4/20/2023 12:29:29 PM
|
Project Closed
|
4/20/2023 12:29:29 PM
|
Project Approved: 4/20/2023
|
4/10/2023 7:16:06 AM
|
Submission Triaged
|
4/6/2023 5:21:00 PM
|
Submission received from Applicant
|
4/6/2023 12:04:54 PM
|
Submission request sent to Applicant
|
3/8/2023 11:50:09 AM
|
Submission Triaged
|
3/8/2023 11:37:31 AM
|
Submission received from Applicant
|
3/8/2023 10:45:28 AM
|
Submission request sent to Applicant
|
3/3/2023 1:00:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/3/2023 11:42:06 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/2/2023 7:16:37 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/2/2023 7:16:33 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/2/2023 7:14:00 AM
|
Submission Triaged
|
3/1/2023 5:40:35 PM
|
Submission received from Applicant
|
2/27/2023 7:33:33 AM
|
Submission request sent to Applicant
|
2/16/2023 7:37:40 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
2/16/2023 7:37:13 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/15/2023 5:19:44 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/10/2023 1:24:44 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
2/10/2023 1:24:40 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/25/2023 3:51:40 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/25/2023 9:04:45 AM
|
Submission Triaged
|
1/24/2023 5:38:29 PM
|
Submission received from Applicant
|
1/24/2023 8:41:29 AM
|
Submission request sent to Applicant
|
1/24/2023 8:41:05 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/20/2023 1:47:18 PM
|
Request for Review Comments returned by EPC Health Department
|
1/19/2023 4:41:16 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/19/2023 4:41:12 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/19/2023 4:40:23 PM
|
Submission Triaged
|
1/19/2023 4:06:05 PM
|
Submission received from Applicant
|
1/17/2023 12:11:58 PM
|
Submission request sent to Applicant
|
1/17/2023 12:10:41 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/17/2023 11:02:08 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/13/2023 2:54:35 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/9/2023 7:55:03 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/9/2023 7:54:59 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/9/2023 7:53:36 AM
|
Submission Triaged
|
1/6/2023 5:01:50 PM
|
Submission received from Applicant
|
1/4/2023 2:54:33 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/31/2022 6:57:02 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
12/21/2022 3:38:35 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/21/2022 1:49:48 PM
|
Submission request sent to Applicant
|
12/21/2022 1:48:54 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/21/2022 1:46:09 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/21/2022 1:46:08 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/21/2022 1:46:06 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/21/2022 1:46:05 PM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/21/2022 8:43:41 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/20/2022 8:36:30 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
12/20/2022 8:36:26 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/9/2022 8:43:32 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/6/2022 5:44:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/5/2022 10:39:17 AM
|
Request for Review Comments returned by EPC Environmental Services
|
12/5/2022 7:49:09 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
12/5/2022 7:49:08 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
12/5/2022 7:49:06 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/5/2022 7:49:05 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
12/5/2022 7:49:03 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
12/5/2022 7:49:02 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Dukes on behalf of Falcon School District 49
|
12/5/2022 7:49:01 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Peter Susemilh on behalf of Falcon Regional Trans Metro Dist
|
12/5/2022 7:49:00 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Robert Prather on behalf of Falcon Heights Property Owners Association
|
12/5/2022 7:48:58 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
12/5/2022 7:48:57 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
12/5/2022 7:48:55 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
12/5/2022 7:48:51 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
12/5/2022 7:48:49 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
12/5/2022 7:48:48 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/5/2022 7:48:46 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
12/5/2022 7:48:45 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Michael Diehl on behalf of Xcel Energy
|
12/5/2022 7:48:43 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/5/2022 7:48:41 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/5/2022 7:48:40 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/5/2022 7:48:39 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
12/5/2022 7:48:37 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by on behalf of EPC Parks Department
|
12/5/2022 7:48:36 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
12/5/2022 7:48:23 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/5/2022 7:48:22 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
12/5/2022 7:48:18 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/5/2022 7:43:26 AM
|
Submission Triaged
|
12/2/2022 4:16:03 PM
|
Submission received from Applicant
|
11/15/2022 2:55:09 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
9/30/2022 3:15:06 PM
|
Submission request sent to Applicant
|
