7/2/2024 5:15:52 PM
|
Project Closed
|
7/2/2024 5:15:52 PM
|
Project Approved: 7/2/2024
|
5/14/2024 8:31:36 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
4/26/2024 4:03:40 PM
|
Request for Review Comments returned by EPC Health Department
|
4/23/2024 3:26:18 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/16/2024 10:39:02 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/16/2024 8:41:07 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/9/2024 7:40:02 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
4/8/2024 8:31:24 AM
|
Fees paid: 4/8/2024 (Receipt: 1008968)
|
4/5/2024 3:48:08 PM
|
Payment Request sent: 4/5/2024
|
4/2/2024 10:52:49 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/2/2024 10:52:47 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/2/2024 10:52:45 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Christina Prete on behalf of EPC Stormwater Review
|
4/2/2024 10:52:43 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/2/2024 10:52:39 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
4/2/2024 10:51:10 AM
|
Submission Triaged
|
4/2/2024 9:32:34 AM
|
Submission received from Applicant
|
3/27/2024 10:07:39 AM
|
Submission request sent to Applicant
|
3/27/2024 9:00:31 AM
|
Request for Review Comments returned by Falcon School District 49
|
3/22/2024 11:38:14 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/22/2024 2:37:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/22/2024 11:50:02 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/21/2024 3:39:12 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/19/2024 9:09:39 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/18/2024 11:08:32 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/6/2024 2:36:09 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/5/2024 9:05:56 AM
|
Submission Triaged
|
3/4/2024 11:26:39 AM
|
Submission received from Applicant
|
3/4/2024 9:01:53 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/4/2024 7:52:29 AM
|
Request for Review Comments returned by RBD Floodplain
|
3/1/2024 5:02:49 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by General Email on behalf of Mountain View Electric Association, Inc.
|
3/1/2024 5:02:47 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Evelyn galanephillips on behalf of Falcon School District 49
|
3/1/2024 5:02:45 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Keith Curtis on behalf of RBD Floodplain
|
3/1/2024 5:02:43 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of Pikes Peak Regional Building Department
|
3/1/2024 5:02:41 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/1/2024 5:02:39 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/1/2024 5:02:37 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/1/2024 5:02:35 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/1/2024 5:02:33 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Christina Prete on behalf of EPC Stormwater Review
|
3/1/2024 5:02:31 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of EPC Parks Department
|
3/1/2024 5:02:29 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mike McCarthy on behalf of EPC Health Department
|
3/1/2024 5:02:27 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Catherine McGarvy on behalf of EPC Health Department
|
3/1/2024 5:02:25 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by HEAEH LandUse on behalf of EPC Health Department
|
3/1/2024 5:02:23 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Lori Seago on behalf of County Attorney - Water
|
3/1/2024 5:02:21 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by April Willie on behalf of County Attorney - Water
|
3/1/2024 5:02:17 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/1/2024 5:02:13 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
3/1/2024 4:53:16 PM
|
Submission request sent to Applicant
|
3/1/2024 4:52:49 PM
|
Submission request sent to Applicant
|
3/1/2024 4:52:29 PM
|
Submission Triaged
|
3/1/2024 1:28:34 PM
|
Submission received from Applicant
|
1/17/2024 12:12:07 PM
|
Request for Review Comments returned by Falcon School District 49
|
1/9/2024 12:27:15 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/5/2024 9:55:59 AM
|
Submission request sent to Applicant
|
1/5/2024 9:42:28 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/4/2024 5:27:05 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/4/2024 12:46:14 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
1/4/2024 11:14:48 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/3/2024 9:01:31 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/3/2024 7:47:23 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/2/2024 4:10:22 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/2/2024 3:06:34 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/2/2024 3:04:01 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/2/2024 1:49:58 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/28/2023 8:50:14 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/28/2023 2:29:05 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/21/2023 2:07:42 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/20/2023 9:03:47 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
12/15/2023 10:59:16 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/15/2023 10:35:13 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/15/2023 9:46:54 AM
|
Request for Review Comments returned by Woodmen Road Metro
|
12/13/2023 3:16:07 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/13/2023 11:49:21 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/12/2023 2:15:57 PM
|
