Project Details

Search


File Number
U212
Project Name
EPC Mountain View Fiber Project Approval of Location
Description
Approval of location for huts for fiber regeneration.
Parcels
5214000006 5214000006 5324000025 5324000025
Applicant
MVEA
Steve Contorno ( steve.contorno@conexon.us ) Steve Contorno ( steve.contorno@conexon.us )
EA Number
EA21160
File Prefix
U - Utility Location
Year
2021
Project Manager
Ryan Howser
Status
Closed
Created
9/7/2021 8:41:48 AM

View: Review Comments



Additional Documents (5)

Link Document Comment
View PC Staff Report with Attachments
View PC Staff Report with Attachments with revised LOI
View PC Approval Letter
View Shoppers Press Confirmation Published 11/3/2021
View Recorded PC Resolution


Review Documents (9)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 10/22/2021 12:50:39 PM
View Application/Petition Form 10/22/2021 12:50:40 PM
View Building Plan 10/26/2021 1:40:32 PM
View Elevation drawing 10/26/2021 1:52:58 PM
View Legal description 10/26/2021 1:51:27 PM
View Letter of intent 11/23/2021 5:55:22 PM
View Mineral rights 10/26/2021 1:51:54 PM
View Plot Plan 10/26/2021 1:53:52 PM
View Vicinity Map 10/26/2021 1:53:53 PM



Events (225)

Date Comment
12/17/2021 9:44:23 AM Project Closed
12/17/2021 9:44:23 AM Project Approved: 12/17/2021
12/3/2021 4:51:19 PM Request for Review Comments returned by EPC Health Department
11/24/2021 7:29:17 AM Submission Triaged
11/23/2021 5:55:35 PM Submission received from Applicant
11/18/2021 11:52:25 AM Submission request sent to Applicant
11/17/2021 12:39:59 PM Request for Review Comments returned by US Postal Service
11/14/2021 6:48:16 AM Request for Review Comments returned by Meadow Lake Airport Association
11/12/2021 8:08:17 AM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/10/2021 12:50:45 PM Request for Review Comments returned by PCD Engineering Division
11/10/2021 12:27:10 PM Request for Review Comments email resent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/10/2021 8:40:31 AM Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
11/10/2021 8:05:37 AM Request for Review Comments returned by Schriever AFB
11/9/2021 4:55:18 PM Request for Review Comments returned by PCD Project Manager
11/9/2021 2:44:43 PM Request for Review Comments returned by Falcon Highlands Metro
11/9/2021 1:51:14 PM Request for Review Comments returned by Falcon Fire Protection District
11/9/2021 1:29:08 PM Request for Review Comments returned by PCD Engineering Division
11/9/2021 1:25:20 PM Request for Review Comments returned by EPC Stormwater Review
11/9/2021 10:49:46 AM Request for Review Comments returned by Cherokee Metro Dist
11/8/2021 4:23:00 PM Request for Review Comments returned by Pikes Peak Regional Building Department
11/8/2021 3:59:35 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
11/8/2021 11:32:21 AM Request for Review Comments returned by Widefield SD 3
11/5/2021 1:41:43 PM Request for Review Comments returned by Colorado Springs Public Works
11/4/2021 11:25:13 AM Request for Review Comments returned by Colorado State Forest Service
11/3/2021 11:33:12 AM Request for Review Comments returned by Fountain
11/3/2021 11:12:06 AM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
11/3/2021 7:11:53 AM Request for Review Comments returned by Woodmoor Water and Sanitation District
11/2/2021 3:32:13 PM Request for Review Comments returned by Parks Advisory Board
11/2/2021 3:24:30 PM Request for Review Comments returned by County Attorney - Development Review
11/2/2021 2:08:01 PM Request for Review Comments returned by EPC Parks Department
11/2/2021 1:07:56 PM Request for Review Comments returned by Fountain Ft. Carson SD 8
11/2/2021 11:50:26 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/1/2021 11:46:22 AM Request for Review Comments returned by Black Forest Land Use Committee
11/1/2021 7:53:15 AM Request for Review Comments returned by Academy SD 20 Building Fund
11/1/2021 7:24:04 AM Request for Review Comments returned by Woodmen Hills Metro
10/29/2021 10:03:02 AM Request for Review Comments returned by EPC Environmental Services
10/28/2021 3:16:33 PM Request for Review Comments returned by Woodmen Road Metro
10/28/2021 3:15:52 PM Request for Review Comments returned by Woodmen Heights Metro Dist
10/28/2021 3:15:32 PM Request for Review Comments returned by Central Marksheffel Metro
10/28/2021 3:15:13 PM Request for Review Comments returned by Bradley Heights Metro Dist
10/28/2021 3:13:57 PM Request for Review Comments returned by Bent Grass Metro
10/28/2021 12:49:11 PM Request for Review Comments returned by USAFA Base Planner
