4/16/2025 12:49:09 PM
|
Project Closed
|
4/16/2025 12:49:09 PM
|
Project Approved: 4/16/2025
|
4/1/2025 2:35:01 PM
|
Submission Triaged
|
3/31/2025 4:54:54 PM
|
Submission received from Applicant
|
3/31/2025 2:28:42 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/28/2025 3:17:13 PM
|
Submission request sent to Applicant
|
3/28/2025 3:16:11 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/28/2025 3:13:47 PM
|
Request for Review Comments email resent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
|
3/28/2025 3:04:17 PM
|
Request for Review Comments returned by EPC Health Department
|
3/26/2025 9:20:06 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/25/2025 2:40:31 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
|
3/25/2025 2:40:30 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
|
3/25/2025 2:40:29 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
|
3/25/2025 2:40:27 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/25/2025 2:40:26 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
3/25/2025 2:37:35 PM
|
Submission Triaged
|
3/25/2025 11:22:59 AM
|
Submission received from Applicant
|
3/24/2025 10:52:36 AM
|
Submission request sent to Applicant
|
3/24/2025 9:16:10 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/24/2025 8:27:04 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/24/2025 8:26:12 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
|
3/24/2025 8:26:11 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
|
3/24/2025 8:26:10 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
|
3/24/2025 8:25:23 AM
|
Submission Triaged
|
3/24/2025 8:00:02 AM
|
Submission received from Applicant
|
3/22/2025 4:16:04 PM
|
Submission request sent to Applicant
|
3/21/2025 12:06:45 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/18/2025 9:22:24 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
|
3/18/2025 9:22:23 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
|
3/18/2025 9:22:22 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
|
3/18/2025 9:21:35 AM
|
Submission Triaged
|
3/18/2025 9:02:52 AM
|
Submission received from Applicant
|
3/18/2025 8:57:40 AM
|
Submission request sent to Applicant
|
3/14/2025 3:31:57 PM
|
Request for Review Comments returned by EPC Health Department
|
3/10/2025 5:12:50 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/10/2025 3:48:36 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/10/2025 3:48:35 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/10/2025 3:48:34 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
3/10/2025 3:48:32 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/10/2025 3:48:31 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
3/10/2025 2:54:47 PM
|
Submission Triaged
|
3/7/2025 10:36:45 AM
|
Submission received from Applicant
|
3/7/2025 8:36:36 AM
|
Submission request sent to Applicant
|
3/7/2025 8:31:44 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/5/2025 9:49:48 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/4/2025 4:46:08 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/4/2025 4:39:02 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
|
3/4/2025 4:39:01 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
|
3/4/2025 4:39:00 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
|
2/21/2025 11:11:18 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/21/2025 11:11:17 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/21/2025 11:11:16 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
2/21/2025 11:11:15 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
|
2/21/2025 11:11:14 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
|
2/21/2025 11:11:12 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
|
2/21/2025 11:11:10 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
|
2/21/2025 11:11:08 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/21/2025 11:11:07 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
2/21/2025 11:07:22 AM
|
Submission Triaged
|
2/19/2025 4:19:21 PM
|
Submission received from Applicant
|
2/19/2025 3:35:47 PM
|
Submission request sent to Applicant
|
2/19/2025 3:27:43 PM
|
Submission Triaged
|
2/14/2025 4:21:38 PM
|
Submission received from Applicant
|
2/13/2025 9:32:13 AM
|
Submission request sent to Applicant
|
2/13/2025 9:28:22 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/13/2025 9:27:31 AM
|
Submission Triaged
|
2/10/2025 5:43:50 PM
|
Submission received from Applicant
|
2/10/2025 12:25:15 PM
|
Submission request sent to Applicant
|
2/10/2025 9:02:04 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/31/2025 5:48:39 PM
|
Request for Review Comments returned by EPC Health Department
|
1/30/2025 1:44:36 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/28/2025 4:36:25 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/28/2025 4:36:24 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/28/2025 4:36:23 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
1/28/2025 4:36:22 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
|
1/28/2025 4:36:21 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
|
1/28/2025 4:36:20 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
|
1/28/2025 4:36:17 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
|
