Floodplain
|
10/9/2023 7:13:43 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/9/2023 7:13:41 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/9/2023 7:13:39 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
10/9/2023 7:13:36 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
10/9/2023 7:13:34 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Justin Osborne on behalf of Colorado State Land Board
|
10/9/2023 7:13:32 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/9/2023 7:13:30 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/9/2023 7:13:28 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/9/2023 7:13:25 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Wally Erickson on behalf of Colorado Division of Mining Reclamation
|
10/9/2023 7:13:23 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
10/9/2023 7:13:20 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by on behalf of Colorado Department of Public Health and Environment
|
10/9/2023 7:13:18 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Brian McCormick PE on behalf of Colorado Dam Safety Division
|
10/9/2023 7:13:16 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Michael Diehl on behalf of Xcel Energy
|
10/9/2023 7:13:14 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by on behalf of Parks Advisory Board
|
10/9/2023 7:13:12 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/9/2023 7:13:03 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
10/9/2023 7:12:57 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by County Engineer on behalf of EPC Public Works, County Engineer
|
10/9/2023 7:12:55 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by County Engineer on behalf of EPC Public Works, County Engineer
|
10/9/2023 7:12:53 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by on behalf of EPC Parks Department
|
10/9/2023 7:12:50 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Catherine McGarvy on behalf of EPC Health Department
|
10/9/2023 7:12:44 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Shanna Smith on behalf of EPC Finance
|
10/9/2023 7:12:40 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/9/2023 7:12:38 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Lori Seago on behalf of County Attorney - Development Review
|
10/9/2023 7:12:36 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Assessor Mark Flutcher on behalf of Assessor's Office
|
10/9/2023 7:12:33 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Kari Parsons on behalf of PCD Project Manager
|
10/9/2023 7:12:31 AM
|
Request for Review Comments email sent for Project Dual-Service Rail Park of Southern Colorado for review by Charlene Durham on behalf of PCD Engineering Division
|
10/4/2023 4:08:57 PM
|
Fees paid: 10/4/2023 (Receipt: 1008381)
|
10/4/2023 12:40:46 PM
|
Payment Request sent: 10/4/2023
|
10/4/2023 12:40:46 PM
|
File # Assigned: SKP234
|
10/4/2023 12:40:36 PM
|
Submission Triaged
|
10/3/2023 4:29:14 PM
|
Submission received from Applicant
|
4/25/2023 10:59:43 AM
|
Submission request sent to Applicant
|
4/11/2023 2:43:25 PM
|
Project Manager Assigned: Kari Parsons
|
4/11/2023 2:43:25 PM
|
EA Assigned: EA2337
|
4/11/2023 2:43:25 PM
|
Project Created
|