Project Details

Search


File Number
PPR2417
Project Name
High Country Crane New Office/Warehouse
Description
Administrative site development plan to add an office/warehouse building to an existing site. Applicant would like to construct an 80’ x 275’ (22,000 SF) office/warehouse on the property in addition to the existing 13,200 SF office/warehouse. The construction of the new office/warehouse including new parking area and warehouse entrance pavement will disturb less than 1 acre (35,050 SF) and required earthwork will be less than 500 CY’s.
Parcels
6428301005 6428301005
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
File Prefix
PPR - Plot Plan Review
Year
2024
Project Manager
Lisa Elgin
Status
Closed
Created
12/13/2022 10:32:55 AM

View: Review Comments


Approved Documents (9)

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View PBMP Applicability Form
View PDB/BMP Operations & Maintenance Manual
View SDI Form or MHFD Detention Calculations
View Storm Water Management Plan (SWMP)
View Grading & Erosion Control Plan
View Maintenance Agreement (MS Word version required attachments included)
View Approved Site Development Plan


Additional Documents (2)

Link Document Comment
View Recorded Private Detention Basin Stormwater Quality Best Management Practice Maintenance Agreement and Easement - 225027607
View Signed ESQCP


Review Documents (23)

Link Document Date
View Application/Petition Form 1/27/2025 5:34:45 PM
View Legal Description (MS WORD Version required) 2/19/2025 4:18:46 PM
View Letter of Intent 3/31/2025 4:54:49 PM
View Title Commitment (Current within 30 days of submittal) 12/19/2024 4:55:34 PM
View Vicinity/Location Map 12/19/2024 4:55:35 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 3/7/2025 10:34:47 AM
View Financial Assurance Forms 2/19/2025 4:18:44 PM
View Floor Plans (24" x 36") 12/19/2024 4:55:32 PM
View PBMP Applicability Form 12/19/2024 4:55:36 PM
View PDB/BMP Operations & Maintenance Manual 2/19/2025 4:18:47 PM
View SDI Form or MHFD Detention Calculations 1/27/2025 5:34:51 PM
View Storm Water Management Plan (SWMP) 1/27/2025 5:34:49 PM
View Grading & Erosion Control Plan 3/25/2025 11:21:42 AM
View Landscape Plan drawings 12/19/2024 4:55:32 PM
View Lighting Plan 12/19/2024 4:55:34 PM
View Site Development Plan 3/25/2025 11:21:43 AM
View Drainage Report - Final 2/19/2025 4:18:44 PM
View BMP Maintenance Agreement 3/24/2025 7:56:52 AM
View Drainage Letter 12/19/2024 4:55:30 PM
View Elevation Plans 12/19/2024 4:55:31 PM
View GEC Checklist 1/27/2025 5:34:53 PM
View Site Development Plan 12/19/2024 4:55:37 PM
View SWMP Checklist 2/19/2025 4:18:49 PM



Events (150)

