| 10/24/2024 9:18:22 AM | Project Closed | 
                
                    | 10/24/2024 9:18:22 AM | Project Approved: 10/24/2024 | 
                
                    | 10/17/2024 5:14:45 PM | Project Ready for Approval requests.  Review Comment period is complete. | 
                
                    | 10/8/2024 1:29:44 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/2/2024 3:30:54 PM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/2/2024 3:30:52 PM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/2/2024 3:30:50 PM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/2/2024 3:30:01 PM | Submission Triaged | 
                
                    | 10/2/2024 3:16:05 PM | Submission received from Applicant | 
                
                    | 9/24/2024 5:00:50 PM | Submission request sent to Applicant | 
                
                    | 9/24/2024 8:50:33 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/11/2024 11:32:35 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 9/11/2024 11:32:33 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 9/11/2024 11:32:31 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 9/11/2024 11:31:02 AM | Submission Triaged | 
                
                    | 9/11/2024 10:59:36 AM | Submission received from Applicant | 
                
                    | 9/4/2024 3:31:20 PM | Submission request sent to Applicant | 
                
                    | 9/4/2024 3:05:21 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/29/2024 1:41:24 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/21/2024 9:31:58 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/21/2024 9:31:56 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 8/21/2024 9:31:54 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 8/21/2024 9:31:52 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/21/2024 9:31:50 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/21/2024 9:30:24 AM | Submission Triaged | 
                
                    | 8/21/2024 8:37:25 AM | Submission received from Applicant | 
                
                    | 8/8/2024 11:34:41 AM | Submission request sent to Applicant | 
                
                    | 8/8/2024 11:28:03 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/8/2024 9:23:13 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/1/2024 10:09:44 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/1/2024 10:09:41 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/1/2024 10:09:40 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Ethan Jacobs on behalf of PCD Engineering Division | 
                
                    | 8/1/2024 10:09:38 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/1/2024 10:04:35 AM | Submission Triaged | 
                
                    | 8/1/2024 9:34:01 AM | Submission received from Applicant | 
                
                    | 6/26/2024 7:33:03 AM | Submission request sent to Applicant | 
                
                    | 6/25/2024 9:51:40 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 6/25/2024 5:07:57 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/24/2024 4:52:56 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 6/11/2024 9:18:55 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:18:53 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:18:51 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:18:49 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:18:45 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 6/11/2024 9:18:42 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/11/2024 9:18:40 AM | Request for Review Comments email sent for Project The Shops Filing No. 2 at Meridian Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/7/2024 12:55:35 PM | Submission Triaged | 
                
                    | 6/4/2024 2:37:38 PM | Submission received from Applicant | 
                
                    | 4/26/2024 2:02:35 PM | Submission request sent to Applicant | 
                
                    | 4/26/2024 11:39:14 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 4/26/2024 10:56:31 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/25/2024 8:12:33 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 4/17/2024 3:10:25 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 4/16/2024 10:33:46 AM | Submission Triaged | 
                
                    | 4/15/2024 1:52:33 PM | Submission received from Applicant | 
                
                    | 4/15/2024 9:02:37 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review | 
                
                    | 4/15/2024 9:02:35 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 4/15/2024 9:02:33 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 4/15/2024 9:02:32 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 4/15/2024 9:02:29 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 4/15/2024 9:02:25 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 4/15/2024 9:02:23 AM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 4/15/2024 9:01:21 AM | Submission request sent to Applicant | 
                
                    | 4/15/2024 9:00:15 AM | Submission Triaged | 
                
                    | 4/12/2024 2:39:49 PM | Submission received from Applicant | 
                
                    | 3/2/2024 11:04:02 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 2/6/2024 8:31:05 AM | Submission request sent to Applicant | 
                
                    | 2/2/2024 3:26:33 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 2/2/2024 9:11:07 AM | Submission request sent to Applicant | 
                
                    | 2/1/2024 4:13:35 PM | Submission request sent to Applicant | 
                
                    | 2/1/2024 4:10:40 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 2/1/2024 3:09:44 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/29/2024 7:50:00 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 1/18/2024 2:57:14 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 1/18/2024 2:57:11 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 1/18/2024 2:57:09 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 1/18/2024 2:57:07 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 1/18/2024 2:57:05 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 1/18/2024 2:57:03 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 1/18/2024 2:57:01 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 1/18/2024 2:56:57 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/18/2024 2:56:55 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/12/2024 10:57:11 AM | Submission Triaged | 
                
