7/31/2025 9:00:32 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/31/2025 8:58:49 AM
|
Submission request sent to Applicant
|
7/31/2025 8:58:15 AM
|
Submission Triaged
|
7/31/2025 8:48:30 AM
|
Request for Review Comments email resent for Project Nabulsi-Abushaban Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
7/31/2025 8:10:25 AM
|
Submission received from Applicant
|
7/25/2025 3:45:25 PM
|
Request for Review Comments returned by County Attorney - Water
|
7/25/2025 3:10:34 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/23/2025 5:17:48 PM
|
Submission request sent to Applicant
|
7/23/2025 5:16:36 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/23/2025 5:14:26 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/23/2025 12:55:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/21/2025 2:18:46 PM
|
Request for Review Comments returned by EPC Fire and Wildfire Program Manager
|
7/9/2025 9:55:08 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
|
7/9/2025 9:47:05 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
7/9/2025 9:47:04 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
7/9/2025 9:47:03 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Water
|
7/9/2025 9:46:13 AM
|
Submission Triaged
|
7/9/2025 8:14:08 AM
|
Submission received from Applicant
|
7/9/2025 8:03:20 AM
|
Submission request sent to Applicant
|
7/9/2025 7:53:46 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
7/9/2025 7:53:45 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
7/9/2025 7:53:44 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
7/9/2025 7:53:07 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
7/9/2025 7:53:06 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/9/2025 7:53:05 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/9/2025 7:53:04 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
7/9/2025 7:51:22 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
7/9/2025 7:51:21 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
7/9/2025 7:51:20 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
7/9/2025 7:51:19 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
7/9/2025 7:51:16 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/9/2025 7:51:15 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
7/9/2025 7:41:57 AM
|
Submission Triaged
|
7/8/2025 5:09:50 PM
|
Submission received from Applicant
|
4/21/2025 5:24:00 PM
|
Submission request sent to Applicant
|
4/21/2025 5:22:34 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/21/2025 5:18:34 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/21/2025 4:21:21 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/21/2025 4:19:36 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/21/2025 3:38:37 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/21/2025 8:19:33 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
4/7/2025 1:45:52 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/7/2025 1:13:14 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Rachel Dunn on behalf of Black Forest Fire Protection District
|
4/7/2025 1:13:13 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Michael Alvarado on behalf of Black Forest Fire Protection District
|
4/7/2025 1:13:12 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by on behalf of Black Forest Fire Protection District
|
4/7/2025 1:13:11 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Chad Herdt on behalf of Black Forest Fire Protection District
|
4/7/2025 1:13:10 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
4/7/2025 1:13:09 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
4/7/2025 1:13:08 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/7/2025 1:13:07 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/7/2025 1:13:06 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
4/7/2025 1:13:05 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
4/7/2025 1:13:04 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
4/7/2025 1:13:03 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Water
|
4/7/2025 1:13:02 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
4/7/2025 1:13:01 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
4/7/2025 1:13:00 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
4/7/2025 1:12:58 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
4/7/2025 1:12:55 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/7/2025 1:12:54 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
4/7/2025 1:08:06 PM
|
Submission Triaged
|
4/7/2025 12:33:46 PM
|
Submission received from Applicant
|
4/7/2025 7:19:06 AM
|
Submission request sent to Applicant
|
4/7/2025 7:18:43 AM
|
Submission Triaged
|
4/3/2025 9:48:57 AM
|
Submission received from Applicant
|
11/13/2024 10:18:14 AM
|
Submission request sent to Applicant
|
11/13/2024 10:15:08 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/13/2024 7:22:46 AM
|
Submission request sent to Applicant
|
11/12/2024 6:02:41 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/12/2024 3:21:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/12/2024 3:04:22 PM
|
Request for Review Comments email resent for Project Nabulsi-Abushaban Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
11/12/2024 2:49:06 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/12/2024 2:26:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/12/2024 1:40:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/11/2024 7:22:23 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
11/5/2024 12:56:26 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/28/2024 2:40:41 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/22/2024 4:07:02 PM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/21/2024 7:53:13 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by on behalf of Black Forest Fire Protection District
|
10/21/2024 7:53:11 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
10/21/2024 7:53:09 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
10/21/2024 7:53:07 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
10/21/2024 7:53:05 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
10/21/2024 7:53:03 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
10/21/2024 7:53:01 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
10/21/2024 7:52:59 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Water
|
10/21/2024 7:52:57 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
10/21/2024 7:52:55 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
10/21/2024 7:52:53 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
10/21/2024 7:52:52 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
10/21/2024 7:52:48 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/21/2024 7:52:46 AM
|
