Project Details

Search


File Number
CDR237
Project Name
CDR HWY.105/JCP
Applicant
Classic Consulting Engineers & Surveyors, LLC
Marc Whorton ( MWhorton@classicconsulting.net ) Marc Whorton ( MWhorton@classicconsulting.net )
File Prefix
CDR - Construction Drawing Review
Year
2023
Project Manager
Kylie Bagley
Status
Closed
Created
2/23/2023 2:26:53 PM

View: Review Comments


Approved Documents (4)

Link Document
View Financial Assurance Forms
View MS4 Post Construction Form
View Construction Drawings (Plans/Profiles)
View Drainage Report - Final


Review Documents (28)

Link Document Date
View Letter of Intent 4/5/2023 12:24:17 PM
View Additional Exhibits 2/27/2023 1:00:37 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 2/27/2023 2:35:41 PM
View Financial Assurance Forms 4/19/2024 12:11:53 PM
View License Agreement (MS Word version including attachments) 5/16/2024 6:04:17 PM
View MS4 Post Construction Form 2/27/2023 2:35:42 PM
View PBMP Applicability Form 2/24/2023 5:02:34 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 2/27/2023 2:35:42 PM
View Construction Drawings (Plans/Profiles) 5/16/2024 6:04:14 PM
View Grading & Erosion Control Plan 2/24/2023 11:14:57 AM
View Storm Water Management Plan (SWMP) 2/27/2023 12:59:38 PM
View Soils Report Pursuant to Appendix E of the ECM 2/24/2023 11:14:58 AM
View Wetlands Analysis Report 2/24/2023 11:14:58 AM
View Drainage Report - Final 1/25/2024 4:30:55 PM
View FEMA LOMR, CLOMR, LOMA 2/27/2023 12:59:39 PM
View Wetland Impact Letter 2/27/2023 12:59:38 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 2/27/2023 12:59:36 PM
View CD Responses 11/2/2023 9:38:27 AM
View Drainage Letter 2/27/2023 12:59:37 PM
View FAE Responses 11/2/2023 9:38:29 AM
View FDR Responses 11/6/2023 8:35:24 AM
View Imp. Agreement with Town 1/25/2024 4:30:56 PM
View MS4 Letter 11/6/2023 9:27:04 AM
View Proof of submittal of non-jurisdictional water impoundment structure form 2/27/2023 3:11:19 PM
View Revised CDs 4/19/2024 12:11:54 PM
View Revised FDR 3/4/2024 8:57:24 AM
View Revised LOI 7/20/2023 5:00:58 PM
View TIS 7/20/2023 5:01:00 PM



Events (132)

