6/11/2025 3:21:18 PM
|
Project Closed
|
6/11/2025 3:21:18 PM
|
Project Approved: 6/11/2025
|
4/21/2025 8:04:36 PM
|
Request for Review Comments returned by EPC Health Department
|
4/21/2025 9:16:00 AM
|
Request for Review Comments email resent for Project Mary Jane Ranch Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
4/18/2025 3:46:25 PM
|
Request for Review Comments returned by EPC Health Department
|
4/3/2025 2:00:28 PM
|
Fees paid: 4/3/2025 (Receipt: 1010380)
|
4/3/2025 1:00:42 PM
|
Payment Request sent: 4/3/2025
|
3/31/2025 10:08:07 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
3/20/2025 9:44:08 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/19/2025 7:36:09 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/18/2025 5:23:12 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
3/18/2025 5:23:11 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
3/18/2025 5:23:10 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
3/18/2025 5:07:47 PM
|
Submission Triaged
|
3/18/2025 5:06:39 PM
|
Submission received from Applicant
|
3/18/2025 3:29:36 PM
|
Submission request sent to Applicant
|
3/18/2025 3:09:31 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/13/2025 12:03:44 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/13/2025 12:03:43 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/13/2025 12:03:42 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/13/2025 12:03:41 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
3/13/2025 12:03:40 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/13/2025 12:03:39 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
3/13/2025 12:03:38 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
3/12/2025 3:44:15 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
3/12/2025 3:44:13 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
3/12/2025 3:44:12 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
3/12/2025 3:41:17 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
3/12/2025 3:41:16 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
3/12/2025 3:41:15 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
3/12/2025 3:41:14 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
3/12/2025 3:39:03 PM
|
Submission Triaged
|
3/12/2025 3:36:29 PM
|
Submission received from Applicant
|
2/18/2025 11:35:53 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/18/2025 10:55:25 AM
|
Submission request sent to Applicant
|
2/18/2025 10:40:46 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/13/2025 2:23:58 PM
|
Submission request sent to Applicant
|
2/13/2025 2:23:18 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/12/2025 5:04:57 PM
|
Request for Review Comments email resent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
2/12/2025 4:28:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
2/12/2025 4:05:12 PM
|
Request for Review Comments email resent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
2/12/2025 8:51:23 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
2/12/2025 8:49:54 AM
|
Submission Triaged
|
2/12/2025 7:50:13 AM
|
Submission received from Applicant
|
2/12/2025 7:37:21 AM
|
Submission request sent to Applicant
|
2/12/2025 7:36:20 AM
|
Submission Triaged
|
2/11/2025 6:03:05 PM
|
Submission received from Applicant
|
2/4/2025 2:43:22 PM
|
Submission request sent to Applicant
|
2/4/2025 12:09:40 PM
|
Submission request sent to Applicant
|
2/4/2025 12:08:41 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/30/2025 9:06:57 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
1/30/2025 9:06:56 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
1/30/2025 9:06:55 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
1/30/2025 9:06:54 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
1/30/2025 9:05:54 AM
|
Submission Triaged
|
1/29/2025 6:30:41 PM
|
Submission received from Applicant
|
12/9/2024 4:33:44 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/9/2024 11:05:58 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
12/9/2024 11:05:56 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
12/9/2024 11:05:55 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
12/8/2024 8:46:19 AM
|
Request for Review Comments returned by EPC Health Department
|
11/25/2024 1:21:58 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/21/2024 8:37:53 AM
|
Submission request sent to Applicant
|
11/21/2024 8:37:05 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/20/2024 4:47:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/18/2024 8:27:31 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/12/2024 4:13:59 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
11/12/2024 4:13:57 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/12/2024 4:13:52 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
11/12/2024 4:13:48 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
11/12/2024 4:13:46 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
11/12/2024 4:13:42 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
11/12/2024 4:13:40 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
11/12/2024 4:13:38 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
11/12/2024 4:13:36 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
11/12/2024 4:13:32 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/12/2024 4:13:28 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
11/12/2024 4:10:59 PM
|
Submission Triaged
|
11/12/2024 9:01:16 AM
|
Submission received from Applicant
|
10/14/2024 12:42:20 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
10/12/2024 3:14:07 PM
|
Request for Review Comments returned by EPC Health Department
|
10/8/2024 3:48:50 PM
|
Submission request sent to Applicant
|
10/8/2024 3:45:18 PM
|
Submission Triaged
|
10/8/2024 9:29:07 AM
|
Submission received from Applicant
|
9/26/2024 1:50:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/26/2024 1:40:38 PM
|
Request for Review Comments email resent for Project Mary Jane Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/26/2024 1:27:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/25/2024 12:14:10 PM
|
Submission request sent to Applicant
|
9/25/2024 11:38:31 AM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
9/25/2024 7:04:26 AM
|
Request for Review Comments email resent for Project Mary Jane Ranch Minor Subdivision for review by Michael Henley on behalf of Ellicott Fire Protection District
|
9/23/2024 4:03:45 PM
|
Submission request sent to Applicant
|
9/23/2024 4:02:58 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/23/2024 3:53:48 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/23/2024 3:53:45 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
9/20/2024 10:05:21 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/10/2024 11:36:02 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/9/2024 10:51:31 AM
|
Request for Review Comments returned by Road Impact Fee Administrator
|
9/9/2024 10:23:43 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Chris Smith on behalf of Ellicott SD 22
|
9/9/2024 10:23:41 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Peggy Current on behalf of Ellicott Metro
|
9/9/2024 10:23:39 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
9/9/2024 10:23:37 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
9/9/2024 10:23:35 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/9/2024 10:01:16 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
