10/2/2024 8:16:32 AM
|
Project Closed
|
10/2/2024 8:16:32 AM
|
Project Approved: 10/2/2024
|
10/2/2024 7:52:34 AM
|
Submission Triaged
|
10/1/2024 1:48:28 PM
|
Submission received from Applicant
|
9/30/2024 10:19:23 AM
|
Submission request sent to Applicant
|
9/30/2024 10:02:26 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/26/2024 1:44:20 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/25/2024 10:53:26 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/25/2024 7:32:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/24/2024 5:03:28 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
9/24/2024 5:03:26 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
9/24/2024 5:03:24 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
9/24/2024 5:01:48 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/24/2024 5:01:47 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
9/24/2024 5:01:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
9/24/2024 5:00:36 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
9/24/2024 5:00:34 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
9/24/2024 5:00:32 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
9/24/2024 4:59:35 PM
|
Submission Triaged
|
9/24/2024 12:47:13 PM
|
Submission received from Applicant
|
9/24/2024 10:44:25 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/18/2024 5:31:23 PM
|
Submission request sent to Applicant
|
9/18/2024 5:12:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/17/2024 8:22:37 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/17/2024 8:22:35 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
9/17/2024 8:22:34 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
9/17/2024 8:22:32 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
9/17/2024 8:22:28 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/17/2024 8:22:26 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
9/17/2024 8:20:45 AM
|
Submission Triaged
|
9/16/2024 5:15:27 PM
|
Submission received from Applicant
|
9/12/2024 2:48:32 PM
|
Submission request sent to Applicant
|
9/12/2024 2:48:01 PM
|
Submission request sent to Applicant
|
9/12/2024 1:47:36 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/12/2024 1:22:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/12/2024 11:21:58 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/12/2024 7:15:49 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
9/12/2024 7:15:48 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
9/12/2024 7:15:46 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
9/12/2024 7:15:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/12/2024 7:15:42 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
9/12/2024 7:15:40 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
9/12/2024 7:12:59 AM
|
Submission Triaged
|
9/11/2024 5:34:21 PM
|
Submission received from Applicant
|
9/10/2024 11:38:31 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/10/2024 9:41:21 AM
|
Submission request sent to Applicant
|
9/10/2024 8:40:07 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/3/2024 7:50:53 AM
|
Submission Triaged
|
8/30/2024 12:01:28 PM
|
Submission received from Applicant
|
8/29/2024 2:26:18 PM
|
Submission request sent to Applicant
|
8/26/2024 1:11:47 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/26/2024 1:11:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/26/2024 1:11:43 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
8/26/2024 1:11:41 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/26/2024 1:11:39 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Erika Keech on behalf of County Attorney - Development Review
|
8/26/2024 1:11:37 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
8/26/2024 1:11:34 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
8/26/2024 1:11:31 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/26/2024 1:11:29 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/26/2024 1:11:25 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of PCD Administrative Notice
|
8/26/2024 1:11:23 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Miranda Benson on behalf of PCD Administrative Notice
|
8/26/2024 1:08:51 PM
|
Submission Triaged
|
8/26/2024 11:56:14 AM
|
Submission received from Applicant
|
12/11/2023 1:08:32 PM
|
Submission request sent to Applicant
|
12/11/2023 1:07:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/11/2023 12:42:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/5/2023 11:17:59 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/16/2023 1:44:25 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/14/2023 8:20:45 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
11/14/2023 8:20:44 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Glenn Reese on behalf of EPC Stormwater Review
|
11/14/2023 8:20:42 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Christina Prete on behalf of EPC Stormwater Review
|
11/14/2023 8:20:39 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
11/14/2023 8:20:37 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Development Review
|
11/14/2023 8:20:33 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lupe Packman on behalf of PCD Engineering Division
|
11/14/2023 8:20:29 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/14/2023 8:20:27 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/14/2023 8:20:25 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Edward Schoenheit on behalf of PCD Engineering Division
|
11/14/2023 8:20:23 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
11/14/2023 8:20:21 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Charlene Durham on behalf of PCD Engineering Division
|
11/14/2023 8:20:19 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
11/14/2023 8:17:33 AM
|
Submission Triaged
|
11/14/2023 8:04:28 AM
|
Submission received from Applicant
|
10/11/2023 2:25:31 PM
|
Submission request sent to Applicant
|
10/11/2023 2:19:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/11/2023 10:59:53 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/9/2023 8:42:51 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/28/2023 12:42:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/28/2023 12:26:11 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/28/2023 9:05:48 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/26/2023 11:05:08 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/19/2023 2:46:49 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
9/6/2023 3:20:49 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
8/29/2023 3:00:11 PM
|
Request for Review Comments returned by RBD Floodplain
|
8/29/2023 2:08:01 PM
|
Submission Triaged
|
8/29/2023 2:04:14 PM
|
Submission received from Applicant
|
8/29/2023 2:00:43 PM
|
Submission request sent to Applicant
|
8/29/2023 7:55:50 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of PCD Administrative Notice
|
8/29/2023 7:55:19 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
8/29/2023 7:55:18 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Keith Curtis on behalf of RBD Floodplain
|
8/29/2023 7:55:17 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/29/2023 7:55:15 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