Date Comment
5/20/2024 1:07:35 PM Project Closed
5/20/2024 1:07:35 PM Project Approved: 5/20/2024
5/17/2024 10:32:13 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division
5/17/2024 10:32:11 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
5/17/2024 10:31:27 AM Submission Triaged
5/16/2024 6:04:40 PM Submission received from Applicant
5/14/2024 9:10:36 AM Submission request sent to Applicant
5/6/2024 10:24:16 AM Submission request sent to Applicant
5/2/2024 7:09:09 AM Request for Review Comments returned by PCD Engineering Division
4/24/2024 2:14:21 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division
4/24/2024 2:14:19 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
4/24/2024 2:13:17 PM Submission Triaged
4/19/2024 12:13:16 PM Submission received from Applicant
4/1/2024 11:22:35 AM Submission request sent to Applicant
3/25/2024 8:07:28 AM Request for Review Comments returned by Colorado Springs Public Works
3/20/2024 12:20:55 PM Request for Review Comments returned by PCD Engineering Division
3/20/2024 11:50:26 AM Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
3/19/2024 8:46:41 AM Request for Review Comments returned by PCD Engineering Division
3/11/2024 1:29:40 PM Request for Review Comments sent for Project CDR HWY.105/JCP for review by LaShunda Simpson on behalf of Colorado Springs Public Works
3/8/2024 9:10:18 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division
3/8/2024 9:10:15 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
3/8/2024 9:09:11 AM Submission Triaged
3/4/2024 8:58:03 AM Submission received from Applicant
2/13/2024 10:41:38 AM Submission request sent to Applicant
2/13/2024 9:10:16 AM Request for Review Comments returned by PCD Engineering Division
1/26/2024 3:25:34 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division
1/26/2024 3:25:33 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
1/26/2024 3:24:29 PM Submission Triaged
1/25/2024 4:31:51 PM Submission received from Applicant
1/25/2024 3:51:46 PM Submission request sent to Applicant
12/12/2023 3:49:44 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
12/7/2023 9:10:18 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
11/15/2023 12:31:14 PM Request for Review Comments returned by Lewis Palmer 38
11/15/2023 10:41:00 AM Submission request sent to Applicant
11/15/2023 10:22:07 AM Request for Review Comments returned by PCD Engineering Division
11/15/2023 9:30:02 AM Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
11/15/2023 9:27:40 AM Request for Review Comments returned by PCD Project Manager
11/14/2023 3:57:21 PM Request for Review Comments returned by PCD Engineering Division
11/14/2023 1:25:10 PM Request for Review Comments returned by EPC Stormwater Review
11/13/2023 11:03:04 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/7/2023 9:08:30 AM Project Manager Assigned: Kylie Bagley
11/7/2023 8:48:29 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
11/7/2023 8:48:27 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
11/7/2023 8:48:25 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc.
11/7/2023 8:48:22 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Theresa Rust on behalf of Monument
11/7/2023 8:48:20 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Steve Sheffield on behalf of Monument
11/7/2023 8:48:18 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument
11/7/2023 8:48:16 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by on behalf of Monument
11/7/2023 8:48:14 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Luke Kerr on behalf of Monument
11/7/2023 8:48:12 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Jeffrey Liljegren on behalf of Monument
11/7/2023 8:48:10 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38
11/7/2023 8:48:08 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Chris Coulter on behalf of Lewis Palmer 38
11/7/2023 8:48:06 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
11/7/2023 8:48:04 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
11/7/2023 8:48:02 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Adam Magoon on behalf of Black Hills Energy-Aquila
11/7/2023 8:47:59 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/7/2023 8:47:57 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/7/2023 8:47:55 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/7/2023 8:47:53 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
11/7/2023 8:47:51 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
11/7/2023 8:47:49 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
11/7/2023 8:47:45 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
11/7/2023 8:47:40 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Mikayla Hartford on behalf of EPC Stormwater Review
11/7/2023 8:47:38 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Glenn Reese on behalf of EPC Stormwater Review
11/7/2023 8:47:36 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Christina Prete on behalf of EPC Stormwater Review
11/7/2023 8:47:34 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by on behalf of EPC Public Works, County Engineer
11/7/2023 8:47:32 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by on behalf of EPC Public Works, County Engineer
11/7/2023 8:47:30 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lupe Packman on behalf of PCD Engineering Division
11/7/2023 8:47:28 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Gilbert LaForce on behalf of PCD Engineering Division
11/7/2023 8:47:26 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/7/2023 8:47:24 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Edward Schoenheit on behalf of PCD Engineering Division
11/7/2023 8:47:22 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Engineering Manager on behalf of PCD Engineering Division
11/7/2023 8:47:20 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Charlene Durham on behalf of PCD Engineering Division
11/7/2023 8:47:18 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
11/7/2023 8:45:46 AM Submission Triaged
11/6/2023 9:51:49 AM Submission received from Applicant
8/28/2023 12:06:40 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
8/23/2023 12:33:56 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
8/22/2023 1:26:53 PM Submission request sent to Applicant
8/22/2023 1:24:20 PM Request for Review Comments returned by PCD Project Manager
8/22/2023 1:07:22 PM Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager
8/22/2023 8:42:37 AM Request for Review Comments returned by PCD Project Manager
8/15/2023 8:17:12 AM Request for Review Comments returned by PCD Engineering Division
8/14/2023 4:31:53 PM Request for Review Comments returned by EPC Stormwater Review
8/7/2023 8:32:14 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/24/2023 9:10:02 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
7/24/2023 9:10:00 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc.
7/24/2023 9:09:59 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument
7/24/2023 9:09:58 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38
7/24/2023 9:09:57 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
7/24/2023 9:09:56 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
7/24/2023 9:09:55 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
7/24/2023 9:09:49 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
7/24/2023 9:09:48 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/24/2023 9:09:45 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer
7/24/2023 9:09:44 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer
7/24/2023 9:09:43 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager
7/24/2023 9:09:41 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/24/2023 7:25:38 AM Submission Triaged
7/20/2023 5:01:49 PM Submission received from Applicant
4/7/2023 12:39:05 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
4/6/2023 7:21:48 AM Request for Review Comments returned by PCD Engineering Division
4/6/2023 7:19:55 AM Request for Review Comments email resent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/5/2023 3:01:05 PM Request for Review Comments returned by Woodmoor Water and Sanitation District
4/5/2023 12:26:19 PM Request for Review Comments returned by PCD Project Manager
4/5/2023 12:25:44 PM Submission request sent to Applicant
4/5/2023 11:36:09 AM Request for Review Comments returned by PCD Engineering Division
4/3/2023 5:25:12 PM Request for Review Comments returned by EPC Stormwater Review
3/29/2023 2:30:20 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager
3/29/2023 2:30:17 PM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/29/2023 1:16:54 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/8/2023 11:15:25 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
3/8/2023 11:15:24 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by General Email on behalf of Mountain View Electric Association, Inc.
3/8/2023 11:15:22 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Shelia Booth on behalf of Monument
3/8/2023 11:15:21 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Vicki Wood on behalf of Lewis Palmer 38
3/8/2023 11:15:20 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
3/8/2023 11:15:19 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
3/8/2023 11:15:18 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
3/8/2023 11:15:16 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by CDOT Access Mgr Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
3/8/2023 11:15:10 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/8/2023 11:15:05 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer
3/8/2023 11:15:04 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by County Engineer on behalf of EPC Public Works, County Engineer
3/8/2023 11:15:03 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Lekishia Bellamy on behalf of PCD Project Manager
3/8/2023 11:15:02 AM Request for Review Comments email sent for Project CDR HWY.105/JCP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/3/2023 3:04:12 PM Fees paid: 3/3/2023 (Receipt: 1007554)
2/27/2023 5:24:29 PM Payment Request sent: 2/27/2023
2/27/2023 5:24:24 PM File # Assigned: CDR237
2/27/2023 5:23:31 PM Submission Triaged
2/27/2023 3:12:50 PM Submission received from Applicant
2/23/2023 2:35:13 PM Submission request sent to Applicant
2/23/2023 2:27:03 PM Project Manager Assigned: Lekishia Bellamy
2/23/2023 2:27:03 PM Project Created