9/11/2024 10:50:52 AM
|
Project Closed
|
9/11/2024 10:50:52 AM
|
Project Approved: 9/11/2024
|
9/11/2024 9:59:09 AM
|
Payment Request canceled: 9/11/2024
|
9/11/2024 9:08:22 AM
|
Payment Request sent: 9/11/2024
|
9/11/2024 8:48:48 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
9/4/2024 1:54:15 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of PCD Administrative Notice
|
9/4/2024 1:54:13 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Miranda Benson on behalf of PCD Administrative Notice
|
9/4/2024 1:52:54 PM
|
Project reopened for Review Comments
|
8/2/2024 9:54:04 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
7/29/2024 10:59:09 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/25/2024 7:18:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/17/2024 1:03:53 PM
|
Request for Review Comments sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
7/17/2024 1:02:58 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/17/2024 1:02:54 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
7/17/2024 1:00:23 PM
|
Submission Triaged
|
7/17/2024 12:18:39 PM
|
Submission received from Applicant
|
7/17/2024 7:36:58 AM
|
Submission request sent to Applicant
|
7/17/2024 7:35:57 AM
|
Submission Triaged
|
7/16/2024 7:45:36 PM
|
Submission received from Applicant
|
7/9/2024 11:10:15 AM
|
Submission request sent to Applicant
|
7/8/2024 2:37:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/2/2024 2:23:01 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/21/2024 1:22:05 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/21/2024 1:22:03 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Erika Keech on behalf of County Attorney - Development Review
|
6/21/2024 1:22:01 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
6/21/2024 1:21:57 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/21/2024 1:21:53 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
6/21/2024 1:19:05 PM
|
Submission Triaged
|
6/21/2024 12:58:59 PM
|
Submission received from Applicant
|
6/21/2024 12:56:21 PM
|
Submission request sent to Applicant
|
6/21/2024 12:55:58 PM
|
Submission Triaged
|
6/21/2024 12:43:58 PM
|
Submission received from Applicant
|
6/13/2024 2:04:48 PM
|
Submission request sent to Applicant
|
6/13/2024 12:52:19 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/11/2024 3:03:30 PM
|
Submission request sent to Applicant
|
6/11/2024 10:39:21 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/11/2024 9:33:52 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/30/2024 11:27:35 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Pikes Peak Regional Building Department
|
5/30/2024 11:27:33 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/30/2024 11:27:31 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Erika Keech on behalf of County Attorney - Development Review
|
5/30/2024 11:27:29 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
5/30/2024 11:27:25 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/30/2024 11:27:22 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
5/30/2024 11:23:44 AM
|
Submission Triaged
|
5/30/2024 8:53:51 AM
|
Submission received from Applicant
|
5/28/2024 3:27:17 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/28/2024 3:18:37 PM
|
Submission request sent to Applicant
|
5/28/2024 3:06:33 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/23/2024 2:54:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/16/2024 3:49:59 PM
|
Request for Review Comments sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/16/2024 3:48:43 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/16/2024 3:48:42 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/16/2024 3:48:40 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/16/2024 3:48:38 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Christina Prete on behalf of EPC Stormwater Review
|
5/16/2024 3:48:34 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/16/2024 3:48:30 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
5/16/2024 3:44:19 PM
|
Submission Triaged
|
5/16/2024 3:33:23 PM
|
Submission received from Applicant
|
5/15/2024 2:49:47 PM
|
Submission request sent to Applicant
|
5/14/2024 12:12:15 PM
|
Submission request sent to Applicant
|
5/14/2024 12:01:14 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/10/2024 4:13:10 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/2/2024 8:27:08 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/25/2024 11:34:44 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Pikes Peak Regional Building Department
|
4/25/2024 11:34:42 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
4/25/2024 11:34:41 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
4/25/2024 11:34:37 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/25/2024 11:34:33 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
4/25/2024 11:32:13 AM
|
Submission Triaged
|
4/25/2024 9:33:43 AM
|
Submission received from Applicant
|
4/23/2024 11:32:07 AM
|
Submission request sent to Applicant
|
4/23/2024 11:31:48 AM
|
Submission Triaged
|
4/23/2024 9:48:28 AM
|
Submission received from Applicant
|
4/9/2024 9:36:30 AM
|
Submission request sent to Applicant
|
