| 5/20/2024 1:07:35 PM | Project Closed | 
                
                    | 5/20/2024 1:07:35 PM | Project Approved: 5/20/2024 | 
                
                    | 5/17/2024 10:32:13 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 5/17/2024 10:32:11 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 5/17/2024 10:31:27 AM | Submission Triaged | 
                
                    | 5/16/2024 6:04:40 PM | Submission received from Applicant | 
                
                    | 5/14/2024 9:10:36 AM | Submission request sent to Applicant | 
                
                    | 5/6/2024 10:24:16 AM | Submission request sent to Applicant | 
                
                    | 5/2/2024 7:09:09 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/24/2024 2:14:21 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 4/24/2024 2:14:19 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 4/24/2024 2:13:17 PM | Submission Triaged | 
                
                    | 4/19/2024 12:13:16 PM | Submission received from Applicant | 
                
                    | 4/1/2024 11:22:35 AM | Submission request sent to Applicant | 
                
                    | 3/25/2024 8:07:28 AM | Request for Review Comments returned by Colorado Springs Public Works | 
                
                    | 3/20/2024 12:20:55 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/20/2024 11:50:26 AM | Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 3/19/2024 8:46:41 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/11/2024 1:29:40 PM | Request for Review Comments sent for Project CDR HWY.105/JCP for review by LaShunda Simpson on behalf of Colorado Springs Public Works | 
                
                    | 3/8/2024 9:10:18 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 3/8/2024 9:10:15 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 3/8/2024 9:09:11 AM | Submission Triaged | 
                
                    | 3/4/2024 8:58:03 AM | Submission received from Applicant | 
                
                    | 2/13/2024 10:41:38 AM | Submission request sent to Applicant | 
                
                    | 2/13/2024 9:10:16 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/26/2024 3:25:34 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/26/2024 3:25:33 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/26/2024 3:24:29 PM | Submission Triaged | 
                
                    | 1/25/2024 4:31:51 PM | Submission received from Applicant | 
                
                    | 1/25/2024 3:51:46 PM | Submission request sent to Applicant | 
                
                    | 12/12/2023 3:49:44 PM | Request for Review Comments returned by Woodmoor Water and Sanitation District | 
                
                    | 12/7/2023 9:10:18 AM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 11/15/2023 12:31:14 PM | Request for Review Comments returned by Lewis Palmer 38 | 
                
                    | 11/15/2023 10:41:00 AM | Submission request sent to Applicant | 
                
                    | 11/15/2023 10:22:07 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 11/15/2023 9:30:02 AM | Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 11/15/2023 9:27:40 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 11/14/2023 3:57:21 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 11/14/2023 1:25:10 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 11/13/2023 11:03:04 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 11/7/2023 9:08:30 AM | Project Manager Assigned: Kylie Bagley | 
                
                    | 11/7/2023 8:48:29 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District | 
                
                    | 11/7/2023 8:48:27 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District | 
                
                    | 11/7/2023 8:48:25 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 11/7/2023 8:48:22 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Theresa Rust on behalf of Monument | 
                
                    | 11/7/2023 8:48:20 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Steve Sheffield on behalf of Monument | 
                
                    | 11/7/2023 8:48:18 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument | 
                
                    | 11/7/2023 8:48:16 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by  on behalf of Monument | 
                
                    | 11/7/2023 8:48:14 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Luke Kerr on behalf of Monument | 
                
                    | 11/7/2023 8:48:12 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Jeffrey Liljegren on behalf of Monument | 
                
                    | 11/7/2023 8:48:10 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38 | 
                
                    | 11/7/2023 8:48:08 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Chris Coulter on behalf of Lewis Palmer 38 | 
                