Date Comment
4/16/2025 12:49:09 PM Project Closed
4/16/2025 12:49:09 PM Project Approved: 4/16/2025
4/1/2025 2:35:01 PM Submission Triaged
3/31/2025 4:54:54 PM Submission received from Applicant
3/31/2025 2:28:42 PM Request for Review Comments returned by County Attorney - Development Review
3/28/2025 3:17:13 PM Submission request sent to Applicant
3/28/2025 3:16:11 PM Request for Review Comments returned by PCD Project Manager
3/28/2025 3:13:47 PM Request for Review Comments email resent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
3/28/2025 3:04:17 PM Request for Review Comments returned by EPC Health Department
3/26/2025 9:20:06 AM Request for Review Comments returned by PCD Engineering Division
3/25/2025 2:40:31 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
3/25/2025 2:40:30 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
3/25/2025 2:40:29 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
3/25/2025 2:40:27 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
3/25/2025 2:40:26 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
3/25/2025 2:37:35 PM Submission Triaged
3/25/2025 11:22:59 AM Submission received from Applicant
3/24/2025 10:52:36 AM Submission request sent to Applicant
3/24/2025 9:16:10 AM Request for Review Comments returned by PCD Engineering Division
3/24/2025 8:27:04 AM Request for Review Comments returned by EPC Stormwater Review
3/24/2025 8:26:12 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
3/24/2025 8:26:11 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
3/24/2025 8:26:10 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
3/24/2025 8:25:23 AM Submission Triaged
3/24/2025 8:00:02 AM Submission received from Applicant
3/22/2025 4:16:04 PM Submission request sent to Applicant
3/21/2025 12:06:45 PM Request for Review Comments returned by County Attorney - Development Review
3/18/2025 9:22:24 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
3/18/2025 9:22:23 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
3/18/2025 9:22:22 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
3/18/2025 9:21:35 AM Submission Triaged
3/18/2025 9:02:52 AM Submission received from Applicant
3/18/2025 8:57:40 AM Submission request sent to Applicant
3/14/2025 3:31:57 PM Request for Review Comments returned by EPC Health Department
3/10/2025 5:12:50 PM Request for Review Comments returned by County Attorney - Development Review
3/10/2025 3:48:36 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
3/10/2025 3:48:35 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
3/10/2025 3:48:34 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
3/10/2025 3:48:32 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
3/10/2025 3:48:31 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
3/10/2025 2:54:47 PM Submission Triaged
3/7/2025 10:36:45 AM Submission received from Applicant
3/7/2025 8:36:36 AM Submission request sent to Applicant
3/7/2025 8:31:44 AM Request for Review Comments returned by PCD Project Manager
3/5/2025 9:49:48 AM Request for Review Comments returned by PCD Engineering Division
3/4/2025 4:46:08 PM Request for Review Comments returned by EPC Stormwater Review
3/4/2025 4:39:02 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Lori Seago on behalf of County Attorney - Development Review
3/4/2025 4:39:01 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Erika Keech on behalf of County Attorney - Development Review
3/4/2025 4:39:00 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by April Willie on behalf of County Attorney - Development Review
2/21/2025 11:11:18 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/21/2025 11:11:17 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
2/21/2025 11:11:16 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
2/21/2025 11:11:15 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
2/21/2025 11:11:14 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
2/21/2025 11:11:12 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
2/21/2025 11:11:10 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
2/21/2025 11:11:08 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
2/21/2025 11:11:07 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
2/21/2025 11:07:22 AM Submission Triaged
2/19/2025 4:19:21 PM Submission received from Applicant
2/19/2025 3:35:47 PM Submission request sent to Applicant
2/19/2025 3:27:43 PM Submission Triaged
2/14/2025 4:21:38 PM Submission received from Applicant
2/13/2025 9:32:13 AM Submission request sent to Applicant
2/13/2025 9:28:22 AM Request for Review Comments returned by EPC Stormwater Review
2/13/2025 9:27:31 AM Submission Triaged
2/10/2025 5:43:50 PM Submission received from Applicant
2/10/2025 12:25:15 PM Submission request sent to Applicant
2/10/2025 9:02:04 AM Request for Review Comments returned by PCD Engineering Division
1/31/2025 5:48:39 PM Request for Review Comments returned by EPC Health Department
1/30/2025 1:44:36 PM Request for Review Comments returned by PCD Project Manager
1/28/2025 4:36:25 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
1/28/2025 4:36:24 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
1/28/2025 4:36:23 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
1/28/2025 4:36:22 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
1/28/2025 4:36:21 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
1/28/2025 4:36:20 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
1/28/2025 4:36:17 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
1/28/2025 4:36:15 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
1/28/2025 4:36:14 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
1/28/2025 4:26:32 PM Submission Triaged
1/27/2025 5:41:57 PM Submission received from Applicant
1/17/2025 3:40:14 PM Request for Review Comments returned by EPC Health Department
1/14/2025 8:58:20 AM Submission request sent to Applicant