Request for Review Comments returned by RBD Floodplain
|
12/12/2023 2:04:11 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
12/12/2023 2:04:09 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/12/2023 2:04:07 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Evelyn galanephillips on behalf of Falcon School District 49
|
12/12/2023 2:04:05 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Trent Harwig on behalf of Falcon Fire Protection District
|
12/12/2023 2:04:03 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
12/12/2023 2:04:01 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
12/12/2023 2:03:58 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/12/2023 2:03:56 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
12/12/2023 2:03:54 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
12/12/2023 2:03:52 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/12/2023 2:03:50 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Keith Curtis on behalf of RBD Floodplain
|
12/12/2023 2:03:48 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of Pikes Peak Regional Building Department
|
12/12/2023 2:03:46 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/12/2023 2:03:44 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
12/12/2023 2:03:42 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
12/12/2023 2:03:39 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:37 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:35 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:34 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:32 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:30 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:27 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:25 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:23 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:21 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
12/12/2023 2:03:19 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/12/2023 2:03:17 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
12/12/2023 2:03:15 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/12/2023 2:03:13 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of Parks Advisory Board
|
12/12/2023 2:03:11 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/12/2023 2:03:09 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/12/2023 2:03:07 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Christina Prete on behalf of EPC Stormwater Review
|
12/12/2023 2:03:05 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
12/12/2023 2:03:02 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
12/12/2023 2:03:01 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
12/12/2023 2:02:58 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of EPC Public Works, County Engineer
|
12/12/2023 2:02:56 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of EPC Public Works, County Engineer
|
12/12/2023 2:02:54 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by on behalf of EPC Parks Department
|
12/12/2023 2:02:52 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Mike McCarthy on behalf of EPC Health Department
|
12/12/2023 2:02:50 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Catherine McGarvy on behalf of EPC Health Department
|
12/12/2023 2:02:48 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by HEAEH LandUse on behalf of EPC Health Department
|
12/12/2023 2:02:46 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/12/2023 2:02:44 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Lori Seago on behalf of County Attorney - Water
|
12/12/2023 2:02:42 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by April Willie on behalf of County Attorney - Water
|
12/12/2023 2:02:40 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Lori Seago on behalf of County Attorney - Development Review
|
12/12/2023 2:02:38 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by April Willie on behalf of County Attorney - Development Review
|
12/12/2023 2:02:33 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Lupe Packman on behalf of PCD Engineering Division
|
12/12/2023 2:02:31 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/12/2023 2:02:29 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/12/2023 2:02:27 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Edward Schoenheit on behalf of PCD Engineering Division
|
12/12/2023 2:02:25 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
12/12/2023 2:02:24 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Charlene Durham on behalf of PCD Engineering Division
|
12/12/2023 2:02:22 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch North PUDSP for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
12/12/2023 10:09:38 AM
|
Fees paid: 12/12/2023 (Receipt: 1008615)
|
12/7/2023 4:25:33 PM
|
Payment Request sent: 12/7/2023
|
12/7/2023 4:25:25 PM
|
File # Assigned: PUDSP235
|
12/7/2023 4:24:45 PM
|
Submission Triaged
|
12/7/2023 9:25:42 AM
|
Submission received from Applicant
|
8/30/2023 8:56:47 AM
|
Submission request sent to Applicant
|
8/24/2023 7:55:47 AM
|
Submission request sent to Applicant
|
8/17/2023 4:06:40 PM
|
Submission request sent to Applicant
|
8/17/2023 4:06:24 PM
|
Project reopened for Review Comments
|
11/10/2022 12:00:00 AM
|
Project Closed
|
11/10/2022 12:00:00 AM
|
Project Expired one year after 11/10/2021 Submission Request 11/10/2022
|
11/10/2021 7:24:52 AM
|
Submission request sent to Applicant
|
11/10/2021 7:14:00 AM
|
EA Assigned: EA21205
|
11/9/2021 11:52:29 AM
|
Project Manager Assigned: Ryan Howser
|
11/9/2021 11:52:28 AM
|
Project Created
|