10/28/2021 8:07:32 AM Request for Review Comments returned by El Paso County Conservation Dist
10/27/2021 1:55:03 PM Request for Review Comments returned by CIG Colorado Interstate Gas
10/27/2021 11:21:08 AM Request for Review Comments returned by Paint Brush Hills Metro
10/27/2021 9:14:58 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/26/2021 3:35:41 PM Request for Review Comments returned by Lewis Palmer 38
10/26/2021 2:50:44 PM Request for Review Comments returned by Black Forest Fire Protection District
10/26/2021 2:29:56 PM Request for Review Comments returned by RBD Floodplain
10/26/2021 2:27:06 PM Request for Review Comments returned by Ellicott Fire Protection District
10/26/2021 2:22:33 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
10/26/2021 2:22:31 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Administrator/Mgr on behalf of Woodmoor Improvement Association
10/26/2021 2:22:29 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
10/26/2021 2:22:27 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jerry Jacobson on behalf of Woodmen Hills Metro
10/26/2021 2:22:25 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Woodmen Heights Metro Dist
10/26/2021 2:22:23 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Warren on behalf of Wolf Ranch
10/26/2021 2:22:21 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by K. Sean Allen on behalf of Willow Springs Ranch Metro Dist
10/26/2021 2:22:19 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Hamel on behalf of Wildwood Village
10/26/2021 2:22:16 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Gary Smith on behalf of Wigwam Mutual Water Co
10/26/2021 2:22:13 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Brandon Bernard on behalf of Widefield Water & San
10/26/2021 2:22:10 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by COO Dave Gish on behalf of Widefield SD 3
10/26/2021 2:22:08 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joe Nardis on behalf of Westmoor Water & San
10/26/2021 2:22:06 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Eric Hemingway on behalf of Waterview Metropolitan Districts 1-2
10/26/2021 2:22:04 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Waterview 1 Metro
10/26/2021 2:22:01 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ellen Ellson on behalf of Walden Water & Sanitation District
10/26/2021 2:21:59 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Walden Metropolitan Districts 1 and 2
10/26/2021 2:21:57 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kevin Walker on behalf of Ventana Metro Dist
10/26/2021 2:21:55 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Dukes on behalf of USAFA Base Planner
10/26/2021 2:21:53 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Office Mgr Tracy Doran on behalf of Upper Big Sandy GWMD
10/26/2021 2:21:51 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Harold Noonan on behalf of U.S. Department of the Army/Fort Carson
10/26/2021 2:21:49 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jimmy Potts on behalf of Turkey Canon Ranch Water Dist
10/26/2021 2:21:47 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Mcgrady on behalf of Triview Metropolitan District
10/26/2021 2:21:45 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
10/26/2021 2:21:42 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Division Chief Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
10/26/2021 2:21:40 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Stanwood on behalf of Tri-County Fire Protection District
10/26/2021 2:21:38 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Alan Pogue on behalf of Sunset Metropolitan District
10/26/2021 2:21:36 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager Kevin Niles on behalf of Stratmoor Hills Water & San
10/26/2021 2:21:34 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Fire Marshal Mark Stanwood on behalf of Stratmoor HIlls Fire Department
10/26/2021 2:21:32 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Pesicka on behalf of Stratmoor Hills
10/26/2021 2:21:30 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
10/26/2021 2:21:28 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Contact on behalf of Springs East Airport
10/26/2021 2:21:26 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Hart Wright on behalf of Southwestern Hwy 115 Fire Protection District
10/26/2021 2:21:24 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
10/26/2021 2:21:22 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Davis on behalf of Security Water District