8/29/2023 7:55:12 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/29/2023 7:55:11 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/29/2023 7:55:09 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of PCD Administrative Notice
|
8/29/2023 7:52:44 AM
|
Submission Triaged
|
8/29/2023 7:42:31 AM
|
Submission received from Applicant
|
5/3/2023 1:23:20 PM
|
Request for Review Comments returned by Parks Advisory Board
|
4/25/2023 12:19:29 PM
|
Submission request sent to Applicant
|
4/25/2023 11:40:14 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/25/2023 8:33:39 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/25/2023 7:17:34 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/20/2023 3:53:31 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/19/2023 10:22:56 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/29/2023 4:47:10 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
3/29/2023 4:47:08 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
3/29/2023 4:47:07 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of Parks Advisory Board
|
3/29/2023 4:47:05 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/29/2023 4:47:02 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
3/29/2023 4:47:01 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/29/2023 4:46:59 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
3/29/2023 4:46:57 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/29/2023 4:46:56 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of PCD Administrative Notice
|
3/29/2023 4:44:48 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/29/2023 4:41:09 PM
|
Submission Triaged
|
3/29/2023 2:20:38 PM
|
Submission received from Applicant
|
1/27/2023 3:28:06 PM
|
Request for Review Comments returned by EPC Health Department
|
1/23/2023 7:04:35 AM
|
Submission request sent to Applicant
|
1/20/2023 3:40:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/19/2023 12:42:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/19/2023 12:37:19 PM
|
Request for Review Comments email resent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
1/19/2023 12:25:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/12/2023 4:00:49 PM
|
Request for Review Comments returned by Parks Advisory Board
|
1/11/2023 1:05:13 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/10/2023 2:40:33 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/6/2023 12:57:16 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/6/2023 10:36:05 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/4/2023 8:05:05 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
1/4/2023 7:28:08 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
12/30/2022 12:01:08 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
12/22/2022 4:51:31 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
12/22/2022 9:40:12 AM
|
Request for Review Comments returned by Woodmen Hills Metro
|
12/21/2022 3:22:29 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/20/2022 8:45:35 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
12/20/2022 8:45:04 AM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
12/20/2022 6:51:11 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/19/2022 4:25:50 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/19/2022 10:52:51 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/16/2022 2:49:48 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/16/2022 12:08:29 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/15/2022 10:23:46 AM
|
Request for Review Comments returned by RBD Floodplain
|
12/15/2022 8:42:12 AM
|
Request for Review Comments returned by US Postal Service
|
12/14/2022 11:39:23 AM
|
Request for Review Comments returned by EPC Environmental Services
|
12/14/2022 9:39:24 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/13/2022 4:03:31 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Jerry Jacobson on behalf of Woodmen Hills Metro
|
12/13/2022 4:03:30 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Susan Davies on behalf of Trails and Open Space Coalition
|
12/13/2022 4:03:29 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
12/13/2022 4:03:28 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/13/2022 4:03:27 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/13/2022 4:03:26 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
12/13/2022 4:03:25 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Elizabeth Dukes on behalf of Falcon School District 49
|
12/13/2022 4:03:24 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
12/13/2022 4:03:21 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/13/2022 4:03:20 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
12/13/2022 4:03:17 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/13/2022 4:03:16 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
12/13/2022 4:03:15 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
12/13/2022 4:03:13 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
12/13/2022 4:03:11 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
12/13/2022 4:03:10 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/13/2022 4:03:09 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Keith Curtis on behalf of RBD Floodplain
|
12/13/2022 4:03:08 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/13/2022 4:03:07 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/13/2022 4:03:06 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Rita Otega on behalf of US Postal Service
|
12/13/2022 4:03:03 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
12/13/2022 4:03:02 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/13/2022 4:02:53 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/13/2022 4:02:51 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
12/13/2022 4:02:49 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of Parks Advisory Board
|
12/13/2022 4:02:48 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/13/2022 4:02:46 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/13/2022 4:02:45 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/13/2022 4:02:44 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
12/13/2022 4:02:43 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of EPC Parks Department
|
12/13/2022 4:02:42 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Catherine McGarvy on behalf of EPC Health Department
|
12/13/2022 4:02:37 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/13/2022 4:02:36 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by April Willie on behalf of County Attorney - Water
|
12/13/2022 4:02:35 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/13/2022 4:02:33 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
12/13/2022 4:02:32 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/13/2022 4:02:31 PM
|
Request for Review Comments email sent for Project Sterling Ranch East Filing No. 2 for review by on behalf of PCD Administrative Notice
|
12/13/2022 3:48:41 PM
|
Fees paid: 12/13/2022 (Receipt: 1007278)
|
12/12/2022 8:48:13 AM
|
Payment Request sent: 12/12/2022
|
12/12/2022 8:48:12 AM
|
File # Assigned: SF2237
|
12/12/2022 8:48:09 AM
|
Submission Triaged
|
12/9/2022 10:56:29 AM
|
Submission received from Applicant
|
12/7/2022 7:26:38 AM
|
Submission request sent to Applicant
|
12/7/2022 7:25:41 AM
|
Project Manager Assigned: Kari Parsons
|
12/7/2022 7:25:40 AM
|
EA Assigned: EA1895
|
12/7/2022 7:25:40 AM
|
Project Created
|