9/9/2024 10:01:14 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/9/2024 10:01:12 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
9/9/2024 10:01:10 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
9/9/2024 10:01:08 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
9/9/2024 10:01:06 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
9/9/2024 10:01:04 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
9/9/2024 10:01:02 AM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
9/9/2024 9:59:38 AM
|
Submission Triaged
|
9/9/2024 9:56:01 AM
|
Submission received from Applicant
|
9/9/2024 9:39:38 AM
|
Submission request sent to Applicant
|
9/9/2024 9:34:05 AM
|
Submission Triaged
|
9/9/2024 9:29:15 AM
|
Submission received from Applicant
|
7/17/2024 1:00:04 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
7/2/2024 8:11:53 AM
|
Submission request sent to Applicant
|
7/1/2024 7:28:08 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/1/2024 5:04:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/27/2024 3:06:21 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/27/2024 12:54:56 PM
|
Request for Review Comments returned by County Attorney - Water
|
6/27/2024 12:38:43 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
6/27/2024 12:38:41 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/27/2024 12:38:39 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
6/27/2024 12:38:37 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
6/27/2024 12:38:35 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
6/21/2024 1:20:58 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/19/2024 4:44:24 PM
|
Request for Review Comments returned by County Attorney - Water
|
6/18/2024 2:09:29 PM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
6/17/2024 3:34:52 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/17/2024 3:34:49 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
6/17/2024 3:16:46 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
6/17/2024 3:16:44 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Michael Henley on behalf of Ellicott Fire Protection District
|
6/17/2024 3:16:42 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/17/2024 3:16:40 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
6/17/2024 3:16:38 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
6/17/2024 3:16:36 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
6/17/2024 3:16:34 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
6/17/2024 3:16:32 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
6/17/2024 3:16:31 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
6/17/2024 3:16:29 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
6/17/2024 3:16:25 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/17/2024 3:16:21 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
6/17/2024 3:12:38 PM
|
Submission Triaged
|
6/17/2024 1:50:19 PM
|
Submission received from Applicant
|
5/24/2024 3:38:54 PM
|
Request for Review Comments returned by EPC Health Department
|
5/15/2024 2:17:15 PM
|
Request for Review Comments returned by EPC Sheriff's Department
|
4/24/2024 1:21:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/18/2024 1:22:28 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/18/2024 11:16:40 AM
|
Submission request sent to Applicant
|
4/18/2024 11:14:11 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/17/2024 4:22:21 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/11/2024 2:12:59 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
4/9/2024 2:47:31 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/4/2024 10:16:50 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/4/2024 8:43:47 AM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
4/3/2024 2:35:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/3/2024 8:21:50 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/2/2024 2:52:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/1/2024 11:48:59 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/1/2024 11:46:54 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/29/2024 11:38:15 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/28/2024 2:47:16 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Chris Smith on behalf of Ellicott SD 22
|
3/28/2024 2:47:14 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Peggy Current on behalf of Ellicott Metro
|
3/28/2024 2:47:12 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mark Stanwood on behalf of Ellicott Fire Protection District
|
3/28/2024 2:47:10 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Michael Henley on behalf of Ellicott Fire Protection District
|
3/28/2024 2:47:08 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
3/28/2024 2:47:06 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
3/28/2024 2:47:04 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/28/2024 2:47:02 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/28/2024 2:47:00 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/28/2024 2:46:58 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/28/2024 2:46:56 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/28/2024 2:46:54 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
3/28/2024 2:46:52 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Jennifer Irvine on behalf of Road Impact Fee Administrator
|
3/28/2024 2:46:50 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by on behalf of Parks Advisory Board
|
3/28/2024 2:46:48 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/28/2024 2:46:46 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/28/2024 2:46:44 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
3/28/2024 2:46:42 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
3/28/2024 2:46:40 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
3/28/2024 2:46:38 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
3/28/2024 2:46:36 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by on behalf of EPC Parks Department
|
3/28/2024 2:46:34 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
3/28/2024 2:46:32 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
3/28/2024 2:46:30 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
3/28/2024 2:46:28 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/28/2024 2:46:26 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
3/28/2024 2:46:24 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
3/28/2024 2:46:22 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
3/28/2024 2:46:20 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
3/28/2024 2:46:17 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
3/28/2024 2:46:13 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/28/2024 2:46:12 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
3/28/2024 2:46:09 PM
|
Request for Review Comments email sent for Project Mary Jane Ranch Minor Subdivision for review by on behalf of PCD Administrative Notice
|
3/28/2024 2:28:33 PM
|
Fees paid: 3/28/2024 (Receipt: 1008939)
|
3/13/2024 8:37:18 AM
|
Project Manager Assigned: Joe Letke
|
3/12/2024 2:24:06 PM
|
Payment Request sent: 3/12/2024
|
3/12/2024 2:24:06 PM
|
File # Assigned: MS242
|
3/12/2024 2:23:57 PM
|
Submission Triaged
|
3/12/2024 10:14:19 AM
|
Submission received from Applicant
|
3/16/2023 4:44:33 PM
|
Submission request sent to Applicant
|
3/10/2023 1:16:41 PM
|
EA Assigned: EA2311
|
3/10/2023 1:16:41 PM
|
Project Created
|