Project Details

Search


File Number
SKP236
Project Name
Mayberry Sketch Plan
Description
Amendment to Existing Ellicott Town Center Sketch Plan (SKP05005).
Parcels
3400000456 3400000456 3400000460 3400000460 3400000472 3400000472 3400000474 3400000474 3400000476 3400000476 3400000477 3400000477 3400000478 3400000478 3400000479 3400000479 3400000480 3400000480 3400000495 3400000495 3414107001 3414107001 3414107002 3414107002 3414201024 3414201024 3414205001 3414205001 3414217001 3414217001
Applicant
Mayberry Communities
Director Of Development Scott Souders ( scottsouders@mayberrycoloradosprings.com )
(719) 922-2181
Director Of Development Scott Souders ( scottsouders@mayberrycoloradosprings.com )
(719) 922-2181
File Prefix
SKP - Sketch Plan
Year
2023
Project Manager
Ryan Howser
Status
Closed
Created
2/24/2022 11:25:18 AM

View: Review Comments


Approved Documents (3)

Link Document
View Sketch Plan Drawing(s)
View Traffic Impact Study
View Master Development Drainage Plan (MDDP)


Additional Documents (19)

Link Document Comment
View USF&W clearance
View PC Hearing Agenda Hearing Agenda for the Planning Commission hearing on 04/17/2025. JM
View Hearing Notice & Vicinity Map Hearing Notice for the Planning Commission hearing on 04/17/2025 and the Board of County Commissioners hearing on 05/08/2025. JM
View Mailing Labels - Hearing Notice Mailing Labels for the 104 surrounding property owners that received notices. PCD mailed the letters on 04/01/2025. Cost = $71.76. JM
View Selected Range - Hearing Notice Selected Range was 500 feet. JM
View PC & BOCC Poster Poster for the Planning Commission hearing on 04/17/2025 and the Board of County Commissioners hearing on 05/08/2025. JM
View Affidavit for Posters on Property
View Posters on Property
View Returned Notice - 4/7/2025
View Returned Notice - 4/9/2025
View PC Staff Report - final with attachments Staff Report for the Planning Commission hearing on 04/17/2025. JM
View Returned Notice - 4/15/2025
View Returned Notice - 4/15/2025
View Signed PC Resolution Recommendation from the Planning Commission hearing on 04/17/2025. JM
View BOCC Staff Report - final with attachments Staff Report for the Board of County Commissioners hearing on 05/08/2025. JM
View BOCC Hearing Agenda Hearing Agenda for the Board of County Commissioners hearing on 05/08/2025. JM
View Recorded BOCC Resolution SKP236 RECORDED BOCC RESOLUTION 25-136
View Adopted PC Minutes Adopted Minutes from the Planning Commission hearing on 04/17/2025. JM
View PC Staff Report - final with attachments Staff Report for the Planning Commission hearing on 06/19/2025. JM


Review Documents (22)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 10/10/2023 2:37:47 PM
View Application/Petition Form 10/10/2023 8:07:33 AM
View Legal Description (MS WORD Version required) 10/10/2023 8:08:50 AM
View Letter of Intent 2/1/2025 1:55:39 PM
View Title Commitment (Current within 30 days of submittal) 10/10/2023 8:09:59 AM
View Vicinity/Location Map 10/10/2023 8:10:54 AM
View Colorado Geological Survey Receipt 10/10/2023 8:07:34 AM
View Mineral Rights Certification 10/10/2023 8:08:55 AM
View Phasing Plan - Can be included in plan if applicable 10/10/2023 8:09:58 AM
View Sketch Plan Drawing(s) 4/18/2025 2:08:40 PM
View Soils & Geology Report 10/10/2023 8:07:34 AM
View Subdivision Summary Sheet 10/10/2023 8:09:58 AM
View Traffic Impact Study 3/21/2025 8:55:15 AM
View Wastewater Disposal Report 10/10/2023 8:10:54 AM
View Water Resources Report 10/10/2023 8:10:55 AM
View Water Supply Information Summary 9/16/2024 3:30:38 PM
View EUC Water Services Map 9/16/2024 3:46:52 PM
View Impact Identification Statement 2/1/2025 1:55:38 PM
View Master Development Drainage Plan (MDDP) 3/21/2025 8:55:12 AM
View MDDP Comment Responses 2/1/2025 2:08:33 PM
View Overall Comment Response Letter 2/1/2025 2:08:37 PM
View Updated Water Supply Report 9/16/2024 3:46:53 PM



Events (157)