4/8/2024 11:33:53 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/8/2024 11:29:27 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/2/2024 10:03:05 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/27/2024 3:00:49 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/27/2024 11:13:58 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/26/2024 10:01:16 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/26/2024 10:01:14 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
3/26/2024 9:59:57 AM
|
Submission Triaged
|
3/22/2024 6:26:40 PM
|
Submission received from Applicant
|
3/22/2024 2:57:24 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Pikes Peak Regional Building Department
|
3/22/2024 2:57:22 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
3/22/2024 2:57:20 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Jennifer Irvine on behalf of Road Impact Fee Administrator
|
3/22/2024 2:57:18 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/22/2024 2:57:16 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/22/2024 2:57:14 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Christina Prete on behalf of EPC Stormwater Review
|
3/22/2024 2:57:12 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/22/2024 2:57:10 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/22/2024 2:57:08 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
3/22/2024 2:57:05 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/22/2024 2:57:01 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
3/22/2024 2:53:19 PM
|
Submission request sent to Applicant
|
3/22/2024 2:46:21 PM
|
Submission Triaged
|
3/22/2024 1:37:19 PM
|
Submission received from Applicant
|
3/21/2024 4:56:41 PM
|
Submission request sent to Applicant
|
3/21/2024 4:56:30 PM
|
Submission Triaged
|
3/21/2024 12:02:21 PM
|
Submission received from Applicant
|
3/20/2024 9:37:31 AM
|
Submission request sent to Applicant
|
3/1/2024 7:20:09 AM
|
Submission request sent to Applicant
|
2/29/2024 5:30:43 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/29/2024 11:49:48 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/29/2024 10:45:52 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/28/2024 9:11:41 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/20/2024 1:17:35 PM
|
Request for Review Comments returned by EPC Environmental Services
|
2/20/2024 7:12:32 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/15/2024 4:02:29 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Pikes Peak Regional Building Department
|
2/15/2024 4:02:27 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/15/2024 4:02:25 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
2/15/2024 4:02:23 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/15/2024 4:02:21 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/15/2024 4:02:19 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Christina Prete on behalf of EPC Stormwater Review
|
2/15/2024 4:02:17 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/15/2024 4:02:15 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/15/2024 4:02:14 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by April Willie on behalf of County Attorney - Development Review
|
2/15/2024 4:02:10 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/15/2024 4:02:08 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
2/15/2024 3:55:55 PM
|
Submission Triaged
|
2/15/2024 3:35:00 PM
|
Submission received from Applicant
|
1/24/2024 5:03:39 PM
|
Submission request sent to Applicant
|
1/24/2024 3:29:56 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/23/2024 5:25:02 PM
|
Submission request sent to Applicant
|
1/23/2024 4:59:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/23/2024 4:06:42 PM
|
Request for Review Comments email resent for Project Saddlehorn Ranch Filing 3 for review by Engineering Manager on behalf of PCD Engineering Division
|
1/22/2024 10:53:08 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/22/2024 10:07:34 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/18/2024 7:10:48 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/12/2024 10:17:01 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/10/2024 12:56:22 PM
|
Submission Triaged
|
1/10/2024 11:52:37 AM
|
Submission received from Applicant
|
1/10/2024 11:41:18 AM
|
Submission request sent to Applicant
|
1/10/2024 6:51:23 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/9/2024 5:04:30 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by on behalf of Pikes Peak Regional Building Department
|
1/9/2024 5:04:28 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/9/2024 5:04:26 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/9/2024 5:04:24 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/9/2024 5:04:22 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/9/2024 5:04:20 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Christina Prete on behalf of EPC Stormwater Review
|
1/9/2024 5:04:17 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/9/2024 5:04:15 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Lori Seago on behalf of County Attorney - Development Review
|
1/9/2024 5:04:13 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by April Willie on behalf of County Attorney - Development Review
|
1/9/2024 5:04:09 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/9/2024 5:04:07 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Engineering Manager on behalf of PCD Engineering Division
|
1/9/2024 5:00:40 PM
|
Submission Triaged
|
1/9/2024 4:57:36 PM
|
Submission received from Applicant
|
1/9/2024 4:51:09 PM
|
Submission request sent to Applicant
|
1/9/2024 4:49:49 PM
|
