6/18/2025 1:34:46 PM
|
Project Closed
|
6/18/2025 1:34:46 PM
|
Project Approved: 6/18/2025
|
5/22/2025 11:27:37 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/1/2025 11:06:13 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
5/1/2025 11:06:12 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
5/1/2025 11:06:11 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
5/1/2025 11:04:35 AM
|
Submission Triaged
|
5/1/2025 10:17:29 AM
|
Submission received from Applicant
|
4/30/2025 9:53:53 AM
|
Submission request sent to Applicant
|
4/30/2025 9:10:58 AM
|
Submission Triaged
|
4/30/2025 8:40:34 AM
|
Submission received from Applicant
|
4/30/2025 8:09:55 AM
|
Submission request sent to Applicant
|
4/18/2025 11:38:51 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/2/2025 6:54:59 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/28/2025 12:09:44 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
3/28/2025 12:09:43 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
3/28/2025 12:09:42 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
3/28/2025 12:07:53 PM
|
Submission Triaged
|
3/28/2025 11:43:06 AM
|
Submission received from Applicant
|
3/28/2025 11:29:59 AM
|
Submission request sent to Applicant
|
3/28/2025 9:28:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/13/2025 11:55:39 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/13/2025 10:34:09 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/13/2025 10:34:08 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/13/2025 10:34:07 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
3/13/2025 10:34:05 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Justin Kilgore on behalf of PCD Project Manager
|
3/13/2025 10:34:03 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/13/2025 10:34:01 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
3/13/2025 8:44:26 AM
|
Submission Triaged
|
3/12/2025 2:20:46 PM
|
Submission received from Applicant
|
3/12/2025 12:50:50 PM
|
Submission request sent to Applicant
|
3/12/2025 12:49:44 PM
|
Project reopened for Review Comments
|
1/29/2025 4:11:04 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
1/23/2025 1:22:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/22/2025 2:46:45 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/16/2025 1:36:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/15/2025 12:34:40 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/9/2025 3:46:41 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/9/2025 3:46:40 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/9/2025 3:46:39 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
1/9/2025 3:46:38 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
1/9/2025 3:46:37 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
1/9/2025 3:46:36 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
1/9/2025 3:46:34 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Justin Kilgore on behalf of PCD Project Manager
|
1/9/2025 3:46:33 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/9/2025 3:46:31 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
1/9/2025 3:36:34 PM
|
Submission Triaged
|
1/8/2025 2:16:02 PM
|
Submission received from Applicant
|
12/30/2024 2:13:41 PM
|
Submission request sent to Applicant
|
12/17/2024 9:07:41 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/16/2024 3:14:34 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/16/2024 11:23:08 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/12/2024 12:14:07 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/6/2024 2:54:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/3/2024 11:33:21 AM
|
Project Manager Assigned: Lisa Elgin
|
12/2/2024 2:56:54 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by on behalf of Pikes Peak Regional Building Department
|
12/2/2024 2:56:52 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/2/2024 2:56:50 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/2/2024 2:56:49 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
12/2/2024 2:56:47 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
12/2/2024 2:56:45 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
12/2/2024 2:56:43 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
12/2/2024 2:56:39 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Justin Kilgore on behalf of PCD Project Manager
|
12/2/2024 2:56:35 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/2/2024 2:56:34 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
12/2/2024 2:33:14 PM
|
Submission Triaged
|
11/22/2024 10:32:05 AM
|
Submission received from Applicant
|
11/14/2024 8:31:27 AM
|
Submission request sent to Applicant
|
9/4/2024 9:54:38 AM
|
Submission request sent to Applicant
|
9/4/2024 9:51:45 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/3/2024 12:15:32 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/3/2024 11:33:25 AM
|
Request for Review Comments returned by PCD Engineering Division
|
8/29/2024 1:49:59 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/21/2024 2:49:57 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Kari Parsons on behalf of PCD Project Manager
|
8/21/2024 2:40:35 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
8/21/2024 2:40:33 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/21/2024 2:40:31 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/21/2024 2:40:29 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
8/21/2024 2:40:27 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mike McCarthy on behalf of EPC Health Department
|
8/21/2024 2:40:25 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Catherine McGarvy on behalf of EPC Health Department
|
8/21/2024 2:40:23 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by HEAEH LandUse on behalf of EPC Health Department
|
8/21/2024 2:40:21 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
8/21/2024 2:40:19 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
8/21/2024 2:40:17 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
8/21/2024 2:40:13 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/21/2024 2:40:11 PM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
8/21/2024 2:32:04 PM
|
Submission Triaged
|
8/21/2024 7:56:02 AM
|
Submission received from Applicant
|
7/17/2024 9:58:59 AM
|
Submission request sent to Applicant
|