1/14/2025 8:38:03 AM Request for Review Comments returned by PCD Project Manager
1/13/2025 6:31:19 PM Request for Review Comments returned by EPC Stormwater Review
1/9/2025 8:44:38 AM Request for Review Comments returned by PCD Engineering Division
12/30/2024 1:07:25 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
12/30/2024 1:07:23 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Russell Dykstra on behalf of Garden Valley Water & Sanitation District
12/30/2024 1:07:21 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
12/30/2024 1:07:18 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
12/30/2024 1:07:16 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
12/30/2024 1:07:15 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
12/30/2024 1:07:13 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
12/30/2024 1:07:11 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
12/30/2024 1:07:09 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
12/30/2024 1:07:05 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Justin Kilgore on behalf of PCD Project Manager
12/30/2024 1:07:01 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
12/30/2024 1:06:59 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
12/30/2024 12:59:15 PM Submission Triaged
12/19/2024 4:55:56 PM Submission received from Applicant
12/3/2024 10:59:09 AM Project Manager Assigned: Lisa Elgin
8/1/2024 1:30:32 PM Submission request sent to Applicant
8/1/2024 1:28:26 PM Request for Review Comments returned by PCD Project Manager
7/29/2024 3:41:55 PM Request for Review Comments returned by EPC Stormwater Review
7/26/2024 8:20:40 AM Request for Review Comments returned by PCD Engineering Division
7/18/2024 2:18:38 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Shannon Mustoe on behalf of EPC Stormwater Review
7/18/2024 2:18:37 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
7/18/2024 2:18:35 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
7/18/2024 2:18:33 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
7/18/2024 2:18:29 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Kari Parsons on behalf of PCD Project Manager
7/18/2024 2:18:25 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
7/18/2024 2:18:23 PM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
7/18/2024 10:55:14 AM Submission Triaged
7/17/2024 2:45:56 PM Submission received from Applicant
6/5/2024 10:08:01 AM Submission request sent to Applicant
6/3/2024 2:11:03 PM Request for Review Comments returned by PCD Project Manager
5/28/2024 7:24:54 PM Request for Review Comments returned by PCD Engineering Division
5/28/2024 4:33:40 PM Request for Review Comments returned by EPC Stormwater Review
5/28/2024 2:57:22 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/28/2024 11:22:20 AM Request for Review Comments returned by El Paso County Conservation Dist
5/28/2024 9:28:56 AM Request for Review Comments returned by Pikes Peak Regional Building Department
5/14/2024 11:38:33 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
5/14/2024 11:38:30 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by General Email on behalf of Mountain View Electric Association, Inc.
5/14/2024 11:38:28 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mark Wilsey on behalf of Harrison SD 2
5/14/2024 11:38:26 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Russell Dykstra on behalf of Garden Valley Water & Sanitation District
5/14/2024 11:38:25 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Brenda Smith on behalf of Garden Valley Water & Sanitation District
5/14/2024 11:38:22 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Oliver Watkins on behalf of El Paso County Conservation Dist
5/14/2024 11:38:21 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Katie Miller on behalf of El Paso County Conservation Dist
5/14/2024 11:38:19 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mariah Hudson on behalf of El Paso County Conservation Dist
5/14/2024 11:38:17 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by on behalf of Pikes Peak Regional Building Department
5/14/2024 11:38:15 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Shannon Mustoe on behalf of EPC Stormwater Review
5/14/2024 11:38:13 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mikayla Hartford on behalf of EPC Stormwater Review
5/14/2024 11:38:11 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Glenn Reese on behalf of EPC Stormwater Review
5/14/2024 11:38:09 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Christina Prete on behalf of EPC Stormwater Review
5/14/2024 11:38:07 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Mike McCarthy on behalf of EPC Health Department
5/14/2024 11:38:05 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Catherine McGarvy on behalf of EPC Health Department
5/14/2024 11:38:03 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by HEAEH LandUse on behalf of EPC Health Department
5/14/2024 11:37:59 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Kari Parsons on behalf of PCD Project Manager
5/14/2024 11:37:57 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Gilbert LaForce on behalf of PCD Engineering Division
5/14/2024 11:37:55 AM Request for Review Comments email sent for Project High Country Crane New Office/Warehouse for review by Engineering Manager on behalf of PCD Engineering Division
5/13/2024 4:08:43 PM Fees paid: 5/13/2024 (Receipt: 1009120)
5/8/2024 2:59:06 PM Project Manager Assigned: Scott Weeks
5/8/2024 2:58:45 PM Payment Request sent: 5/8/2024
5/8/2024 2:58:45 PM File # Assigned: PPR2417
5/8/2024 2:58:37 PM Submission Triaged
5/8/2024 1:02:16 PM Submission received from Applicant
1/23/2024 8:29:41 AM Submission request sent to Applicant
12/13/2022 10:34:24 AM Submission request sent to Applicant
12/13/2022 10:33:14 AM Project Created