Submission Triaged
|
1/9/2024 3:22:50 PM
|
Submission received from Applicant
|
11/21/2023 1:32:40 PM
|
Submission request sent to Applicant
|
11/14/2023 11:28:18 AM
|
Submission request sent to Applicant
|
11/9/2023 1:16:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/2/2023 5:06:57 PM
|
Submission request sent to Applicant
|
11/2/2023 8:45:55 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/30/2023 3:42:08 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/26/2023 2:21:51 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/26/2023 11:25:53 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/24/2023 8:22:35 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/23/2023 7:23:53 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/18/2023 11:14:49 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/17/2023 5:21:27 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/17/2023 5:21:23 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/17/2023 5:21:21 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/17/2023 5:21:14 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/17/2023 5:21:10 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/17/2023 5:21:07 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Lori Seago on behalf of County Attorney - Development Review
|
10/17/2023 5:21:01 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Ryan Howser on behalf of PCD Project Manager
|
10/17/2023 5:20:55 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 5:20:53 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 5:18:51 PM
|
Submission Triaged
|
10/17/2023 2:36:04 PM
|
Submission received from Applicant
|
10/6/2023 6:15:49 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
9/13/2023 12:08:12 PM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
6/29/2023 10:26:48 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/23/2023 4:27:20 PM
|
Submission request sent to Applicant
|
6/23/2023 4:26:39 PM
|
Submission request sent to Applicant
|
6/22/2023 11:54:03 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/22/2023 7:24:37 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/13/2023 8:24:47 AM
|
Submission request sent to Applicant
|
6/13/2023 8:19:02 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/12/2023 11:01:25 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/9/2023 11:24:27 AM
|
Request for Review Comments email resent for Project Saddlehorn Ranch Filing 3 (Major) for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
6/9/2023 10:14:11 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Edi Anderson on behalf of County Attorney - Water
|
6/8/2023 10:40:55 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/7/2023 5:19:45 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/7/2023 4:06:40 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/30/2023 12:58:52 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/24/2023 8:24:00 AM
|
Request for Review Comments returned by EPC Parks Department
|
5/23/2023 12:46:13 PM
|
Request for Review Comments returned by EPC Environmental Services
|
5/19/2023 1:54:05 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/19/2023 8:17:39 AM
|
Request for Review Comments returned by RBD Floodplain
|
5/19/2023 7:26:46 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Keith Curtis on behalf of RBD Floodplain
|
5/19/2023 7:26:45 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
5/19/2023 7:26:43 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
5/19/2023 7:26:42 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
5/19/2023 7:26:41 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Permits Program Manager Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
5/19/2023 7:26:35 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/19/2023 7:26:33 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by on behalf of EPC Parks Department
|
5/19/2023 7:26:32 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Kathy Andrew on behalf of EPC Environmental Services
|
5/19/2023 7:26:31 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Lori Seago on behalf of County Attorney - Development Review
|
5/19/2023 7:26:28 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Ryan Howser on behalf of PCD Project Manager
|
5/19/2023 7:26:25 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 (Major) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/19/2023 7:20:48 AM
|
Submission Triaged
|
5/18/2023 5:25:22 PM
|
Submission received from Applicant
|
5/18/2023 2:00:23 PM
|
Submission request sent to Applicant
|
5/18/2023 2:00:01 PM
|
Submission Triaged
|
5/18/2023 12:33:41 PM
|
Submission received from Applicant
|
4/11/2023 5:42:29 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
4/7/2023 12:41:46 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/31/2023 3:21:07 PM
|
Request for Review Comments returned by EPC Health Department
|
3/23/2023 8:42:12 AM
|
Submission request sent to Applicant
|
3/23/2023 8:39:41 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/23/2023 8:26:06 AM
|
Request for Review Comments email resent for Project Saddlehorn Ranch Filing 3 for review by Ryan Howser on behalf of PCD Project Manager
|
3/23/2023 7:45:36 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/22/2023 5:13:36 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/22/2023 11:36:17 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/19/2023 5:20:21 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
