8/16/2024 10:22:47 AM
|
Project Closed
|
8/16/2024 10:22:47 AM
|
Project Approved: 8/16/2024
|
7/24/2024 10:59:29 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
7/18/2024 8:14:00 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/24/2024 12:07:15 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/20/2024 4:04:20 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/20/2024 11:24:13 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
6/20/2024 11:24:11 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
6/20/2024 11:24:09 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
6/20/2024 11:24:07 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/20/2024 11:24:06 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
6/20/2024 11:22:54 AM
|
Submission Triaged
|
6/20/2024 11:16:43 AM
|
Submission received from Applicant
|
6/19/2024 4:42:59 PM
|
Submission request sent to Applicant
|
6/19/2024 4:17:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/14/2024 12:14:14 PM
|
Request for Review Comments returned by EPC Environmental Services
|
6/11/2024 8:50:25 AM
|
Request for Review Comments sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
6/7/2024 12:39:35 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
6/7/2024 12:39:33 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
6/7/2024 12:39:31 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
6/7/2024 12:39:29 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
6/7/2024 12:39:25 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
6/7/2024 12:39:23 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/7/2024 12:39:22 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
6/6/2024 1:05:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/28/2024 12:30:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/24/2024 10:17:12 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
5/24/2024 10:17:10 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
5/24/2024 10:17:08 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
5/24/2024 10:15:57 AM
|
Submission Triaged
|
5/24/2024 8:58:56 AM
|
Submission received from Applicant
|
5/23/2024 5:20:06 PM
|
Submission request sent to Applicant
|
5/23/2024 4:52:14 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/16/2024 2:36:04 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
|
5/16/2024 2:36:03 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
5/15/2024 1:18:11 PM
|
Request for Review Comments sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
5/15/2024 1:17:51 PM
|
Request for Review Comments sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
5/15/2024 1:17:00 PM
|
Project reopened for Review Comments
|
5/15/2024 1:16:32 PM
|
Submission Triaged
|
5/15/2024 9:05:24 AM
|
Submission received from Applicant
|
5/14/2024 12:11:14 PM
|
Submission request sent to Applicant
|
5/7/2024 11:02:15 AM
|
Fees paid: 5/7/2024 (Receipt: 1009084)
|
5/7/2024 10:59:47 AM
|
Payment Request sent: 5/7/2024
|
4/26/2024 2:16:54 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
4/18/2024 1:33:23 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/17/2024 12:32:42 PM
|
Submission request canceled
|
4/17/2024 7:56:26 AM
|
Submission request sent to Applicant
|
4/17/2024 7:42:26 AM
|
Request for Review Comments email resent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
4/16/2024 6:31:13 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/16/2024 11:06:41 AM
|
Request for Review Comments returned by EPC Parks Department
|
4/12/2024 12:05:04 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/12/2024 11:56:57 AM
|
Request for Review Comments sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of EPC Parks Department
|
4/2/2024 1:25:49 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
4/2/2024 1:25:47 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/2/2024 1:25:44 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
4/2/2024 1:23:43 PM
|
Submission Triaged
|
4/2/2024 12:53:25 PM
|
Submission received from Applicant
|
4/2/2024 10:59:53 AM
|
Submission request sent to Applicant
|
3/26/2024 1:08:08 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/8/2024 12:24:39 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/5/2024 3:47:25 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/1/2024 11:58:38 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
3/1/2024 11:58:36 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
3/1/2024 11:58:01 AM
|
Submission request sent to Applicant
|
3/1/2024 7:43:30 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/23/2024 12:32:37 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/22/2024 12:15:22 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/21/2024 5:18:37 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/21/2024 8:27:48 AM
|
Request for Review Comments email resent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
2/20/2024 12:10:51 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/15/2024 5:03:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/14/2024 11:47:29 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/9/2024 10:56:08 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/9/2024 10:02:09 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/9/2024 10:02:07 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/9/2024 10:02:05 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
2/9/2024 10:02:03 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/9/2024 10:02:01 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
2/9/2024 10:01:59 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
2/9/2024 10:01:57 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
2/9/2024 10:01:55 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
2/9/2024 10:01:51 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Hao Vo on behalf of PCD Engineering Division
|
2/9/2024 10:01:49 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/9/2024 10:01:47 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
2/9/2024 9:58:52 AM
|
Submission Triaged
|
2/9/2024 9:14:05 AM
|
Submission received from Applicant
|
2/6/2024 4:38:04 PM
|
Submission request sent to Applicant
|
1/22/2024 8:13:45 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/18/2024 4:08:30 PM
|
Request for Review Comments email resent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/18/2024 3:13:46 PM
|
Submission request sent to Applicant
|
1/18/2024 3:09:10 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/18/2024 10:39:53 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/18/2024 9:49:41 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/18/2024 8:23:47 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/11/2024 8:01:30 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/10/2024 9:45:33 AM
|
Request for Review Comments returned by County Attorney - Water
|