9/30/2022 3:13:57 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/30/2022 12:47:07 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/26/2022 10:19:27 AM
|
Request for Review Comments returned by Woodmen Hills Metro
|
9/23/2022 9:12:01 AM
|
Request for Review Comments returned by EPC Parks Department
|
9/20/2022 4:02:39 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
9/20/2022 3:14:23 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
9/16/2022 8:03:18 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
9/15/2022 12:26:52 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/15/2022 6:10:17 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
9/14/2022 8:10:21 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/13/2022 7:04:43 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/12/2022 5:13:55 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/12/2022 7:56:48 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
9/7/2022 12:28:52 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
9/6/2022 10:24:48 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/6/2022 9:57:30 AM
|
Request for Review Comments returned by EPC Environmental Services
|
9/2/2022 11:45:02 AM
|
Request for Review Comments returned by Woodmen Road Metro
|
9/1/2022 2:32:50 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
8/31/2022 1:13:53 PM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/31/2022 7:04:52 AM
|
Submission Triaged
|
8/30/2022 4:24:02 PM
|
Submission received from Applicant
|
8/30/2022 2:37:06 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/30/2022 9:07:47 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
8/29/2022 4:57:18 PM
|
Submission request sent to Applicant
|
8/25/2022 11:30:09 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
8/25/2022 10:02:01 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
8/25/2022 10:02:00 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro
|
8/25/2022 10:01:59 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
8/25/2022 10:01:58 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
8/25/2022 10:01:57 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
8/25/2022 10:01:56 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
8/25/2022 10:01:55 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
8/25/2022 10:01:54 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
8/25/2022 10:01:53 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Dukes on behalf of Falcon School District 49
|
8/25/2022 10:01:52 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Peter Susemilh on behalf of Falcon Regional Trans Metro Dist
|
8/25/2022 10:01:51 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Robert Prather on behalf of Falcon Heights Property Owners Association
|
8/25/2022 10:01:50 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
8/25/2022 10:01:49 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
8/25/2022 10:01:48 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/25/2022 10:01:47 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
8/25/2022 10:01:46 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
8/25/2022 10:01:45 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
8/25/2022 10:01:43 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
8/25/2022 10:01:42 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Jeff Munger on behalf of Cherokee Metro Dist
|
8/25/2022 10:01:41 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
8/25/2022 10:01:39 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
8/25/2022 10:01:38 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
8/25/2022 10:01:37 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
8/25/2022 10:01:36 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
8/25/2022 10:01:35 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
8/25/2022 10:01:34 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
8/25/2022 10:01:33 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/25/2022 10:01:32 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
8/25/2022 10:01:30 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
8/25/2022 10:01:29 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
8/25/2022 10:01:28 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/25/2022 10:01:27 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/25/2022 10:01:26 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Michael Diehl on behalf of Xcel Energy
|
8/25/2022 10:01:25 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/25/2022 10:01:24 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
|
8/25/2022 10:01:23 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Bill Elder on behalf of EPC Sheriff's Department
|
8/25/2022 10:01:22 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
8/25/2022 10:01:22 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by on behalf of EPC Parks Department
|
8/25/2022 10:01:17 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
8/25/2022 10:01:14 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/25/2022 10:01:13 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/25/2022 10:01:12 AM
|
Request for Review Comments email sent for Project Jaynes Property Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/24/2022 4:26:43 PM
|
Fees paid: 8/24/2022 (Receipt: 1006840)
|
8/24/2022 4:18:56 PM
|
Payment Request sent: 8/24/2022
|
8/24/2022 4:18:56 PM
|
File # Assigned: SKP225
|
8/24/2022 4:18:53 PM
|
Submission Triaged
|
8/24/2022 1:16:08 PM
|
Submission received from Applicant
|
10/5/2021 3:01:04 PM
|
Submission request sent to Applicant
|
10/5/2021 7:15:03 AM
|
Project Manager Assigned: Kari Parsons
|
10/5/2021 7:15:03 AM
|
EA Assigned: EA21181
|
10/5/2021 7:15:03 AM
|
Project Created
|