3/17/2023 3:51:47 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/17/2023 3:04:43 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/16/2023 7:42:28 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
3/16/2023 10:30:28 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/15/2023 1:29:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/14/2023 1:15:09 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/9/2023 11:10:46 AM
|
Request for Review Comments returned by Parks Advisory Board
|
3/7/2023 12:53:49 PM
|
Set Applicant to Vertex Consulting Services
|
3/7/2023 9:34:26 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
3/3/2023 3:27:55 PM
|
Request for Review Comments returned by Schriever AFB
|
3/2/2023 9:01:34 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
3/1/2023 11:19:12 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
2/28/2023 6:54:24 AM
|
Request for Review Comments returned by RBD Floodplain
|
2/27/2023 3:47:24 PM
|
Request for Review Comments returned by EPC Parks Department
|
2/27/2023 3:18:41 PM
|
Request for Review Comments email resent for Project Saddlehorn Ranch Filing 3 for review by Keith Curtis on behalf of RBD Floodplain
|
2/27/2023 2:04:40 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/27/2023 11:24:27 AM
|
Request for Review Comments returned by RBD Floodplain
|
2/27/2023 10:53:11 AM
|
Request for Review Comments email resent for Project Saddlehorn Ranch Filing 3 for review by Keith Curtis on behalf of RBD Floodplain
|
2/27/2023 8:55:43 AM
|
Request for Review Comments returned by RBD Floodplain
|
2/24/2023 11:32:10 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/24/2023 10:06:51 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/24/2023 8:39:54 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Darren Horstmeier on behalf of Schriever AFB
|
2/24/2023 8:39:53 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
2/24/2023 8:39:52 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
2/24/2023 8:39:51 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Elizabeth Dukes on behalf of Falcon School District 49
|
2/24/2023 8:39:50 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
2/24/2023 8:39:49 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
2/24/2023 8:39:47 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/24/2023 8:39:46 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
2/24/2023 8:39:44 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Pamela Davidson on behalf of Central CO Conservation District
|
2/24/2023 8:39:43 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
2/24/2023 8:39:42 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Keith Curtis on behalf of RBD Floodplain
|
2/24/2023 8:39:41 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
2/24/2023 8:39:40 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/24/2023 8:39:38 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
2/24/2023 8:39:37 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
2/24/2023 8:39:36 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
2/24/2023 8:39:35 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
2/24/2023 8:39:30 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
2/24/2023 8:39:29 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/24/2023 8:39:27 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
2/24/2023 8:39:24 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Colorado Department of Public Health and Environment
|
2/24/2023 8:39:23 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of Parks Advisory Board
|
2/24/2023 8:39:22 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/24/2023 8:39:19 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Bill Elder on behalf of EPC Sheriff's Department
|
2/24/2023 8:39:18 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Bill Elder on behalf of EPC Sheriff's Department
|
2/24/2023 8:39:17 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
2/24/2023 8:39:14 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by on behalf of EPC Parks Department
|
2/24/2023 8:39:13 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Catherine McGarvy on behalf of EPC Health Department
|
2/24/2023 8:39:05 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/24/2023 8:39:04 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Edi Anderson on behalf of County Attorney - Water
|
2/24/2023 8:39:03 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/24/2023 8:38:59 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Ryan Howser on behalf of PCD Project Manager
|
2/24/2023 8:38:58 AM
|
Request for Review Comments email sent for Project Saddlehorn Ranch Filing 3 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/23/2023 2:19:51 PM
|
Fees paid: 2/23/2023 (Receipt: 1007500)
|
2/10/2023 4:50:41 PM
|
Payment Request sent: 2/10/2023
|
2/10/2023 4:50:41 PM
|
File # Assigned: SF234
|
2/10/2023 4:50:36 PM
|
Submission Triaged
|
2/10/2023 12:48:27 PM
|
Submission received from Applicant
|
2/8/2023 4:45:19 PM
|
Submission request sent to Applicant
|
2/8/2023 4:44:43 PM
|
Submission Triaged
|
2/8/2023 11:45:44 AM
|
Submission received from Applicant
|
2/9/2022 3:05:49 PM
|
Submission request sent to Applicant
|
9/28/2021 10:11:22 AM
|
Project Manager Assigned: Ryan Howser
|
9/28/2021 10:11:22 AM
|
EA Assigned: EA21174
|
9/28/2021 10:11:22 AM
|
Project Created
|