1/9/2024 4:41:37 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/9/2024 7:50:15 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/8/2024 1:37:23 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/5/2024 2:47:21 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Tim Thomas on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:19 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Paul Clifton on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:17 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:15 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gary Rust on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:13 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Caelen Went on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:12 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/5/2024 2:47:09 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of Cascade Volunteer Fire Department
|
1/5/2024 2:47:06 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/5/2024 2:47:04 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/5/2024 2:47:02 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/5/2024 2:46:59 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/5/2024 2:46:57 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/5/2024 2:46:55 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/5/2024 2:46:53 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
1/5/2024 2:46:51 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/5/2024 2:46:49 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/5/2024 2:46:47 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/5/2024 2:46:45 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
1/5/2024 2:46:43 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
1/5/2024 2:46:41 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
1/5/2024 2:46:39 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
1/5/2024 2:46:37 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/5/2024 2:46:35 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
1/5/2024 2:46:34 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
1/5/2024 2:46:32 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
1/5/2024 2:46:30 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
1/5/2024 2:46:26 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/5/2024 2:46:24 PM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
1/5/2024 1:48:05 PM
|
Submission Triaged
|
1/5/2024 8:34:15 AM
|
Submission received from Applicant
|
12/20/2023 4:04:38 PM
|
Submission request sent to Applicant
|
8/22/2023 12:00:13 PM
|
Submission request sent to Applicant
|
5/15/2023 9:30:50 AM
|
Request for Review Comments returned by County Attorney - Water
|
5/5/2023 10:56:04 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
5/3/2023 4:27:26 PM
|
Submission request sent to Applicant
|
5/3/2023 3:28:57 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/27/2023 12:35:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/20/2023 1:57:07 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/20/2023 10:34:32 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/19/2023 2:52:08 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/19/2023 2:23:02 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/18/2023 4:46:17 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/17/2023 9:12:13 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/13/2023 12:15:13 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/11/2023 9:05:28 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/6/2023 2:32:34 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
4/5/2023 3:50:26 PM
|
Request for Review Comments returned by Parks Advisory Board
|
4/5/2023 3:49:31 PM
|
Request for Review Comments returned by EPC Parks Department
|
4/3/2023 10:58:34 AM
|
Request for Review Comments returned by RBD Floodplain
|
4/3/2023 9:34:08 AM
|
Request for Review Comments returned by US Postal Service
|
3/30/2023 2:23:46 PM
|
Request for Review Comments returned by EPC Environmental Services
|
3/29/2023 9:40:04 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Assistant Superintendent on behalf of Manitou Springs SD 14
|
3/29/2023 9:40:02 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
3/29/2023 9:40:00 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/29/2023 9:39:58 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Contact on behalf of Cascade Volunteer Fire Department
|
3/29/2023 9:39:56 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
3/29/2023 9:39:53 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/29/2023 9:39:51 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/29/2023 9:39:49 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Rita Otega on behalf of US Postal Service
|
3/29/2023 9:39:47 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
3/29/2023 9:39:44 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/29/2023 9:39:42 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
3/29/2023 9:39:40 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
3/29/2023 9:39:39 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/29/2023 9:39:25 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/29/2023 9:39:23 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/29/2023 9:39:20 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by CDOT Permits Program Mgr Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
3/29/2023 9:39:12 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of Parks Advisory Board
|
3/29/2023 9:39:08 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/29/2023 9:39:04 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/29/2023 9:39:02 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/29/2023 9:39:01 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
3/29/2023 9:38:59 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by on behalf of EPC Parks Department
|
3/29/2023 9:38:56 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
3/29/2023 9:38:50 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/29/2023 9:38:48 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
3/29/2023 9:38:44 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
3/29/2023 9:38:39 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
3/29/2023 9:38:38 AM
|
Request for Review Comments email sent for Project Guntzelman Porcelain Pines Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/28/2023 3:08:25 PM
|
Fees paid: 3/28/2023 (Receipt: 1007658)
|
2/21/2023 11:17:45 AM
|
Payment Request sent: 2/21/2023
|
2/21/2023 11:17:43 AM
|
File # Assigned: MS234
|
2/21/2023 11:17:20 AM
|
Submission Triaged
|
2/21/2023 11:04:48 AM
|
Submission received from Applicant
|
2/17/2023 4:19:56 PM
|
Submission request sent to Applicant
|
2/17/2023 4:19:51 PM
|
Submission Triaged
|
2/17/2023 1:32:38 PM
|
Submission received from Applicant
|
11/17/2022 12:13:50 PM
|
Project Manager Assigned: Ryan Howser
|
11/17/2022 12:11:13 PM
|
Submission request sent to Applicant
|
11/17/2022 12:05:14 PM
|
EA Assigned: EA21182
|
11/17/2022 12:05:14 PM
|
Project Created
|