7/9/2024 11:22:26 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/8/2024 4:02:22 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/27/2024 11:38:28 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/26/2024 10:54:44 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/26/2024 10:54:42 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/26/2024 10:54:40 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/26/2024 10:54:38 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
6/26/2024 10:54:36 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mike McCarthy on behalf of EPC Health Department
|
6/26/2024 10:54:34 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Catherine McGarvy on behalf of EPC Health Department
|
6/26/2024 10:54:32 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by HEAEH LandUse on behalf of EPC Health Department
|
6/26/2024 10:54:30 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Lori Seago on behalf of County Attorney - Development Review
|
6/26/2024 10:54:28 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Erika Keech on behalf of County Attorney - Development Review
|
6/26/2024 10:54:26 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by April Willie on behalf of County Attorney - Development Review
|
6/26/2024 10:40:02 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/26/2024 10:40:00 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
6/25/2024 9:39:45 AM
|
Submission Triaged
|
6/25/2024 9:10:14 AM
|
Submission received from Applicant
|
6/20/2024 10:51:44 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/19/2024 3:05:48 PM
|
Submission request sent to Applicant
|
6/13/2024 8:25:06 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/13/2024 8:25:04 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/13/2024 8:25:02 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/13/2024 8:25:00 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
6/13/2024 8:24:56 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Kari Parsons on behalf of PCD Project Manager
|
6/13/2024 8:24:52 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/13/2024 8:24:50 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
6/13/2024 8:20:01 AM
|
Submission Triaged
|
6/12/2024 12:28:52 PM
|
Submission received from Applicant
|
6/12/2024 8:10:56 AM
|
Submission request sent to Applicant
|
6/7/2024 12:19:49 PM
|
Submission request sent to Applicant
|
6/5/2024 4:44:11 PM
|
Submission request sent to Applicant
|
4/29/2024 1:34:14 PM
|
Submission request sent to Applicant
|
4/25/2024 8:41:22 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
4/18/2024 9:13:12 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/16/2024 1:53:07 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
4/16/2024 8:59:42 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/15/2024 4:20:40 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/15/2024 3:02:46 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/15/2024 1:06:04 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
4/11/2024 11:54:59 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
4/11/2024 9:15:09 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/5/2024 2:57:50 PM
|
Request for Review Comments returned by Falcon School District 49
|
4/4/2024 3:15:35 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/4/2024 9:27:24 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/3/2024 10:03:28 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by General Email on behalf of Mountain View Electric Association, Inc.
|
4/3/2024 10:03:26 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Evelyn galanephillips on behalf of Falcon School District 49
|
4/3/2024 10:03:24 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Trent Harwig on behalf of Falcon Fire Protection District
|
4/3/2024 10:03:22 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
4/3/2024 10:03:20 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Katie Miller on behalf of El Paso County Conservation Dist
|
4/3/2024 10:03:18 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
4/3/2024 10:03:16 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/3/2024 10:03:14 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/3/2024 10:03:12 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
4/3/2024 10:03:10 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
4/3/2024 10:03:08 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by on behalf of Pikes Peak Regional Building Department
|
4/3/2024 10:03:06 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/3/2024 10:03:04 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
4/3/2024 10:03:02 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/3/2024 10:03:00 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/3/2024 10:02:58 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Christina Prete on behalf of EPC Stormwater Review
|
4/3/2024 10:02:56 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Mike McCarthy on behalf of EPC Health Department
|
4/3/2024 10:02:54 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Catherine McGarvy on behalf of EPC Health Department
|
4/3/2024 10:02:52 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by HEAEH LandUse on behalf of EPC Health Department
|
4/3/2024 10:02:49 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Kari Parsons on behalf of PCD Project Manager
|
4/3/2024 10:02:46 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/3/2024 10:02:45 AM
|
Request for Review Comments email sent for Project Weisburg Landscape Maintenance East for review by Engineering Manager on behalf of PCD Engineering Division
|
4/1/2024 11:28:06 AM
|
Project Manager Assigned: Scott Weeks
|
3/29/2024 12:27:36 PM
|
Fees paid: 3/29/2024 (Receipt: 1008943)
|
3/29/2024 10:42:14 AM
|
Payment Request sent: 3/29/2024
|
3/29/2024 10:42:05 AM
|
File # Assigned: PPR2411
|
3/29/2024 10:41:46 AM
|
Submission Triaged
|
3/29/2024 4:43:47 AM
|
Submission received from Applicant
|
3/22/2024 9:06:30 AM
|
Submission request sent to Applicant
|
3/22/2024 9:05:18 AM
|
Submission request sent to Applicant
|
3/22/2024 8:49:52 AM
|
Submission request sent to Applicant
|
3/15/2024 1:42:47 PM
|
Submission request sent to Applicant
|
2/21/2024 11:33:03 AM
|
Project reopened for Review Comments
|
6/22/2023 12:00:00 AM
|
Project Closed
|
6/22/2023 12:00:00 AM
|
Project Expired one year after 06/22/2022 Submission Request 06/22/2023
|
6/22/2022 2:25:18 PM
|
Submission request sent to Applicant
|
6/22/2022 2:20:19 PM
|
Project Manager Assigned: Kylie Bagley
|
6/22/2022 2:20:19 PM
|
Project Created
|