                    | 11/7/2023 8:48:06 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 11/7/2023 8:48:04 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 11/7/2023 8:48:02 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 11/7/2023 8:47:59 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 11/7/2023 8:47:57 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 11/7/2023 8:47:55 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 11/7/2023 8:47:53 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 11/7/2023 8:47:51 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 11/7/2023 8:47:49 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 11/7/2023 8:47:45 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 11/7/2023 8:47:40 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 11/7/2023 8:47:38 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 11/7/2023 8:47:36 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 11/7/2023 8:47:34 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 11/7/2023 8:47:32 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 11/7/2023 8:47:30 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lupe Packman on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:28 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:26 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:24 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Edward Schoenheit on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:22 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:20 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Charlene Durham on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:47:18 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division | 
                
                    | 11/7/2023 8:45:46 AM | Submission Triaged | 
                
                    | 11/6/2023 9:51:49 AM | Submission received from Applicant | 
                
                    | 8/28/2023 12:06:40 PM | Request for Review Comments returned by Woodmoor Water and Sanitation District | 
                
                    | 8/23/2023 12:33:56 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 8/22/2023 1:26:53 PM | Submission request sent to Applicant | 
                
                    | 8/22/2023 1:24:20 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/22/2023 1:07:22 PM | Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager | 
                
                    | 8/22/2023 8:42:37 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/15/2023 8:17:12 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/14/2023 4:31:53 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 8/7/2023 8:32:14 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 7/24/2023 9:10:02 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District | 
                
                    | 7/24/2023 9:10:00 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 7/24/2023 9:09:59 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument | 
                
                    | 7/24/2023 9:09:58 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38 | 
                
                    | 7/24/2023 9:09:57 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 7/24/2023 9:09:56 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 7/24/2023 9:09:55 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 7/24/2023 9:09:49 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 7/24/2023 9:09:48 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 7/24/2023 9:09:45 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 7/24/2023 9:09:44 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 7/24/2023 9:09:43 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager | 
                
                    | 7/24/2023 9:09:41 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 7/24/2023 7:25:38 AM | Submission Triaged | 
                
                    | 7/20/2023 5:01:49 PM | Submission received from Applicant | 
                
                    | 4/7/2023 12:39:05 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/6/2023 7:21:48 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/6/2023 7:19:55 AM | Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 4/5/2023 3:01:05 PM | Request for Review Comments returned by Woodmoor Water and Sanitation District | 
                
                    | 4/5/2023 12:26:19 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/5/2023 12:25:44 PM | Submission request sent to Applicant | 
                
                    | 4/5/2023 11:36:09 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/3/2023 5:25:12 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 3/29/2023 2:30:20 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager | 
                
                    | 3/29/2023 2:30:17 PM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 3/29/2023 1:16:54 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 3/8/2023 11:15:25 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District | 
                
                    | 3/8/2023 11:15:24 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 3/8/2023 11:15:22 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument | 
                
                    | 3/8/2023 11:15:21 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38 | 
                
                    | 3/8/2023 11:15:20 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 3/8/2023 11:15:19 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 3/8/2023 11:15:18 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 3/8/2023 11:15:16 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by CDOT Access Mgr Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 3/8/2023 11:15:10 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 3/8/2023 11:15:05 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 3/8/2023 11:15:04 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 3/8/2023 11:15:03 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager | 
                
                    | 3/8/2023 11:15:02 AM | Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 3/3/2023 3:04:12 PM | Fees paid: 3/3/2023 (Receipt: 1007554) | 
                
                    | 2/27/2023 5:24:29 PM | Payment Request sent: 2/27/2023 | 
                
                    | 2/27/2023 5:24:24 PM | File # Assigned: CDR237 | 
                
                    | 2/27/2023 5:23:31 PM | Submission Triaged | 
                
                    | 2/27/2023 3:12:50 PM | Submission received from Applicant | 
                
                    | 2/23/2023 2:35:13 PM | Submission request sent to Applicant | 
                
                    | 2/23/2023 2:27:03 PM | Project Manager Assigned: Lekishia Bellamy | 
                
                    | 2/23/2023 2:27:03 PM | Project Created |