Project Details

Search


File Number
PPR228
Project Name
Pike Solar Site Development Plan
Description
Request to develop 175 MW solar facility including single-axis tracker arrays with photovoltaic modules capable of generating up to 175 AC MW and a potential of 25MW Battery Energy Storage System. This project will have an 1,350-acre solar array siting envelope within the 4998.37 Acres WSEO Boundary on land owned by the City of Colorado Springs . The project will also include 35-kv medium voltage feeders to the project substation, a centralized project substation and overhead high-voltage AC feeders to the Williams Creek substation. Expansion of the Williams Creek Substation and 230 kV lines are included in the 1041 request.
Parcels
5600000123 5600000123 5600000140 5600000140
Applicant
JuweAmerica Solar
Eric Jesse, Engineer Eric Jesse ( ejesse@juwiamericas.com )
(303) 877-4715
Eric Jesse, Engineer Eric Jesse ( ejesse@juwiamericas.com )
(303) 877-4715
EA Number
20-134
File Prefix
PPR - Plot Plan Review
Year
2022
Project Manager
Kari Parsons
Status
Closed
Created
11/29/2021 4:02:20 PM

View: Review Comments



Additional Documents (16)

Link Document Comment
View FAE Approved
View SWMP APPROVED
View SWMP CHECKLIST APPROVED
View PBMP Approved
View MS 4 Accepted
View Grading Erosion Control Plan Approved Part 2 sheets 51 plus
View Grading Erosion Control Plan Approved Part 1 sheets 1-50
View GEC Checklist Approved
View Drainage Report Approved
View ESQCP Approved
View CDS Approved
View Approved Lighting Plan
View Approved Landscape Reseed Mix Plan
View Site Development Plan Approved
View Initial Road Survey file link 11 15 2022
View Road report 11 18 2022 Birdsaw Road damage at Manhole