1/28/2025 4:36:15 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/28/2025 4:36:14 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
1/28/2025 4:26:32 PM
|
Submission Triaged
|
1/27/2025 5:41:57 PM
|
Submission received from Applicant
|
1/17/2025 3:40:14 PM
|
Request for Review Comments returned by EPC Health Department
|
1/14/2025 8:58:20 AM
|
Submission request sent to Applicant
|
1/14/2025 8:38:03 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/13/2025 6:31:19 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/9/2025 8:44:38 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/30/2024 1:07:25 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
12/30/2024 1:07:23 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Russell Dykstra on behalf of Garden Valley Water & Sanitation District
|
12/30/2024 1:07:21 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
|
12/30/2024 1:07:18 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/30/2024 1:07:16 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/30/2024 1:07:15 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
12/30/2024 1:07:13 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
|
12/30/2024 1:07:11 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
|
12/30/2024 1:07:09 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
|
12/30/2024 1:07:05 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
|
12/30/2024 1:07:01 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/30/2024 1:06:59 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
12/30/2024 12:59:15 PM
|
Submission Triaged
|
12/19/2024 4:55:56 PM
|
Submission received from Applicant
|
12/3/2024 10:59:09 AM
|
Project Manager Assigned: Lisa Elgin
|
8/1/2024 1:30:32 PM
|
Submission request sent to Applicant
|
8/1/2024 1:28:26 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/29/2024 3:41:55 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/26/2024 8:20:40 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/18/2024 2:18:38 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
7/18/2024 2:18:37 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/18/2024 2:18:35 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/18/2024 2:18:33 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
7/18/2024 2:18:29 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Kari Parsons on behalf of PCD Project Manager
|
7/18/2024 2:18:25 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/18/2024 2:18:23 PM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
7/18/2024 10:55:14 AM
|
Submission Triaged
|
7/17/2024 2:45:56 PM
|
Submission received from Applicant
|
6/5/2024 10:08:01 AM
|
Submission request sent to Applicant
|
6/3/2024 2:11:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/28/2024 7:24:54 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/28/2024 4:33:40 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/28/2024 2:57:22 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/28/2024 11:22:20 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
5/28/2024 9:28:56 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/14/2024 11:38:33 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
5/14/2024 11:38:30 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/14/2024 11:38:28 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mark Wilsey on behalf of Harrison SD 2
|
5/14/2024 11:38:26 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Russell Dykstra on behalf of Garden Valley Water & Sanitation District
|
5/14/2024 11:38:25 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
|
5/14/2024 11:38:22 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
5/14/2024 11:38:21 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Katie Miller on behalf of El Paso County Conservation Dist
|
5/14/2024 11:38:19 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
5/14/2024 11:38:17 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by on behalf of Pikes Peak Regional Building Department
|
5/14/2024 11:38:15 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/14/2024 11:38:13 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/14/2024 11:38:11 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/14/2024 11:38:09 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
|
5/14/2024 11:38:07 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
|
5/14/2024 11:38:05 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
|
5/14/2024 11:38:03 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
|
5/14/2024 11:37:59 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Kari Parsons on behalf of PCD Project Manager
|
5/14/2024 11:37:57 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/14/2024 11:37:55 AM
|
Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
|
5/13/2024 4:08:43 PM
|
Fees paid: 5/13/2024 (Receipt: 1009120)
|
5/8/2024 2:59:06 PM
|
Project Manager Assigned: Scott Weeks
|
5/8/2024 2:58:45 PM
|
Payment Request sent: 5/8/2024
|
5/8/2024 2:58:45 PM
|
File # Assigned: PPR2417
|
5/8/2024 2:58:37 PM
|
Submission Triaged
|
5/8/2024 1:02:16 PM
|
Submission received from Applicant
|
1/23/2024 8:29:41 AM
|
Submission request sent to Applicant
|
12/13/2022 10:34:24 AM
|
Submission request sent to Applicant
|
12/13/2022 10:33:14 AM
|
Project Created
|