Request for Review Comments email sent for Project Nabulsi-Abushaban Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/21/2024 7:47:54 AM
|
Submission Triaged
|
10/17/2024 4:53:23 PM
|
Submission received from Applicant
|
1/9/2024 12:30:23 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
1/9/2024 12:24:13 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
12/28/2023 1:11:19 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/28/2023 12:59:47 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/23/2023 3:33:37 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/19/2023 11:20:13 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/18/2023 4:44:16 PM
|
Submission request sent to Applicant
|
12/18/2023 4:42:50 PM
|
Submission request sent to Applicant
|
12/18/2023 4:38:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/18/2023 4:01:38 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/18/2023 8:47:20 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/13/2023 11:38:10 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/12/2023 11:35:27 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/12/2023 9:30:02 AM
|
Project Manager Assigned: Joe Letke
|
12/12/2023 8:13:46 AM
|
Project Manager Assigned: Kylie Bagley
|
12/8/2023 9:46:50 AM
|
Request for Review Comments returned by Parks Advisory Board
|
12/1/2023 4:54:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/1/2023 11:35:29 AM
|
Request for Review Comments returned by EPC Parks Department
|
11/30/2023 3:38:04 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/30/2023 10:26:18 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/29/2023 10:39:27 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
11/28/2023 8:00:57 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
11/27/2023 11:25:08 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/27/2023 9:47:42 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
11/27/2023 9:12:45 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
11/27/2023 9:05:13 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Bob Mooney on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
11/27/2023 9:05:11 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
11/27/2023 9:05:09 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
11/27/2023 9:05:06 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
11/27/2023 9:05:04 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
11/27/2023 9:05:02 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
11/27/2023 9:05:00 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
11/27/2023 9:04:58 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
11/27/2023 9:04:56 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
11/27/2023 9:04:54 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
11/27/2023 9:04:51 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
11/27/2023 9:04:49 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/27/2023 9:04:47 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
11/27/2023 9:04:45 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/27/2023 9:04:43 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/27/2023 9:04:41 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
11/27/2023 9:04:39 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:37 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:35 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:33 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:31 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:29 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:27 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:25 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:23 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:21 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
11/27/2023 9:04:19 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
11/27/2023 9:04:16 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
11/27/2023 9:04:14 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/27/2023 9:04:12 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by on behalf of Parks Advisory Board
|
11/27/2023 9:04:10 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
11/27/2023 9:04:08 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
11/27/2023 9:04:06 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
11/27/2023 9:04:03 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
11/27/2023 9:04:00 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
11/27/2023 9:03:58 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
11/27/2023 9:03:56 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by on behalf of EPC Parks Department
|
11/27/2023 9:03:54 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Mike McCarthy on behalf of EPC Health Department
|
11/27/2023 9:03:52 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
11/27/2023 9:03:50 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by HEAEH LandUse on behalf of EPC Health Department
|
11/27/2023 9:03:47 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/27/2023 9:03:45 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
11/27/2023 9:03:43 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by April Willie on behalf of County Attorney - Water
|
11/27/2023 9:03:41 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
11/27/2023 9:03:39 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
11/27/2023 9:03:34 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Lupe Packman on behalf of PCD Engineering Division
|
11/27/2023 9:03:30 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/27/2023 9:03:28 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/27/2023 9:03:26 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Edward Schoenheit on behalf of PCD Engineering Division
|
11/27/2023 9:03:24 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
11/27/2023 9:03:22 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Charlene Durham on behalf of PCD Engineering Division
|
11/27/2023 9:03:20 AM
|
Request for Review Comments email sent for Project Black Forest Subdivision for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
11/22/2023 4:07:07 PM
|
Fees paid: 11/22/2023 (Receipt: 1008551)
|
11/22/2023 3:53:08 PM
|
Project Manager Assigned: Joe Letke
|
11/22/2023 3:52:42 PM
|
Payment Request sent: 11/22/2023
|
11/22/2023 3:52:32 PM
|
Submission Triaged
|
11/22/2023 2:48:13 PM
|
Project Manager Assigned: Kari Parsons
|
11/22/2023 2:34:18 PM
|
Submission received from Applicant
|
11/29/2022 4:53:39 PM
|
Submission request sent to Applicant
|
11/29/2022 4:49:22 PM
|
Project Manager Assigned: Ryan Howser
|
11/29/2022 4:43:14 PM
|
File # Assigned: MS2211
|
12/2/2021 3:12:42 PM
|
Submission request sent to Applicant
|