Review Documents (78)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 2/1/2022 6:56:06 PM
View Application/Petition Form 7/19/2022 2:04:27 PM
View Grading & Erosion Control checklist 7/19/2022 2:21:33 PM
View Legal Description (MS WORD Version required) 2/1/2022 11:40:35 AM
View Letter of Intent 8/26/2022 6:56:04 AM
View Photo Simulations 2/1/2022 11:45:45 AM
View Title Commitment (Current within 30 days of submittal) 2/2/2022 10:27:06 AM
View Vicinity/Location Map 2/2/2022 3:52:36 PM
View Clearance Letter - Colorado Parks and Wildlife 2/2/2022 12:10:35 PM
View Clearance Letter - USF&W 2/2/2022 10:53:34 AM
View Determination of No Hazard from FAA 2/2/2022 10:53:35 AM
View Development Agreement (MS WORD version required-attachments included) 7/19/2022 9:57:53 AM
View Easement(s) (MS Word version required attachments included) 2/1/2022 3:30:46 PM
View Electromagnetic Interference Report 2/2/2022 12:10:35 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 8/26/2022 6:56:06 AM
View Financial Assurance Forms 9/21/2022 9:50:36 AM
View Floodplain Development Permit 2/1/2022 6:58:25 PM
View Interconnect Agreement 2/2/2022 10:53:34 AM
View PBMP Applicability Form 7/19/2022 2:21:34 PM
View Power Purchase Agreement 2/2/2022 10:27:08 AM
View Proof of Liability Insurance 2/2/2022 12:10:34 PM
View State Air Quality Permit 2/2/2022 12:10:34 PM
View SWMP checklist 7/19/2022 2:21:34 PM
View Wildland Fire Risk and Hazard Severity Analysis 2/2/2022 12:10:33 PM
View WSEO Overlay Map 7/19/2022 12:09:17 PM
View Grading & Erosion Control Plan 8/26/2022 10:55:36 AM
View Haul Route Plan 2/1/2022 11:30:22 AM
View Landscape Plan drawings 7/20/2022 2:32:01 PM
View Lighting Plan 7/19/2022 12:06:00 PM
View Operations Plan 2/1/2022 11:45:46 AM
View Site Development Plan 9/26/2022 11:27:55 AM
View Storm Water Management Plan (SWMP) 7/19/2022 2:26:56 PM
View Road condition survey 2/1/2022 11:46:50 AM
View Wetlands Analysis Report 2/1/2022 6:56:08 PM
View Commitment letter from water service provider 2/1/2022 6:56:07 PM
View Electric Provider Commitment Letter 2/1/2022 11:15:08 AM
View Fire Commitment Letter 2/11/2022 12:31:48 PM
View Drainage Report - Final 9/21/2022 9:50:37 AM
View Noxious Weed Management Plan 2/2/2022 12:10:32 PM
View Soils & Geology Report 2/2/2022 9:52:01 AM
View Traffic Impact Study 8/26/2022 6:56:06 AM
View Air Quality Management Plan 2/2/2022 10:33:44 AM
View COMMENT RESPONSE DOC: FAE 7/19/2022 9:25:52 AM
View COMMENT RESPONSE DOC: Final Drainage Report 7/19/2022 9:30:20 AM
View COMMENT RESPONSE DOC: GEC Checklist 7/19/2022 9:21:16 AM
View COMMENT RESPONSE DOC: GEC Plan 7/19/2022 9:24:47 AM
View COMMENT RESPONSE DOC: PBMP Applicability 7/19/2022 9:31:24 AM
View COMMENT RESPONSE DOC: Site Development Plan Set 7/18/2022 5:10:14 PM
View COMMENT RESPONSE DOC: SWMP 7/19/2022 9:32:38 AM
View COMMENT RESPONSE DOC: SWMP Checklist 7/19/2022 9:49:21 AM
View Comment Response Memorandum - First Review 7/19/2022 3:56:59 PM
View Construction Drawings 9/26/2022 11:33:23 AM
View Construction Drawings (for reference) 7/19/2022 2:40:56 PM
View Correspondence with Kinder Morgan re: 2022 Execution 2/1/2022 2:28:29 PM
View Decommissioning Plan 7/19/2022 9:56:12 AM
View Detail Plans, Signs & Lighting 7/19/2022 3:27:52 PM
View Draft Kinder Morgan Crossing Agreement - Executed to be submitted later 2/1/2022 2:29:11 PM
View Drainage Report Comment Responses 8/26/2022 10:49:04 AM
View Elevation Plans 7/19/2022 1:17:02 PM
View Emergency Response Plan 2/1/2022 2:31:42 PM
View Exhibit B - Woodmoor Temporary Access Easement 7/19/2022 3:39:56 PM
View Financial Assurance Comment Responses 8/26/2022 10:49:05 AM
View GEC Comment Responses 8/26/2022 10:50:00 AM
View GEC Part 2 8/26/2022 10:59:08 AM
View GEC Plans 1 9/21/2022 10:01:14 AM
View GEC Plans 2 9/21/2022 10:02:39 AM
View Geologic Hazards Study - per CGS request 2/2/2022 9:52:17 AM
View Meter Locations Plan 7/19/2022 1:29:12 PM
View MS4 - Submittal Doc per Request from Christina Prete 7/19/2022 3:37:05 PM
View Proposed Fountain Transmission Corridor Route for Revocable License w/ Correspondence Between CSU and Fountain 2/2/2022 10:33:14 AM
View Regional Trail corridor easement 2/8/2022 2:33:56 PM
View Response to Comments on LOI - Markup Summary 7/19/2022 2:26:58 PM
View Road Impact Fee Calculation Memo - Per Jeff Request 8/26/2022 6:56:08 AM
View Runoff Reduction Plan - also included at end of SDP set 7/19/2022 2:53:19 PM
View Site Plan Comment Responses 8/26/2022 10:50:01 AM
View SPCC Plan, Tier 2 2/2/2022 12:10:36 PM
View Updated SWMP Report 8/26/2022 10:50:55 AM
View Wildlife Exclusionary Fencing Details 2/8/2022 1:09:49 PM



Events (150)