                    | 1/11/2024 9:22:04 AM | Submission received from Applicant | 
                
                    | 11/15/2023 12:48:51 PM | Project Manager Assigned: Christian Haas | 
                
                    | 11/8/2023 2:17:33 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 11/7/2023 12:18:27 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 10/31/2023 3:25:21 PM | Submission request sent to Applicant | 
                
                    | 10/31/2023 3:19:01 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/30/2023 10:57:57 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 10/30/2023 7:52:55 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 10/30/2023 7:41:54 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/26/2023 2:11:28 PM | Request for Review Comments returned by Woodmen Road Metro | 
                
                    | 10/19/2023 2:03:16 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 10/9/2023 2:54:42 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Rebecca Hardekopf on behalf of Woodmen Road Metro | 
                
                    | 10/9/2023 2:54:40 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 10/9/2023 2:54:37 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist. | 
                
                    | 10/9/2023 2:54:35 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 10/9/2023 2:54:33 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 10/9/2023 2:54:31 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 10/9/2023 2:54:29 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 10/9/2023 2:54:25 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 10/9/2023 2:54:19 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 10/9/2023 2:54:12 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Lekishia Bellamy on behalf of PCD Project Manager | 
                
                    | 10/9/2023 2:54:00 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/9/2023 2:53:58 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/4/2023 1:03:36 PM | Submission Triaged | 
                
                    | 10/4/2023 11:17:06 AM | Submission received from Applicant | 
                
                    | 10/4/2023 10:23:37 AM | Submission request sent to Applicant | 
                
                    | 10/4/2023 10:22:59 AM | Submission Triaged | 
                
                    | 10/2/2023 1:27:41 PM | Submission received from Applicant | 
                
                    | 7/17/2023 8:16:44 AM | Submission request sent to Applicant | 
                
                    | 7/17/2023 8:14:13 AM | Submission request sent to Applicant | 
                
                    | 7/17/2023 8:09:01 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 7/13/2023 1:13:46 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 7/13/2023 7:16:44 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 7/10/2023 3:37:55 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 7/5/2023 10:22:51 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 6/29/2023 1:16:34 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 6/28/2023 10:47:36 AM | Project Manager Assigned: Lekishia Bellamy | 
                
                    | 6/20/2023 2:47:09 PM | Request for Review Comments returned by Woodmen Road Metro | 
                
                    | 6/15/2023 1:56:27 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Rebecca Hardekopf on behalf of Woodmen Road Metro | 
                
                    | 6/15/2023 1:56:26 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 6/15/2023 1:56:25 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist. | 
                
                    | 6/15/2023 1:56:24 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 6/15/2023 1:56:23 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 6/15/2023 1:56:21 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 6/15/2023 1:56:20 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 6/15/2023 1:56:19 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 6/15/2023 1:56:15 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 6/15/2023 1:56:10 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Kylie Bagley on behalf of PCD Project Manager | 
                
                    | 6/15/2023 1:56:09 PM | Request for Review Comments email sent for Project 11810 Stapleton Dr Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 6/13/2023 6:54:51 PM | Fees paid: 6/13/2023 (Receipt: 1008000) | 
                
                    | 6/13/2023 2:37:03 PM | Payment Request sent: 6/13/2023 | 
                
                    | 6/13/2023 2:37:03 PM | File # Assigned: PPR2322 | 
                
                    | 6/13/2023 2:36:59 PM | Submission Triaged | 
                
                    | 6/13/2023 2:34:43 PM | Submission received from Applicant | 
                
                    | 6/8/2023 10:31:22 AM | Submission request sent to Applicant | 
                
                    | 6/8/2023 10:31:14 AM | Submission Triaged | 
                
                    | 6/7/2023 1:23:36 PM | Submission received from Applicant | 
                
                    | 7/7/2022 3:50:06 PM | Submission request sent to Applicant | 
                
                    | 6/21/2022 3:18:07 PM | Project Manager Assigned: Kylie Bagley | 
                
                    | 6/21/2022 3:18:07 PM | EA Assigned: EA2290 | 
                
                    | 6/21/2022 3:18:07 PM | Project Created |