8/5/2025 12:56:43 PM
|
Project Closed
|
8/5/2025 12:56:43 PM
|
Project Approved: 8/5/2025
|
7/16/2025 10:34:01 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
7/8/2025 9:20:15 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/27/2025 11:43:45 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
6/27/2025 11:43:43 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Richard Davis on behalf of Security Water District
|
6/27/2025 11:43:42 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Dian White on behalf of Security Water District
|
6/27/2025 11:43:41 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Roy Heald on behalf of Security Water & Sanitation District
|
6/27/2025 11:43:40 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Dian Sukalski on behalf of Security Water & Sanitation District
|
6/27/2025 11:43:39 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by brandon bernard on behalf of Security Water & Sanitation District
|
6/27/2025 11:43:38 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Jay Adriansen on behalf of Security Sanitation District
|
6/27/2025 11:43:37 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Gary Steen on behalf of Fountain Mutual Irrigation Company
|
6/27/2025 11:43:35 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
6/27/2025 11:43:34 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
6/27/2025 11:43:33 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
6/27/2025 11:43:32 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
6/27/2025 11:43:31 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
6/27/2025 11:43:30 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
6/27/2025 11:43:29 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
6/27/2025 11:41:26 AM
|
Submission Triaged
|
6/27/2025 10:14:59 AM
|
Submission received from Applicant
|
6/26/2025 2:45:54 PM
|
Submission request sent to Applicant
|
6/26/2025 2:45:42 PM
|
Submission Triaged
|
6/26/2025 2:34:48 PM
|
Submission received from Applicant
|
5/22/2025 3:25:33 PM
|
Project Manager Assigned: Ryan Howser
|
5/2/2025 10:30:36 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/1/2025 2:06:34 PM
|
Submission request sent to Applicant
|
4/28/2025 8:03:35 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/28/2025 8:03:34 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
4/28/2025 8:03:33 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
4/28/2025 8:02:41 AM
|
Submission Triaged
|
4/28/2025 6:31:27 AM
|
Submission received from Applicant
|
4/10/2025 7:39:25 AM
|
Submission request sent to Applicant
|
3/26/2025 9:57:41 AM
|
Submission request sent to Applicant
|
3/26/2025 9:56:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/25/2025 5:36:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/24/2025 8:45:21 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/19/2025 8:56:08 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/11/2025 3:47:34 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/11/2025 3:47:33 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/11/2025 3:47:32 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
3/11/2025 3:47:30 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
3/11/2025 3:47:29 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
3/11/2025 3:47:28 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
3/11/2025 3:47:27 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
3/11/2025 3:47:25 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/11/2025 3:47:24 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
3/11/2025 3:46:14 PM
|
Submission Triaged
|
3/11/2025 2:45:42 PM
|
Submission received from Applicant
|
1/21/2025 3:45:40 PM
|
Submission request sent to Applicant
|
10/17/2024 11:10:44 AM
|
Submission request sent to Applicant
|
10/17/2024 11:10:20 AM
|
Project reopened for Review Comments
|
10/7/2024 8:03:38 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
9/10/2024 1:16:52 PM
|
Project reopened for Approval requests
|
9/5/2024 1:44:29 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by on behalf of PCD Administrative Notice
|
9/5/2024 1:44:28 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Miranda Benson on behalf of PCD Administrative Notice
|
8/30/2024 12:55:05 PM
|
Project Closed
|
8/30/2024 12:55:05 PM
|
Project Approved: 8/30/2024
|
8/30/2024 12:54:56 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
8/28/2024 1:39:43 PM
|
Submission request canceled
|
8/28/2024 12:06:39 PM
|
Submission request sent to Applicant
|
8/27/2024 1:30:14 PM
|
Submission request sent to Applicant
|
8/27/2024 1:28:53 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/21/2024 2:13:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/21/2024 1:12:19 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
8/21/2024 1:12:17 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
8/21/2024 1:12:15 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
8/21/2024 1:11:33 PM
|
Submission Triaged
|
8/21/2024 11:35:48 AM
|
Submission received from Applicant
|
8/21/2024 10:37:00 AM
|
Submission request sent to Applicant
|
8/21/2024 10:36:21 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/20/2024 5:19:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/15/2024 11:07:02 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/14/2024 1:26:37 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
8/14/2024 1:26:35 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/14/2024 1:26:33 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/14/2024 1:26:31 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
8/14/2024 1:26:30 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
8/14/2024 1:26:28 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
8/14/2024 1:26:26 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
8/14/2024 1:26:24 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
8/14/2024 1:26:20 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/14/2024 1:26:18 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
8/14/2024 1:24:35 PM
|
Submission Triaged
|
8/14/2024 10:10:47 AM
|
Submission received from Applicant
|
8/14/2024 8:30:38 AM
|
Submission request sent to Applicant
|
8/14/2024 8:10:04 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/13/2024 8:25:56 AM
|
Submission request sent to Applicant
|
8/13/2024 8:20:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/13/2024 7:48:18 AM
|
Request for Review Comments returned by PCD Engineering Division
|
8/13/2024 7:44:27 AM
|
Request for Review Comments email resent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
8/12/2024 10:58:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/12/2024 4:35:47 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/12/2024 10:24:19 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
8/12/2024 10:24:18 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
