2/15/2024 2:21:03 PM
|
Project Closed
|
2/15/2024 2:21:03 PM
|
Project Approved: 2/15/2024
|
2/15/2024 2:00:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/29/2024 9:25:35 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/22/2024 8:11:24 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/22/2024 7:13:02 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
1/22/2024 7:13:00 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
1/22/2024 7:11:17 AM
|
Submission Triaged
|
1/19/2024 9:06:00 AM
|
Submission received from Applicant
|
1/18/2024 4:29:22 PM
|
Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
1/18/2024 4:27:51 PM
|
Submission request sent to Applicant
|
1/18/2024 4:12:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/8/2024 10:01:24 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/3/2024 9:53:52 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
1/3/2024 9:53:50 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
1/3/2024 9:53:48 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/3/2024 9:53:46 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
1/3/2024 9:51:49 AM
|
Submission Triaged
|
1/3/2024 9:45:36 AM
|
Submission received from Applicant
|
1/2/2024 2:08:35 PM
|
Submission request sent to Applicant
|
1/2/2024 1:59:50 PM
|
Submission request sent to Applicant
|
1/2/2024 1:59:34 PM
|
Submission Triaged
|
1/2/2024 10:52:59 AM
|
Submission received from Applicant
|
1/2/2024 10:28:33 AM
|
Submission request sent to Applicant
|
1/2/2024 9:19:57 AM
|
Submission request sent to Applicant
|
12/28/2023 1:45:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/26/2023 9:05:57 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/11/2023 3:21:11 PM
|
Project reopened for Review Comments
|
12/11/2023 3:14:11 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
12/11/2023 3:14:09 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
12/11/2023 3:14:06 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lupe Packman on behalf of PCD Engineering Division
|
12/11/2023 3:14:04 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/11/2023 3:14:02 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/11/2023 3:14:00 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Edward Schoenheit on behalf of PCD Engineering Division
|
12/11/2023 3:13:58 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
12/11/2023 3:13:56 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Charlene Durham on behalf of PCD Engineering Division
|
12/11/2023 3:13:54 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
12/11/2023 3:10:38 PM
|
Submission Triaged
|
12/11/2023 1:31:45 PM
|
Submission received from Applicant
|
12/11/2023 12:35:01 PM
|
Submission request sent to Applicant
|
11/27/2023 7:48:41 AM
|
Submission request sent to Applicant
|
8/25/2022 3:14:23 PM
|
Project Closed
|
8/25/2022 3:14:23 PM
|
Project Approved: 8/25/2022
|
8/25/2022 3:09:56 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
8/23/2022 1:43:34 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
|
8/23/2022 1:37:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/15/2022 4:02:10 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/4/2022 5:01:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/3/2022 1:47:37 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/3/2022 1:46:54 PM
|
Submission Triaged
|
8/3/2022 1:29:22 PM
|
Submission received from Applicant
|
8/2/2022 5:43:45 PM
|
Submission request sent to Applicant
|
8/2/2022 6:55:34 AM
|
Submission request sent to Applicant
|
7/28/2022 10:02:39 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/28/2022 9:44:09 AM
|
Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/28/2022 8:02:48 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/26/2022 11:18:57 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/16/2022 2:14:55 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
7/16/2022 2:14:52 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
7/16/2022 2:14:50 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/16/2022 2:12:40 PM
|
Submission Triaged
|
7/15/2022 7:58:54 AM
|
Submission received from Applicant
|
7/7/2022 11:48:19 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/6/2022 2:28:11 PM
|
Submission request sent to Applicant
|
7/6/2022 2:25:23 PM
|
Submission request sent to Applicant
|
7/6/2022 2:24:49 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/22/2022 10:37:31 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
6/22/2022 10:37:28 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
6/22/2022 10:35:23 AM
|
Submission Triaged
|
6/22/2022 10:13:59 AM
|
Submission received from Applicant
|
6/6/2022 1:39:50 PM
|
Submission request sent to Applicant
|
6/1/2022 3:53:52 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/31/2022 10:07:31 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/25/2022 12:06:59 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/10/2022 12:15:06 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/4/2022 7:44:58 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/4/2022 7:44:56 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
5/4/2022 7:44:54 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/4/2022 7:42:54 AM
|
Submission Triaged
|
5/4/2022 7:37:57 AM
|
Submission received from Applicant
|
4/25/2022 3:14:55 PM
|
Submission request sent to Applicant
|