10/26/2021 2:21:20 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Roy Heald on behalf of Security Water & Sanitation District
10/26/2021 2:21:18 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jay Adriansen on behalf of Security Sanitation District
10/26/2021 2:21:16 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Security Fire Protection District
10/26/2021 2:21:14 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Darren Horstmeier on behalf of Schriever AFB
10/26/2021 2:21:11 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by MaryAnn McGeady on behalf of Santa Fe Springs Metro Dists 3
10/26/2021 2:21:09 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by MaryAnn McGeady on behalf of Santa Fe Springs Metro Dists 2
10/26/2021 2:21:07 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Greher on behalf of Sanctuary Metropolitan District
10/26/2021 2:21:05 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Laurel Vickers on behalf of Sage Water Users Association
10/26/2021 2:21:02 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Ankele on behalf of Rolling Hills Ranch Metro
10/26/2021 2:21:00 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David O'Leary on behalf of Rock Springs Ranch Metropolitan District 1-3
10/26/2021 2:20:58 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dist. Mgr. David Peak on behalf of Rock Springs Metro Dist
10/26/2021 2:20:55 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kathy Olson on behalf of Rock Creek Mesa Water Dist
10/26/2021 2:20:53 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ted Kerr on behalf of Red Rock Valley Metro Water Dist
10/26/2021 2:20:51 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joan Armstrong on behalf of Pueblo County Planning
10/26/2021 2:20:48 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Henley on behalf of Prairie Estates
10/26/2021 2:20:45 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ann Nichols on behalf of Pinon Pines Metro
10/26/2021 2:20:43 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
10/26/2021 2:20:41 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Debbie Debaun on behalf of Peyton Pines
10/26/2021 2:20:39 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Patrick Palacol on behalf of Peyton Fire Protection District
10/26/2021 2:20:37 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Assistant Superintendent Tim Kistler on behalf of Peyton 23
10/26/2021 2:20:35 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mr. Michael Shafer on behalf of Peterson AFB
10/26/2021 2:20:33 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Feller on behalf of Peaceful Valley Lake Estates HOA
10/26/2021 2:20:30 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pam Sekac on behalf of Park Forest Water Dist
10/26/2021 2:20:28 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Donna Dee on behalf of Paradise Villas
10/26/2021 2:20:26 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ast. Chief Colbin on behalf of Palmer Lake Volunteer Fire Department
10/26/2021 2:20:24 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Becky Orcutt on behalf of Palmer Lake Sanitation
10/26/2021 2:20:22 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Jack on behalf of Palmer Lake Mobile Home Ranch
10/26/2021 2:20:19 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Bass on behalf of Palmer Lake
10/26/2021 2:20:16 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Robert Guevara on behalf of Paint Brush Hills Metro
10/26/2021 2:20:14 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
10/26/2021 2:20:11 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Russell Dyskstra on behalf of Norris Ranch Metropolitan Districts Nos. 1 & 2
10/26/2021 2:20:09 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Meggan Herrington on behalf of Monument
10/26/2021 2:20:07 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
10/26/2021 2:20:05 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dave Elliott on behalf of Meadow Lake Airport Association
10/26/2021 2:20:03 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by James Heckman on behalf of Lower Fountain Metropolitan Sewage Disposal District
10/26/2021 2:20:01 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Don Higbee on behalf of Lower Arkansas Water Management Association
10/26/2021 2:19:58 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jeff Mark on behalf of Lorson Ranch Metro
10/26/2021 2:19:56 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Vicki Wood on behalf of Lewis Palmer 38
10/26/2021 2:19:54 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Latigo Creek Metro District