Date Comment
5/9/2025 2:24:28 PM Project Closed
5/9/2025 2:24:28 PM Project Approved: 5/9/2025
4/30/2025 5:24:39 PM Project Ready for Approval requests. Review Comment period is complete.
4/30/2025 2:14:32 PM Request for Review Comments returned by PCD Project Manager
4/17/2025 1:21:51 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
4/15/2025 8:31:32 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
4/15/2025 8:31:11 AM Submission Triaged
4/14/2025 8:25:43 AM Submission received from Applicant
4/11/2025 2:31:02 PM Fees paid: 4/11/2025 (Receipt: 1010409)
4/4/2025 11:01:11 AM Submission request sent to Applicant
4/4/2025 11:00:30 AM Request for Review Comments returned by PCD Project Manager
4/3/2025 3:25:07 PM Payment Request sent: 4/3/2025
4/3/2025 1:24:41 PM Request for Review Comments returned by Colorado Geological Survey
3/26/2025 9:48:33 PM Request for Review Comments returned by PCD Engineering Division
3/21/2025 9:05:52 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
3/21/2025 9:05:51 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
3/21/2025 9:05:50 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
3/21/2025 9:05:49 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
3/21/2025 9:05:47 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
3/21/2025 9:05:46 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
3/21/2025 9:05:45 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
3/21/2025 9:04:16 AM Submission Triaged
3/21/2025 8:55:48 AM Submission received from Applicant
3/20/2025 10:38:33 AM Submission request sent to Applicant
3/20/2025 10:37:49 AM Request for Review Comments returned by PCD Project Manager
3/20/2025 8:42:45 AM Request for Review Comments returned by PCD Engineering Division
3/18/2025 2:13:19 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/17/2025 12:58:51 PM Request for Review Comments returned by Colorado Geological Survey
3/12/2025 3:28:59 PM Request for Review Comments returned by EPC Parks Department
3/10/2025 6:22:56 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
3/7/2025 4:14:18 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
3/7/2025 4:14:17 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
3/7/2025 4:14:16 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
3/7/2025 4:14:15 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
3/7/2025 4:14:14 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
3/7/2025 4:14:13 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
3/7/2025 4:14:12 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of EPC Parks Department
3/7/2025 4:14:09 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
3/7/2025 4:14:08 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
3/7/2025 4:14:07 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
3/7/2025 4:10:08 PM Submission Triaged
3/7/2025 3:02:39 PM Submission received from Applicant
2/26/2025 10:31:16 AM Request for Review Comments returned by EPC Parks Department
2/21/2025 2:47:13 PM Submission request sent to Applicant
2/21/2025 11:53:50 AM Request for Review Comments returned by PCD Engineering Division
2/18/2025 11:31:13 AM Request for Review Comments returned by PCD Project Manager
2/18/2025 9:37:28 AM Request for Review Comments returned by EPC Stormwater Review
2/4/2025 8:47:02 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/4/2025 8:26:52 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/4/2025 8:26:51 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
2/4/2025 8:26:50 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/4/2025 8:26:49 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
2/4/2025 8:26:48 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
2/4/2025 8:26:47 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of EPC Parks Department
2/4/2025 8:26:44 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
2/4/2025 8:26:43 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
2/4/2025 8:26:41 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
2/4/2025 8:19:00 AM Submission Triaged
2/1/2025 2:11:42 PM Submission received from Applicant
11/4/2024 6:04:49 AM Request for Review Comments returned by EPC Parks Department
11/1/2024 1:45:09 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/26/2024 9:42:40 AM Request for Review Comments returned by EPC Health Department
10/10/2024 7:09:35 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
10/10/2024 7:09:33 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
10/10/2024 7:09:31 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
10/10/2024 7:09:29 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/10/2024 7:08:45 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of EPC Parks Department
10/9/2024 7:55:30 AM Submission request sent to Applicant
10/8/2024 11:51:19 PM Request for Review Comments returned by PCD Engineering Division
10/8/2024 5:13:00 PM Request for Review Comments returned by PCD Project Manager
10/7/2024 12:11:40 PM Request for Review Comments returned by EPC Stormwater Review
9/17/2024 1:21:34 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
9/17/2024 8:24:34 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Chris Smith on behalf of Ellicott SD 22
9/17/2024 8:24:32 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Michael Henley on behalf of Ellicott Fire Protection District
9/17/2024 8:24:30 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Norma Houghton on behalf of Ellicott Fire Protection District
9/17/2024 8:24:28 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
9/17/2024 8:24:26 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
9/17/2024 8:24:24 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
9/17/2024 8:24:22 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
9/17/2024 8:24:20 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
9/17/2024 8:24:18 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Mike McCarthy on behalf of EPC Health Department
9/17/2024 8:24:16 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
9/17/2024 8:24:14 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by HEAEH LandUse on behalf of EPC Health Department
9/17/2024 8:24:12 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Lori Seago on behalf of County Attorney - Water