Date Comment
10/4/2022 8:30:19 AM Project Closed
10/4/2022 8:30:19 AM Project Approved: 10/4/2022
10/4/2022 8:22:55 AM Request for Review Comments returned by PCD Project Manager
10/3/2022 5:12:13 PM Request for Review Comments returned by EPC Stormwater Review
10/3/2022 4:11:17 PM Request for Review Comments returned by PCD Engineering Division
9/26/2022 11:46:27 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
9/26/2022 11:45:49 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Deputy Enginneer Ben Sheets on behalf of Fountain
9/26/2022 11:45:46 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/26/2022 11:45:45 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
9/26/2022 11:45:43 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/26/2022 11:43:23 AM Submission Triaged
9/26/2022 11:39:07 AM Submission received from Applicant
9/21/2022 10:46:42 AM Request for Review Comments returned by EPC Stormwater Review
9/21/2022 7:06:15 AM Submission request sent to Applicant
9/21/2022 7:04:22 AM Request for Review Comments returned by PCD Project Manager
9/20/2022 6:21:54 PM Request for Review Comments returned by PCD Engineering Division
8/31/2022 8:22:01 PM Request for Review Comments returned by Meadow Lake Airport Association
8/26/2022 4:24:34 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
8/26/2022 4:22:41 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
8/26/2022 4:22:38 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/26/2022 4:20:56 PM Submission Triaged
8/26/2022 3:44:52 PM Submission received from Applicant
8/15/2022 2:27:51 PM Submission request sent to Applicant
8/15/2022 2:22:44 PM Request for Review Comments returned by PCD Project Manager
8/12/2022 10:01:25 AM Request for Review Comments returned by PCD Engineering Division
8/10/2022 2:50:10 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
8/10/2022 1:08:17 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/9/2022 1:23:10 PM Request for Review Comments returned by EPC Stormwater Review
8/9/2022 1:15:14 PM Request for Review Comments returned by El Paso County Conservation Dist
8/9/2022 1:01:17 PM Request for Review Comments returned by Pikes Peak Regional Building Department
8/8/2022 3:33:26 PM Request for Review Comments returned by Hanover Fire Protection District
8/5/2022 10:50:39 AM Request for Review Comments returned by EPC Environmental Services
8/3/2022 2:20:06 PM Request for Review Comments returned by Fountain
8/3/2022 2:06:08 PM Request for Review Comments email resent for Project Pike Solar Site Development Plan for review by Kristy Martinez on behalf of Fountain
8/3/2022 10:00:59 AM Request for Review Comments returned by Fountain
8/2/2022 7:52:15 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
8/1/2022 9:00:16 AM Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
7/29/2022 2:20:53 PM Request for Review Comments returned by EPC Parks Department
7/20/2022 2:57:47 PM Submission Triaged
7/20/2022 2:52:13 PM Submission received from Applicant
7/20/2022 9:18:30 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/20/2022 7:50:58 AM Request for Review Comments returned by RBD Floodplain
7/20/2022 7:30:59 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
7/20/2022 7:30:58 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
7/20/2022 7:30:57 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Contact on behalf of Springs East Airport
7/20/2022 7:30:56 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
7/20/2022 7:30:54 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
7/20/2022 7:30:53 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
7/20/2022 7:30:52 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Grant Schmidt on behalf of Hanover SD 28
7/20/2022 7:30:50 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by on behalf of Hanover Fire Protection District
7/20/2022 7:30:48 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kristy Martinez on behalf of Fountain
7/20/2022 7:30:47 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
7/20/2022 7:30:46 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/20/2022 7:30:45 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
7/20/2022 7:30:43 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Heather on behalf of City of Fountain Electric
7/20/2022 7:30:42 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
7/20/2022 7:30:40 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Terry Seaman on behalf of Cheyenne Mountain Air Force Station
7/20/2022 7:30:39 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/20/2022 7:30:38 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
7/20/2022 7:30:36 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
7/20/2022 7:30:35 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
7/20/2022 7:30:33 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/20/2022 7:30:32 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
7/20/2022 7:30:31 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
7/20/2022 7:30:30 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Justin Osborne on behalf of Colorado State Land Board
7/20/2022 7:30:29 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
7/20/2022 7:30:27 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Michael Diehl on behalf of Xcel Energy
7/20/2022 7:30:25 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/20/2022 7:30:24 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Bill Elder on behalf of EPC Sheriff's Department
7/20/2022 7:30:23 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Bill Elder on behalf of EPC Sheriff's Department
7/20/2022 7:30:22 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
7/20/2022 7:30:21 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by on behalf of EPC Parks Department
7/20/2022 7:30:19 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