10/26/2021 2:19:52 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Steve Sheffield on behalf of Lake of the Rockis Metropolitan District
10/26/2021 2:19:50 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jackie Evans on behalf of Kiowa Conservation Dist
10/26/2021 2:19:48 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Wilsey on behalf of Harrison SD 2
10/26/2021 2:19:46 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Grant Schmidt on behalf of Hanover SD 28
10/26/2021 2:19:43 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Hanover Fire Protection District
10/26/2021 2:19:41 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Thomas Wiersma on behalf of Ft. Carson, Directorate of Public Works, Master Planning
10/26/2021 2:19:39 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Brian Matise on behalf of Four Way Ranch Metro
10/26/2021 2:19:37 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joel Stahn on behalf of Fountain Valley Power
10/26/2021 2:19:35 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Renee Schroeder on behalf of Fountain Valley Authority
10/26/2021 2:19:33 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by James Heckman on behalf of Fountain Sanitation District
10/26/2021 2:19:31 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Leslie Haren-Friesz on behalf of Fountain Ft. Carson SD 8
10/26/2021 2:19:29 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Gates on behalf of Fountain Fire Department
10/26/2021 2:19:27 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kristy Martinez on behalf of Fountain
10/26/2021 2:19:24 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ann Nichols on behalf of Forest Lakes Metro
10/26/2021 2:19:22 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Melissa Andrews on behalf of Falcon School District 49
10/26/2021 2:19:20 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemilh on behalf of Falcon Regional Trans Metro Dist
10/26/2021 2:19:18 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Josh Miller on behalf of Falcon Highlands Metro
10/26/2021 2:19:16 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
10/26/2021 2:19:14 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cindy DeYoung on behalf of Falcon Broadband
10/26/2021 2:19:12 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Cromwell on behalf of Ellicott Utilities (does area that was Sunset Metro)
10/26/2021 2:19:10 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Lisa Johnson on behalf of Ellicott Town Center Metropolitan District
10/26/2021 2:19:07 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chris Smith on behalf of Ellicott SD 22
10/26/2021 2:19:05 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bookkeeper Peggy Current on behalf of Ellicott Metro
10/26/2021 2:19:04 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Henley on behalf of Ellicott Fire Protection District
10/26/2021 2:19:01 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kyle Fenner on behalf of Elbert County Government
10/26/2021 2:18:59 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by John Paget on behalf of El Paso County Fire Marshall
10/26/2021 2:18:57 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
10/26/2021 2:18:55 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Anderson on behalf of Edison Volunteer Fire Department
10/26/2021 2:18:53 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pat Bershinsky on behalf of Edison SD 54
10/26/2021 2:18:51 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Douglas County on behalf of Douglas County Planning
10/26/2021 2:18:48 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager on behalf of Double El Conservation Dist northeast EPC
10/26/2021 2:18:46 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Vern Champlin on behalf of Donald Wescott Fire Protection District
10/26/2021 2:18:44 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Parker on behalf of Donala Water and San Dist
10/26/2021 2:18:42 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/26/2021 2:18:40 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Terry Johns on behalf of Colorado Springs SD 11
10/26/2021 2:18:38 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rae Carlson on behalf of Colorado Springs Public Works
10/26/2021 2:18:36 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
10/26/2021 2:18:34 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
10/26/2021 2:18:32 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Al Testa on behalf of Colorado Centre Metro(includes Cuchares Ranch sub.)