9/17/2024 8:24:10 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Erika Keech on behalf of County Attorney - Water
9/17/2024 8:24:08 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by April Willie on behalf of County Attorney - Water
9/17/2024 8:24:05 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
9/17/2024 8:24:01 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
9/17/2024 8:23:59 AM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
9/17/2024 8:17:47 AM Submission Triaged
9/16/2024 3:47:06 PM Submission received from Applicant
1/3/2024 12:33:27 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
12/20/2023 10:27:45 AM Request for Review Comments returned by Parks Advisory Board
12/20/2023 10:15:51 AM Request for Review Comments email resent for Project Mayberry Sketch Plan for review by on behalf of Parks Advisory Board
12/15/2023 7:47:19 AM Request for Review Comments returned by Parks Advisory Board
12/14/2023 10:37:20 AM Request for Review Comments returned by Colorado Division of Water Resources
12/12/2023 11:39:45 AM Request for Review Comments email resent for Project Mayberry Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
12/5/2023 4:53:45 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
11/15/2023 4:31:47 PM Submission request sent to Applicant
11/15/2023 2:53:10 PM Request for Review Comments returned by EPC Stormwater Review
11/14/2023 6:03:10 PM Request for Review Comments returned by PCD Engineering Division
11/9/2023 12:12:21 PM Request for Review Comments returned by PCD Project Manager
11/9/2023 9:55:02 AM Request for Review Comments returned by EPC Parks Department
11/2/2023 1:27:40 PM Request for Review Comments returned by Colorado Geological Survey
11/2/2023 11:34:23 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
11/2/2023 9:55:42 AM Request for Review Comments returned by Pikes Peak Regional Building Department
10/31/2023 11:53:20 AM Request for Review Comments returned by Colorado Parks and Wildlife
10/30/2023 9:45:20 AM Request for Review Comments returned by County Attorney - Water
10/26/2023 6:32:30 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/25/2023 9:26:36 PM Request for Review Comments returned by County Attorney - Development Review
10/25/2023 3:38:09 PM Request for Review Comments email resent for Project Mayberry Sketch Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/25/2023 11:07:12 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/24/2023 4:30:50 PM Request for Review Comments returned by Colorado Division of Water Resources
10/17/2023 12:56:23 PM Request for Review Comments returned by EPC Environmental Services
10/16/2023 4:16:36 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/16/2023 2:12:11 PM Request for Review Comments returned by Schriever AFB
10/12/2023 2:41:55 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Darren Horstmeier on behalf of Schriever AFB
10/12/2023 2:41:53 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
10/12/2023 2:41:51 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Chris Smith on behalf of Ellicott SD 22
10/12/2023 2:41:49 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Bookkeeper Peggy Current on behalf of Ellicott Metro
10/12/2023 2:41:47 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Michael Henley on behalf of Ellicott Fire Protection District
10/12/2023 2:41:44 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
10/12/2023 2:41:42 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
10/12/2023 2:41:40 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
10/12/2023 2:41:38 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/12/2023 2:41:35 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/12/2023 2:41:33 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
10/12/2023 2:41:31 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
10/12/2023 2:41:29 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
10/12/2023 2:41:27 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
10/12/2023 2:41:25 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/12/2023 2:41:22 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of Colorado Department of Public Health and Environment
10/12/2023 2:41:20 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of Parks Advisory Board
10/12/2023 2:41:18 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/12/2023 2:41:16 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
10/12/2023 2:41:14 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
10/12/2023 2:41:12 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by County Engineer on behalf of EPC Public Works, County Engineer
10/12/2023 2:41:10 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by County Engineer on behalf of EPC Public Works, County Engineer
10/12/2023 2:41:07 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by on behalf of EPC Parks Department
10/12/2023 2:41:05 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
10/12/2023 2:40:59 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
10/12/2023 2:40:56 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by April Willie on behalf of County Attorney - Water
10/12/2023 2:40:54 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review
10/12/2023 2:40:52 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Ryan Howser on behalf of PCD Project Manager
10/12/2023 2:40:50 PM Request for Review Comments email sent for Project Mayberry Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
10/12/2023 11:53:31 AM Fees paid: 10/12/2023 (Receipt: 1008422)
10/10/2023 2:58:24 PM Payment Request sent: 10/10/2023
10/10/2023 2:58:07 PM File # Assigned: SKP236
10/10/2023 2:56:32 PM Submission Triaged
10/10/2023 2:37:56 PM Submission received from Applicant
9/14/2023 4:04:34 PM Submission request sent to Applicant
9/14/2023 4:04:12 PM Project reopened for Review Comments
5/19/2023 12:00:00 AM Project Closed
5/19/2023 12:00:00 AM Project Expired one year after 05/19/2022 Submission Request 05/19/2023
5/19/2022 8:10:09 AM Submission request sent to Applicant
2/24/2022 11:25:33 AM Project Manager Assigned: Ryan Howser
2/24/2022 11:25:33 AM Project Created