7/20/2022 7:30:18 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Steve Schleiker on behalf of Assessor's Office
7/20/2022 7:30:17 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
7/20/2022 7:30:15 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/20/2022 7:07:56 AM Submission request sent to Applicant
7/20/2022 7:04:01 AM Submission Triaged
7/19/2022 4:32:34 PM Submission received from Applicant
7/19/2022 10:46:59 AM Submission request sent to Applicant
7/19/2022 8:34:21 AM Request for Review Comments returned by El Paso County Conservation Dist
6/30/2022 3:29:35 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
3/21/2022 1:05:23 PM Submission request sent to Applicant
3/21/2022 1:02:06 PM Request for Review Comments returned by PCD Project Manager
3/21/2022 12:55:39 PM Request for Review Comments returned by PCD Engineering Division
3/18/2022 5:14:34 PM Request for Review Comments returned by EPC Stormwater Review
3/17/2022 11:50:26 AM Request for Review Comments returned by Meadow Lake Airport Association
3/10/2022 2:27:49 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
3/10/2022 2:27:45 PM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/8/2022 4:24:49 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/8/2022 11:14:15 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/8/2022 9:44:19 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
3/1/2022 10:36:34 AM Request for Review Comments returned by Fountain
2/28/2022 10:13:49 AM Request for Review Comments returned by EPC Environmental Services
2/23/2022 8:31:05 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/22/2022 2:20:07 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
2/18/2022 7:21:52 AM Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
2/17/2022 9:09:21 AM Request for Review Comments returned by EPC Parks Department
2/16/2022 8:50:55 AM Request for Review Comments returned by RBD Floodplain
2/15/2022 10:49:17 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
2/15/2022 10:49:14 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
2/15/2022 10:49:12 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Contact on behalf of Springs East Airport
2/15/2022 10:49:10 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
2/15/2022 10:49:07 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
2/15/2022 10:49:04 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
2/15/2022 10:49:02 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Grant Schmidt on behalf of Hanover SD 28
2/15/2022 10:49:00 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by on behalf of Hanover Fire Protection District
2/15/2022 10:48:57 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kristy Martinez on behalf of Fountain
2/15/2022 10:48:55 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/15/2022 10:48:53 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
2/15/2022 10:48:51 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Heather on behalf of City of Fountain Electric
2/15/2022 10:48:49 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
2/15/2022 10:48:47 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Terry Seaman on behalf of Cheyenne Mountain Air Force Station
2/15/2022 10:48:44 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Pamela Davidson on behalf of Central CO Conservation District
2/15/2022 10:48:42 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
2/15/2022 10:48:38 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
2/15/2022 10:48:35 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
2/15/2022 10:48:33 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
2/15/2022 10:48:31 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/15/2022 10:48:28 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/15/2022 10:48:26 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
2/15/2022 10:48:24 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Justin Osborne on behalf of Colorado State Land Board
2/15/2022 10:48:22 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
2/15/2022 10:48:19 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Michael Diehl on behalf of Xcel Energy
2/15/2022 10:48:17 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
2/15/2022 10:48:11 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Bill Elder on behalf of EPC Sheriff's Department
2/15/2022 10:48:09 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Bill Elder on behalf of EPC Sheriff's Department
2/15/2022 10:48:06 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/15/2022 10:48:03 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by on behalf of EPC Parks Department
2/15/2022 10:48:01 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
2/15/2022 10:47:59 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Steve Schleiker on behalf of Assessor's Office
2/15/2022 10:47:57 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Kari Parsons on behalf of PCD Project Manager
2/15/2022 10:47:54 AM Request for Review Comments email sent for Project Pike Solar Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/14/2022 10:57:40 AM Fees paid: 2/14/2022 (Receipt: 1005808)
2/14/2022 10:24:48 AM Submission Triaged
2/14/2022 10:10:22 AM Submission received from Applicant
2/14/2022 7:43:21 AM Submission request sent to Applicant
2/14/2022 7:43:01 AM Payment Request sent: 2/14/2022
2/14/2022 7:43:01 AM File # Assigned: PPR228
2/14/2022 7:42:53 AM Submission Triaged
2/11/2022 5:52:15 PM Submission received from Applicant
2/9/2022 11:13:31 AM Submission request sent to Applicant
2/9/2022 11:12:50 AM Submission Triaged
2/8/2022 7:02:12 PM Submission received from Applicant
2/3/2022 3:41:51 PM Submission request sent to Applicant
1/13/2022 11:39:50 AM Submission request sent to Applicant
11/29/2021 4:23:21 PM Submission request sent to Applicant
11/29/2021 4:02:36 PM Project Manager Assigned: Kari Parsons
11/29/2021 4:02:36 PM EA Assigned: 20-134
11/29/2021 4:02:36 PM Project Created