10/26/2021 2:18:30 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Heather on behalf of City of Fountain Electric
10/26/2021 2:18:28 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
10/26/2021 2:18:26 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
10/26/2021 2:18:24 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jeff Munger on behalf of Cherokee Metro Dist
10/26/2021 2:18:22 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bea Romero on behalf of CenturyLink
10/26/2021 2:18:19 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Central Marksheffel Metro
10/26/2021 2:18:17 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pamela Davidson on behalf of Central CO Conservation District
10/26/2021 2:18:15 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bart Atkinson on behalf of Cathedral Pines Metro
10/26/2021 2:18:13 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Warren on behalf of Cathedral Pines
10/26/2021 2:18:11 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Miller on behalf of Calhan SD RJ1
10/26/2021 2:18:09 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Shane Gattis on behalf of Calhan Fire Protection District
10/26/2021 2:18:07 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cindy Tompkins on behalf of Calhan
10/26/2021 2:18:05 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Bradley Heights Metro Dist
10/26/2021 2:18:03 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dave Griser on behalf of Bobcat Meadows Metro
10/26/2021 2:18:01 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joe Valdez on behalf of Black Hills Energy-Aquila
10/26/2021 2:17:58 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cheryl Pixley on behalf of Black Forest Trails Association
10/26/2021 2:17:55 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Terry Stokka on behalf of Black Forest Land Use Committee
10/26/2021 2:17:53 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
10/26/2021 2:17:51 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Steve Wilson on behalf of Big Sandy SD 100 J
10/26/2021 2:17:49 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chief John Hillmann on behalf of Big Sandy Fire Protection District
10/26/2021 2:17:47 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Bent Grass Metro
10/26/2021 2:17:45 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer Irvine on behalf of Baptist Road Rural Trans Authority
10/26/2021 2:17:43 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Anthony Pastorello on behalf of Academy Water & Sanitation
10/26/2021 2:17:41 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
10/26/2021 2:17:38 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
10/26/2021 2:17:36 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Keith Curtis on behalf of RBD Floodplain
10/26/2021 2:17:34 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
10/26/2021 2:17:32 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
10/26/2021 2:17:30 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/26/2021 2:17:28 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elaine Kelly on behalf of US Postal Service
10/26/2021 2:17:26 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
10/26/2021 2:17:24 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
10/26/2021 2:17:22 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
10/26/2021 2:17:20 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
10/26/2021 2:17:17 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Tim Kroening on behalf of Colorado Parks and Wildlife
10/26/2021 2:17:14 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
10/26/2021 2:17:12 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Colorado Department of Public Health and Environment
10/26/2021 2:17:10 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Winsome Metropolitan District
10/26/2021 2:17:08 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Diehl on behalf of Xcel Energy
10/26/2021 2:17:05 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Parks Advisory Board
10/26/2021 2:17:03 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/26/2021 2:17:01 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bill Elder on behalf of EPC Sheriff's Department
10/26/2021 2:16:59 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bill Elder on behalf of EPC Sheriff's Department
10/26/2021 2:16:57 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
10/26/2021 2:16:55 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of EPC Parks Department
10/26/2021 2:16:53 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Catherine McGarvy on behalf of EPC Health Department
10/26/2021 2:16:36 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Schanel on behalf of EPC Fire Marshal
10/26/2021 2:16:34 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kathy Andrew on behalf of EPC Environmental Services
10/26/2021 2:16:31 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Lori Seago on behalf of County Attorney - Development Review
10/26/2021 2:16:29 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ryan Howser on behalf of PCD Project Manager
10/26/2021 2:16:27 PM Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/22/2021 3:35:52 PM Fees paid: 10/22/2021 (Receipt: 1005285)
10/22/2021 3:20:14 PM Payment Request sent: 10/22/2021
10/22/2021 3:18:06 PM Submission request canceled
10/22/2021 10:23:46 AM File # Assigned: U212
10/19/2021 4:50:42 PM Submission request sent to Applicant
10/19/2021 4:50:28 PM Submission Triaged
10/19/2021 1:43:45 PM Submission received from Applicant
10/15/2021 3:46:16 PM Submission request sent to Applicant
10/13/2021 9:13:34 AM Submission request sent to Applicant
9/7/2021 8:41:54 AM Project Manager Assigned: Ryan Howser
9/7/2021 8:41:54 AM EA Assigned: EA21160
9/7/2021 8:41:54 AM Project Created