8/12/2024 10:24:16 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
7/29/2024 3:28:07 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
7/29/2024 3:28:05 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/29/2024 3:28:03 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/29/2024 3:28:02 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
7/29/2024 3:27:59 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
7/29/2024 3:27:54 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/29/2024 3:27:52 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
7/29/2024 3:25:54 PM
|
Submission Triaged
|
7/29/2024 1:30:13 PM
|
Submission received from Applicant
|
7/11/2024 2:42:55 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/27/2024 2:47:26 PM
|
Submission request sent to Applicant
|
6/26/2024 10:34:46 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/26/2024 2:05:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/26/2024 1:31:35 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
6/26/2024 1:31:33 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
6/26/2024 1:31:31 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
6/25/2024 4:52:06 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/18/2024 12:50:42 PM
|
Request for Review Comments returned by County Attorney - Water
|
6/11/2024 1:30:21 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/11/2024 1:30:19 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/11/2024 1:30:17 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/11/2024 1:30:16 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
6/11/2024 1:30:14 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
6/11/2024 1:30:12 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
6/11/2024 1:30:10 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by April Willie on behalf of County Attorney - Water
|
6/11/2024 1:30:08 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
6/11/2024 1:30:04 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/11/2024 1:30:02 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
6/11/2024 1:25:34 PM
|
Submission Triaged
|
6/11/2024 1:05:21 PM
|
Submission received from Applicant
|
12/6/2023 3:55:27 PM
|
Request for Review Comments returned by Security Fire Protection District
|
12/1/2023 1:43:47 PM
|
Request for Review Comments returned by EPC Health Department
|
11/28/2023 8:44:39 AM
|
Submission request sent to Applicant
|
11/9/2023 3:36:44 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/9/2023 1:08:47 PM
|
Request for Review Comments returned by Widefield SD 3
|
11/6/2023 3:28:31 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
10/19/2023 4:09:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/18/2023 3:33:06 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
10/16/2023 5:10:58 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/16/2023 9:29:55 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/13/2023 3:03:22 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/13/2023 10:34:12 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/12/2023 8:45:15 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/11/2023 3:27:15 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/9/2023 9:06:45 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/3/2023 2:59:25 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/27/2023 1:50:57 PM
|
Request for Review Comments returned by EPC Environmental Services
|
9/26/2023 3:31:21 PM
|
Request for Review Comments returned by EPC Parks Department
|
9/26/2023 1:05:19 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
9/26/2023 1:05:18 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Edi Anderson on behalf of County Attorney - Water
|
9/26/2023 1:03:40 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
9/26/2023 1:03:39 PM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
9/26/2023 12:03:23 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/25/2023 12:09:15 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/22/2023 11:08:50 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by COO Dave Gish on behalf of Widefield SD 3
|
9/22/2023 11:08:49 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Richard Davis on behalf of Security Water District
|
9/22/2023 11:08:48 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Dian Sukalski on behalf of Security Water & Sanitation District
|
9/22/2023 11:08:47 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Jay Adriansen on behalf of Security Sanitation District
|
9/22/2023 11:08:46 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Alex Martin on behalf of Security Fire Protection District
|
9/22/2023 11:08:45 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
9/22/2023 11:08:44 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/22/2023 11:08:43 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/22/2023 11:08:41 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
9/22/2023 11:08:40 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
|
9/22/2023 11:08:39 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/22/2023 11:08:38 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/22/2023 11:08:37 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/22/2023 11:08:36 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by on behalf of Parks Advisory Board
|
9/22/2023 11:08:35 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/22/2023 11:08:31 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by on behalf of EPC Parks Department
|
9/22/2023 11:08:30 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
9/22/2023 11:08:28 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/22/2023 11:08:26 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
9/22/2023 11:08:23 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Ashlyn Mathy on behalf of PCD Project Manager
|
9/22/2023 11:08:22 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
9/22/2023 11:08:21 AM
|
Request for Review Comments email sent for Project Haven Valley Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
9/21/2023 1:41:09 PM
|
Fees paid: 9/21/2023 (Receipt: 1008331)
|
9/21/2023 12:04:14 PM
|
Project Manager Assigned: Ashlyn Mathy
|
9/21/2023 11:54:54 AM
|
Payment Request sent: 9/21/2023
|
9/21/2023 11:54:54 AM
|
File # Assigned: SF2323
|
9/21/2023 11:54:51 AM
|
Submission Triaged
|
9/21/2023 10:12:44 AM
|
Submission received from Applicant
|
3/30/2023 10:53:54 AM
|
Submission request sent to Applicant
|
3/30/2023 10:42:50 AM
|
Submission request sent to Applicant
|
3/30/2023 10:41:27 AM
|
Project Manager Assigned: Kari Parsons
|
2/22/2022 4:18:04 PM
|
Submission request sent to Applicant
|
2/22/2022 4:13:51 PM
|
Project Manager Assigned: John Green
|
2/22/2022 4:13:51 PM
|
EA Assigned: EA20157
|
2/22/2022 4:13:51 PM
|
Project Created
|