8/21/2023 4:55:47 PM
|
Project Closed
|
|
8/21/2023 4:55:47 PM
|
Project Approved: 8/21/2023
|
|
8/21/2023 10:23:05 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
8/21/2023 9:54:09 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
8/17/2023 10:47:05 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
8/17/2023 10:47:03 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
|
8/17/2023 10:47:02 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Engineering Manager on behalf of PCD Engineering Division
|
|
8/17/2023 10:46:14 AM
|
Submission Triaged
|
|
8/17/2023 10:04:27 AM
|
Submission received from Applicant
|
|
8/3/2023 1:21:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
8/1/2023 4:04:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
8/1/2023 3:29:51 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
7/25/2023 4:17:00 PM
|
Submission request sent to Applicant
|
|
7/24/2023 10:39:55 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
7/19/2023 4:16:30 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
7/19/2023 4:16:28 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
|
7/19/2023 4:16:26 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
7/19/2023 4:16:24 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
7/19/2023 4:14:52 PM
|
Submission Triaged
|
|
7/19/2023 7:18:49 AM
|
Submission received from Applicant
|
|
7/10/2023 7:21:13 AM
|
Submission request sent to Applicant
|
|
7/10/2023 7:19:43 AM
|
Project reopened for Review Comments
|
|
6/13/2023 4:15:58 PM
|
Submission request sent to Applicant
|
|
1/4/2023 7:12:27 AM
|
Project Closed
|
|
1/4/2023 7:12:27 AM
|
Project Approved: 1/4/2023
|
|
12/19/2022 3:19:17 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
12/13/2022 9:37:44 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
12/12/2022 12:05:35 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
12/12/2022 12:05:25 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
12/12/2022 12:04:45 PM
|
Submission Triaged
|
|
12/12/2022 11:18:22 AM
|
Submission received from Applicant
|
|
12/6/2022 3:27:41 PM
|
Submission request sent to Applicant
|
|
12/5/2022 4:13:04 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
12/5/2022 7:50:22 AM
|
Submission request sent to Applicant
|
|
12/1/2022 4:49:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
12/1/2022 7:33:30 AM
|
Submission request sent to Applicant
|
|
11/30/2022 12:40:30 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
11/21/2022 9:30:14 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
|
11/16/2022 12:06:56 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by on behalf of PCD Administrative Notice
|
|
11/15/2022 8:10:10 AM
|
Submission Triaged
|
|
11/15/2022 7:59:05 AM
|
Submission received from Applicant
|
|
11/15/2022 7:50:23 AM
|
Submission request sent to Applicant
|
|
11/14/2022 8:33:29 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
11/14/2022 8:33:28 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
11/14/2022 8:33:26 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
11/14/2022 8:31:43 AM
|
Submission Triaged
|
|
11/11/2022 10:44:35 AM
|
Submission received from Applicant
|
|
10/18/2022 11:55:36 AM
|
Submission request sent to Applicant
|
|
10/18/2022 11:51:01 AM
|
Submission request sent to Applicant
|
|
10/18/2022 11:50:01 AM
|
Submission request sent to Applicant
|
|
10/18/2022 7:26:18 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
10/13/2022 3:41:33 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
9/22/2022 5:27:57 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
9/19/2022 9:04:14 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
9/19/2022 9:04:13 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
9/19/2022 9:04:11 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
9/19/2022 9:02:42 AM
|
Submission Triaged
|
|
9/16/2022 12:46:26 PM
|
Submission received from Applicant
|
|
9/7/2022 7:24:35 AM
|
Submission request sent to Applicant
|
|
8/15/2022 4:00:24 PM
|
Submission request sent to Applicant
|
|
8/15/2022 3:58:54 PM
|
Submission request sent to Applicant
|
|
8/15/2022 1:02:42 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
8/13/2022 1:45:09 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
8/10/2022 6:38:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
8/9/2022 8:30:21 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
7/16/2022 2:22:39 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
7/16/2022 2:22:36 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
|
7/16/2022 2:22:33 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
7/16/2022 2:22:32 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
7/16/2022 2:20:18 PM
|
Submission Triaged
|
|
7/15/2022 1:06:40 PM
|
Submission received from Applicant
|
|
6/28/2022 10:17:16 PM
|
Request for Review Comments returned by EPC Health Department
|
|
6/9/2022 12:44:14 PM
|
Request for Review Comments returned by Parks Advisory Board
|
|
6/7/2022 8:27:56 AM
|
Submission request sent to Applicant
|
|
6/7/2022 8:25:57 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
6/7/2022 8:02:30 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
