Project Details

Search


File Number
SF221
Project Name
Skyline at Lorson Ranch Final Plat
Description
85 Single-Family Lots, public roads, & early grading with wet utilities; site also includes a RHBPS pump station, and maintenance building; deviations for pedestrian ramps at street crossings
Parcels
5500000275 5500000275 5500000403 5500000403 5500000440 5500000440 5513300002 5513300002 5513310105 5513310105 5513403068 5513403068
Applicant
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
EA Number
EA20166
File Prefix
SF - Final Plat
Year
2022
Project Manager
Kari Parsons
Status
Closed
Created
12/14/2021 1:59:08 PM

View: Review Comments


Approved Documents (10)

Link Document
View Grading & Erosion Control checklist
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View PBMP Applicability Form
View SWMP checklist
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Drainage Report - Final
View Traffic Impact Study
View pond ms4


Additional Documents (17)

Link Document Comment
View letter to neighbors admin plat approval
View Notice and Labels
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View Recorded Approval of Final Plat Filing NO. 1 - 222092409
View Approved Pavement Design Report
View Returned Mail - 8/15/23
View Reduced FAE Approved
View FAE Sidewalk Approved
View Title Commitment and Tax Certificate
View Recorded Plat - 224715265
View Recorded Public ROW License Agreement - 224015378
View Recorded SIA - 224015379
View Recorded Declaration of Covenants, Conditions, Restrictions and Easements - 224015380
View 24-214 Skyline at Lorson Ranch Filing 1 PA


Review Documents (48)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 1/3/2022 4:59:15 AM
View Application/Petition Form 1/3/2022 4:59:16 AM
View Grading & Erosion Control checklist 3/31/2022 7:11:26 AM
View Legal Description (MS WORD Version required) 1/3/2022 5:00:16 AM
View Letter of Intent 3/31/2022 6:59:34 AM
View Title Commitment (Current within 30 days of submittal) 1/3/2022 4:59:27 AM
View Vicinity/Location Map 1/3/2022 4:59:28 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 8/3/2022 1:29:14 PM
View Financial Assurance Forms 1/2/2024 10:52:13 AM
View PBMP Applicability Form 1/3/2022 4:59:33 AM
View PDB/BMP Operations & Maintenance Manual 1/3/2022 4:59:31 AM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 1/3/2022 4:59:30 AM
View Subdivision Improvement Agreement (MS Word version required) 1/19/2024 9:05:45 AM
View SWMP checklist 1/3/2022 4:59:33 AM
View Construction Drawings (Plans/Profiles) 5/4/2022 7:37:19 AM
View Final Plat Drawings 7/15/2022 7:58:44 AM
View Grading & Erosion Control Plan 5/4/2022 7:37:28 AM
View Storm Water Management Plan (SWMP) 1/3/2022 4:59:29 AM
View Commitment letter from waste water service provider 1/3/2022 4:59:19 AM
View Commitment letter from water service provider 1/3/2022 4:59:17 AM
View Electric Provider Commitment Letter 1/3/2022 4:59:19 AM
View Fire Commitment Letter 1/3/2022 4:59:21 AM
View Natural Gas Commitment Letter 1/3/2022 4:59:26 AM
View Drainage Report - Final 5/4/2022 7:37:24 AM
View Fire Protection Report 1/3/2022 4:59:22 AM
View Natural Features Report 1/3/2022 4:59:25 AM
View Soils & Geology Report 1/3/2022 4:59:22 AM
View Subdivision Summary Sheet 1/3/2022 4:59:26 AM
View Traffic Impact Study 8/3/2022 1:29:16 PM
View Water Supply Information Summary 1/3/2022 4:59:29 AM
View Declaration of Covenants (MS Word version required) 1/3/2022 5:04:13 AM
View HOA articles of incorporation 1/3/2022 4:59:24 AM
View HOA bylaws (MS Word version required) 1/3/2022 4:59:25 AM
View Secretary of State Certification 1/3/2022 4:59:26 AM
View CAD file 6/13/2022 7:06:45 AM
View CAO Water finding from prelim plan 1/3/2022 4:59:34 AM
View ccr's 1/2/2024 10:52:16 AM
View Closures Sheet (Survey) 1/3/2022 4:59:17 AM
View fdr response to comments2 5/4/2022 7:22:02 AM
View landscape agreement w/ exhibits 1/3/2024 9:45:23 AM
View plat response to comments2 5/4/2022 7:22:01 AM
View pond ms4 1/3/2022 4:59:35 AM
View SEO Water finding from prelim plan 1/3/2022 4:59:34 AM
View sia 6/13/2022 7:06:45 AM
View SIA in word form 1/19/2024 9:05:46 AM
View SIA pdf 7/15/2022 7:58:46 AM
View sidewalk addendum exhibits 12/11/2023 1:31:25 PM
View sidewalk addendum exhibits 1/2/2024 10:52:15 AM