4/25/2022 3:08:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/25/2022 2:49:25 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/25/2022 2:34:38 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
|
4/25/2022 2:30:09 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
|
4/25/2022 1:58:15 PM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/25/2022 1:56:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/25/2022 1:54:01 PM
|
Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
4/25/2022 1:52:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/31/2022 7:32:48 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/31/2022 7:32:47 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
3/31/2022 7:32:44 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/31/2022 7:30:27 AM
|
Submission Triaged
|
3/31/2022 7:11:32 AM
|
Submission received from Applicant
|
3/1/2022 9:33:09 AM
|
Submission request sent to Applicant
|
2/20/2022 8:44:51 PM
|
Request for Review Comments returned by EPC Health Department
|
2/9/2022 4:08:54 PM
|
Request for Review Comments returned by Parks Advisory Board
|
2/1/2022 3:02:28 PM
|
Submission request sent to Applicant
|
2/1/2022 3:01:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/1/2022 2:59:44 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/1/2022 2:51:48 PM
|
Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/1/2022 2:38:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/1/2022 12:30:44 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/25/2022 4:23:08 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/25/2022 3:32:53 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
1/25/2022 1:18:10 PM
|
Request for Review Comments returned by Fountain
|
1/25/2022 8:07:55 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
1/24/2022 1:45:52 PM
|
Request for Review Comments returned by EPC Parks Department
|
1/24/2022 1:35:29 PM
|
Request for Review Comments returned by Widefield SD 3
|
1/24/2022 9:56:59 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/24/2022 9:20:55 AM
|
Submission request sent to Applicant
|
1/24/2022 8:46:23 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/14/2022 10:54:02 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
1/12/2022 8:47:56 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/5/2022 8:41:23 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/3/2022 9:17:52 AM
|
Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
|
1/3/2022 8:31:59 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Brandon Bernard on behalf of Widefield Water & San
|
1/3/2022 8:31:56 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by COO Dave Gish on behalf of Widefield SD 3
|
1/3/2022 8:31:54 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Roy Heald on behalf of Security Water & Sanitation District
|
1/3/2022 8:31:51 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
|
1/3/2022 8:31:49 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/3/2022 8:31:47 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
1/3/2022 8:31:45 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kristy Martinez on behalf of Fountain
|
1/3/2022 8:31:42 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
1/3/2022 8:31:40 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
1/3/2022 8:31:34 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
1/3/2022 8:31:32 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bea Romero on behalf of CenturyLink
|
1/3/2022 8:31:29 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
1/3/2022 8:31:27 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
1/3/2022 8:31:24 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
1/3/2022 8:31:22 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/3/2022 8:31:20 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
1/3/2022 8:31:01 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/3/2022 8:30:59 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Michael Diehl on behalf of Xcel Energy
|
1/3/2022 8:30:56 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of Parks Advisory Board
|
1/3/2022 8:30:54 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/3/2022 8:30:48 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
|
1/3/2022 8:30:46 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
|
1/3/2022 8:30:44 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of EPC Parks Department
|
1/3/2022 8:30:42 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
1/3/2022 8:30:35 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/3/2022 8:30:33 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
1/3/2022 8:30:26 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Steve Schleiker on behalf of Assessor's Office
|
1/3/2022 8:30:24 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
1/3/2022 8:30:21 AM
|
Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/3/2022 8:19:50 AM
|
Fees paid: 1/3/2022 (Receipt: 1005589)
|
1/3/2022 8:00:57 AM
|
Payment Request sent: 1/3/2022
|
1/3/2022 8:00:57 AM
|
File # Assigned: SF221
|
1/3/2022 8:00:46 AM
|
Submission Triaged
|
1/3/2022 5:27:48 AM
|
Submission received from Applicant
|
12/14/2021 2:03:35 PM
|
Submission request sent to Applicant
|
12/14/2021 1:59:49 PM
|
Project Manager Assigned: Kari Parsons
|
12/14/2021 1:59:49 PM
|
EA Assigned: EA20166
|
12/14/2021 1:59:49 PM
|
Project Created
|