6/6/2022 1:00:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
6/3/2022 2:26:05 PM
|
Request for Review Comments returned by US Postal Service
|
|
6/3/2022 9:26:28 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
|
6/2/2022 7:31:01 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
|
6/2/2022 12:00:59 PM
|
Request for Review Comments returned by EPC Parks Department
|
|
5/31/2022 3:44:54 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
5/31/2022 2:26:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
5/31/2022 9:47:45 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
|
5/26/2022 9:12:48 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
|
5/22/2022 11:40:15 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
|
5/18/2022 4:11:09 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
5/16/2022 7:00:58 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
|
5/12/2022 2:14:12 PM
|
Request for Review Comments returned by EPC Environmental Services
|
|
5/12/2022 8:46:27 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
5/11/2022 8:41:13 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
|
5/11/2022 7:42:10 AM
|
Request for Review Comments returned by RBD Floodplain
|
|
5/10/2022 3:38:45 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Susan Davies on behalf of Trails and Open Space Coalition
|
|
5/10/2022 3:38:43 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
|
5/10/2022 3:38:42 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
|
5/10/2022 3:38:41 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
|
5/10/2022 3:38:40 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
|
5/10/2022 3:38:39 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Melissa Andrews on behalf of Falcon School District 49
|
|
5/10/2022 3:38:38 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
|
5/10/2022 3:38:37 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
|
5/10/2022 3:38:34 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
|
5/10/2022 3:38:32 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
5/10/2022 3:38:31 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
|
5/10/2022 3:38:30 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Pamela Davidson on behalf of Central CO Conservation District
|
|
5/10/2022 3:38:28 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
|
5/10/2022 3:38:27 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
|
5/10/2022 3:38:26 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
|
5/10/2022 3:38:24 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
|
5/10/2022 3:38:23 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
|
5/10/2022 3:38:22 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
|
5/10/2022 3:38:20 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Keith Curtis on behalf of RBD Floodplain
|
|
5/10/2022 3:38:19 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
|
5/10/2022 3:38:18 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
5/10/2022 3:38:17 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Rita Otega on behalf of US Postal Service
|
|
5/10/2022 3:38:16 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
5/10/2022 3:38:15 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
|
5/10/2022 3:38:14 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
|
5/10/2022 3:38:08 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
5/10/2022 3:38:06 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by John Hunyadi on behalf of Colorado Dam Safety Division
|
|
5/10/2022 3:38:04 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by on behalf of Parks Advisory Board
|
|
5/10/2022 3:38:03 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
5/10/2022 3:37:59 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Bill Elder on behalf of EPC Sheriff's Department
|
|
5/10/2022 3:37:58 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Bill Elder on behalf of EPC Sheriff's Department
|
|
5/10/2022 3:37:57 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
|
5/10/2022 3:37:56 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by on behalf of EPC Parks Department
|
|
5/10/2022 3:37:55 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Catherine McGarvy on behalf of EPC Health Department
|
|
5/10/2022 3:37:52 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
5/10/2022 3:37:51 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
|
5/10/2022 3:37:48 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Kari Parsons on behalf of PCD Project Manager
|
|
5/10/2022 3:37:47 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
5/10/2022 3:09:53 PM
|
Fees paid: 5/10/2022 (Receipt: 1006296)
|
|
5/10/2022 2:27:04 PM
|
Payment Request sent: 5/10/2022
|
|
5/10/2022 2:27:04 PM
|
File # Assigned: SF2218
|
|
5/10/2022 2:27:01 PM
|
Submission Triaged
|
|
5/9/2022 6:28:52 PM
|
Submission received from Applicant
|
|
4/1/2022 12:16:29 PM
|
Submission request sent to Applicant
|
|
3/31/2022 3:48:11 PM
|
Submission request sent to Applicant
|
|
3/31/2022 3:45:34 PM
|
Project Manager Assigned: Kari Parsons
|
|
3/31/2022 3:45:34 PM
|
EA Assigned: EA21159
|
|
3/31/2022 3:45:34 PM
|
Project Created
|