Events (154)

Date Comment
2/15/2024 2:21:03 PM Project Closed
2/15/2024 2:21:03 PM Project Approved: 2/15/2024
2/15/2024 2:00:49 PM Request for Review Comments returned by County Attorney - Development Review
1/29/2024 9:25:35 AM Request for Review Comments returned by PCD Project Manager
1/22/2024 8:11:24 AM Request for Review Comments returned by PCD Engineering Division
1/22/2024 7:13:02 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/22/2024 7:13:00 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
1/22/2024 7:11:17 AM Submission Triaged
1/19/2024 9:06:00 AM Submission received from Applicant
1/18/2024 4:29:22 PM Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
1/18/2024 4:27:51 PM Submission request sent to Applicant
1/18/2024 4:12:35 PM Request for Review Comments returned by County Attorney - Development Review
1/8/2024 10:01:24 AM Request for Review Comments returned by PCD Engineering Division
1/3/2024 9:53:52 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/3/2024 9:53:50 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
1/3/2024 9:53:48 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
1/3/2024 9:53:46 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
1/3/2024 9:51:49 AM Submission Triaged
1/3/2024 9:45:36 AM Submission received from Applicant
1/2/2024 2:08:35 PM Submission request sent to Applicant
1/2/2024 1:59:50 PM Submission request sent to Applicant
1/2/2024 1:59:34 PM Submission Triaged
1/2/2024 10:52:59 AM Submission received from Applicant
1/2/2024 10:28:33 AM Submission request sent to Applicant
1/2/2024 9:19:57 AM Submission request sent to Applicant
12/28/2023 1:45:52 PM Request for Review Comments returned by County Attorney - Development Review
12/26/2023 9:05:57 AM Request for Review Comments returned by PCD Engineering Division
12/11/2023 3:21:11 PM Project reopened for Review Comments
12/11/2023 3:14:11 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
12/11/2023 3:14:09 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
12/11/2023 3:14:06 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lupe Packman on behalf of PCD Engineering Division
12/11/2023 3:14:04 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
12/11/2023 3:14:02 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/11/2023 3:14:00 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Edward Schoenheit on behalf of PCD Engineering Division
12/11/2023 3:13:58 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
12/11/2023 3:13:56 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Charlene Durham on behalf of PCD Engineering Division
12/11/2023 3:13:54 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
12/11/2023 3:10:38 PM Submission Triaged
12/11/2023 1:31:45 PM Submission received from Applicant
12/11/2023 12:35:01 PM Submission request sent to Applicant
11/27/2023 7:48:41 AM Submission request sent to Applicant
8/25/2022 3:14:23 PM Project Closed
8/25/2022 3:14:23 PM Project Approved: 8/25/2022
8/25/2022 3:09:56 PM Project Ready for Approval requests. Review Comment period is complete.
8/23/2022 1:43:34 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
8/23/2022 1:37:48 PM Request for Review Comments returned by PCD Engineering Division
8/15/2022 4:02:10 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/4/2022 5:01:59 PM Request for Review Comments returned by PCD Engineering Division
8/3/2022 1:47:37 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/3/2022 1:46:54 PM Submission Triaged
8/3/2022 1:29:22 PM Submission received from Applicant
8/2/2022 5:43:45 PM Submission request sent to Applicant
8/2/2022 6:55:34 AM Submission request sent to Applicant
7/28/2022 10:02:39 AM Request for Review Comments returned by PCD Project Manager
7/28/2022 9:44:09 AM Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/28/2022 8:02:48 AM Request for Review Comments returned by PCD Engineering Division
7/26/2022 11:18:57 AM Request for Review Comments returned by County Attorney - Development Review
7/16/2022 2:14:55 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
7/16/2022 2:14:52 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
7/16/2022 2:14:50 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/16/2022 2:12:40 PM Submission Triaged
7/15/2022 7:58:54 AM Submission received from Applicant
7/7/2022 11:48:19 AM Request for Review Comments returned by County Attorney - Development Review
7/6/2022 2:28:11 PM Submission request sent to Applicant
7/6/2022 2:25:23 PM Submission request sent to Applicant
7/6/2022 2:24:49 PM Request for Review Comments returned by PCD Project Manager
6/22/2022 10:37:31 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
6/22/2022 10:37:28 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
6/22/2022 10:35:23 AM Submission Triaged
6/22/2022 10:13:59 AM Submission received from Applicant
6/6/2022 1:39:50 PM Submission request sent to Applicant
6/1/2022 3:53:52 PM Request for Review Comments returned by EPC Stormwater Review
5/31/2022 10:07:31 AM Request for Review Comments returned by PCD Engineering Division
5/25/2022 12:06:59 PM Request for Review Comments returned by PCD Project Manager
5/10/2022 12:15:06 PM Request for Review Comments returned by County Attorney - Development Review
5/4/2022 7:44:58 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
5/4/2022 7:44:56 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
5/4/2022 7:44:54 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/4/2022 7:42:54 AM Submission Triaged
5/4/2022 7:37:57 AM Submission received from Applicant
4/25/2022 3:14:55 PM Submission request sent to Applicant
4/25/2022 3:08:48 PM Request for Review Comments returned by PCD Engineering Division
4/25/2022 2:49:25 PM Request for Review Comments returned by EPC Stormwater Review
4/25/2022 2:34:38 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
4/25/2022 2:30:09 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of PCD Administrative Notice
4/25/2022 1:58:15 PM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
4/25/2022 1:56:06 PM Request for Review Comments returned by PCD Project Manager
4/25/2022 1:54:01 PM Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
4/25/2022 1:52:39 PM Request for Review Comments returned by PCD Project Manager
3/31/2022 7:32:48 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/31/2022 7:32:47 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
3/31/2022 7:32:44 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/31/2022 7:30:27 AM Submission Triaged
3/31/2022 7:11:32 AM Submission received from Applicant
3/1/2022 9:33:09 AM Submission request sent to Applicant
2/20/2022 8:44:51 PM Request for Review Comments returned by EPC Health Department
2/9/2022 4:08:54 PM Request for Review Comments returned by Parks Advisory Board
2/1/2022 3:02:28 PM Submission request sent to Applicant
2/1/2022 3:01:03 PM Request for Review Comments returned by PCD Project Manager
2/1/2022 2:59:44 PM Request for Review Comments returned by PCD Engineering Division
2/1/2022 2:51:48 PM Request for Review Comments email resent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/1/2022 2:38:31 PM Request for Review Comments returned by PCD Engineering Division
2/1/2022 12:30:44 PM Request for Review Comments returned by County Attorney - Development Review
1/25/2022 4:23:08 PM Request for Review Comments returned by EPC Stormwater Review
1/25/2022 3:32:53 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
1/25/2022 1:18:10 PM Request for Review Comments returned by Fountain
1/25/2022 8:07:55 AM Request for Review Comments returned by Colorado Springs Public Works
1/24/2022 1:45:52 PM Request for Review Comments returned by EPC Parks Department
1/24/2022 1:35:29 PM Request for Review Comments returned by Widefield SD 3
1/24/2022 9:56:59 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/24/2022 9:20:55 AM Submission request sent to Applicant
1/24/2022 8:46:23 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/14/2022 10:54:02 AM Request for Review Comments returned by Colorado Parks and Wildlife
1/12/2022 8:47:56 AM Request for Review Comments returned by EPC Environmental Services
1/5/2022 8:41:23 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/3/2022 9:17:52 AM Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
1/3/2022 8:31:59 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Brandon Bernard on behalf of Widefield Water & San
1/3/2022 8:31:56 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by COO Dave Gish on behalf of Widefield SD 3
1/3/2022 8:31:54 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Roy Heald on behalf of Security Water & Sanitation District
1/3/2022 8:31:51 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
1/3/2022 8:31:49 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
1/3/2022 8:31:47 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
1/3/2022 8:31:45 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kristy Martinez on behalf of Fountain
1/3/2022 8:31:42 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
1/3/2022 8:31:40 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
1/3/2022 8:31:34 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/3/2022 8:31:32 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bea Romero on behalf of CenturyLink
1/3/2022 8:31:29 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
1/3/2022 8:31:27 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
1/3/2022 8:31:24 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
1/3/2022 8:31:22 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/3/2022 8:31:20 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
1/3/2022 8:31:01 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
1/3/2022 8:30:59 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Michael Diehl on behalf of Xcel Energy
1/3/2022 8:30:56 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of Parks Advisory Board
1/3/2022 8:30:54 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/3/2022 8:30:48 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
1/3/2022 8:30:46 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
1/3/2022 8:30:44 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by on behalf of EPC Parks Department
1/3/2022 8:30:42 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
1/3/2022 8:30:35 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
1/3/2022 8:30:33 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/3/2022 8:30:26 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Steve Schleiker on behalf of Assessor's Office
1/3/2022 8:30:24 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Kari Parsons on behalf of PCD Project Manager
1/3/2022 8:30:21 AM Request for Review Comments email sent for Project Skyline at Lorson Ranch Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/3/2022 8:19:50 AM Fees paid: 1/3/2022 (Receipt: 1005589)
1/3/2022 8:00:57 AM Payment Request sent: 1/3/2022
1/3/2022 8:00:57 AM File # Assigned: SF221
1/3/2022 8:00:46 AM Submission Triaged
1/3/2022 5:27:48 AM Submission received from Applicant
12/14/2021 2:03:35 PM Submission request sent to Applicant
12/14/2021 1:59:49 PM Project Manager Assigned: Kari Parsons
12/14/2021 1:59:49 PM EA Assigned: EA20166
12/14/2021 1:59:49 PM Project Created