12/17/2021 9:44:23 AM
|
Project Closed
|
12/17/2021 9:44:23 AM
|
Project Approved: 12/17/2021
|
12/3/2021 4:51:19 PM
|
Request for Review Comments returned by EPC Health Department
|
11/24/2021 7:29:17 AM
|
Submission Triaged
|
11/23/2021 5:55:35 PM
|
Submission received from Applicant
|
11/18/2021 11:52:25 AM
|
Submission request sent to Applicant
|
11/17/2021 12:39:59 PM
|
Request for Review Comments returned by US Postal Service
|
11/14/2021 6:48:16 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
11/12/2021 8:08:17 AM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/10/2021 12:50:45 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/10/2021 12:27:10 PM
|
Request for Review Comments email resent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/10/2021 8:40:31 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
11/10/2021 8:05:37 AM
|
Request for Review Comments returned by Schriever AFB
|
11/9/2021 4:55:18 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/9/2021 2:44:43 PM
|
Request for Review Comments returned by Falcon Highlands Metro
|
11/9/2021 1:51:14 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
11/9/2021 1:29:08 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/9/2021 1:25:20 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/9/2021 10:49:46 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
11/8/2021 4:23:00 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/8/2021 3:59:35 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
11/8/2021 11:32:21 AM
|
Request for Review Comments returned by Widefield SD 3
|
11/5/2021 1:41:43 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
11/4/2021 11:25:13 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
11/3/2021 11:33:12 AM
|
Request for Review Comments returned by Fountain
|
11/3/2021 11:12:06 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/3/2021 7:11:53 AM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
11/2/2021 3:32:13 PM
|
Request for Review Comments returned by Parks Advisory Board
|
11/2/2021 3:24:30 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/2/2021 2:08:01 PM
|
Request for Review Comments returned by EPC Parks Department
|
11/2/2021 1:07:56 PM
|
Request for Review Comments returned by Fountain Ft. Carson SD 8
|
11/2/2021 11:50:26 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/1/2021 11:46:22 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
11/1/2021 7:53:15 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
11/1/2021 7:24:04 AM
|
Request for Review Comments returned by Woodmen Hills Metro
|
10/29/2021 10:03:02 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/28/2021 3:16:33 PM
|
Request for Review Comments returned by Woodmen Road Metro
|
10/28/2021 3:15:52 PM
|
Request for Review Comments returned by Woodmen Heights Metro Dist
|
10/28/2021 3:15:32 PM
|
Request for Review Comments returned by Central Marksheffel Metro
|
10/28/2021 3:15:13 PM
|
Request for Review Comments returned by Bradley Heights Metro Dist
|
10/28/2021 3:13:57 PM
|
Request for Review Comments returned by Bent Grass Metro
|
10/28/2021 12:49:11 PM
|
Request for Review Comments returned by USAFA Base Planner
|
10/28/2021 8:07:32 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
10/27/2021 1:55:03 PM
|
Request for Review Comments returned by CIG Colorado Interstate Gas
|
10/27/2021 11:21:08 AM
|
Request for Review Comments returned by Paint Brush Hills Metro
|
10/27/2021 9:14:58 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/26/2021 3:35:41 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
10/26/2021 2:50:44 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
10/26/2021 2:29:56 PM
|
Request for Review Comments returned by RBD Floodplain
|
10/26/2021 2:27:06 PM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
10/26/2021 2:22:33 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
10/26/2021 2:22:31 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Administrator/Mgr on behalf of Woodmoor Improvement Association
|
10/26/2021 2:22:29 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Woodmen Road Metro
|
10/26/2021 2:22:27 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jerry Jacobson on behalf of Woodmen Hills Metro
|
10/26/2021 2:22:25 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Woodmen Heights Metro Dist
|
10/26/2021 2:22:23 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Warren on behalf of Wolf Ranch
|
10/26/2021 2:22:21 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by K. Sean Allen on behalf of Willow Springs Ranch Metro Dist
|
10/26/2021 2:22:19 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Hamel on behalf of Wildwood Village
|
10/26/2021 2:22:16 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Gary Smith on behalf of Wigwam Mutual Water Co
|
10/26/2021 2:22:13 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Brandon Bernard on behalf of Widefield Water & San
|
10/26/2021 2:22:10 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by COO Dave Gish on behalf of Widefield SD 3
|
10/26/2021 2:22:08 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joe Nardis on behalf of Westmoor Water & San
|
10/26/2021 2:22:06 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Eric Hemingway on behalf of Waterview Metropolitan Districts 1-2
|
10/26/2021 2:22:04 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Waterview 1 Metro
|
10/26/2021 2:22:01 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ellen Ellson on behalf of Walden Water & Sanitation District
|
10/26/2021 2:21:59 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Walden Metropolitan Districts 1 and 2
|
10/26/2021 2:21:57 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kevin Walker on behalf of Ventana Metro Dist
|
10/26/2021 2:21:55 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Dukes on behalf of USAFA Base Planner
|
10/26/2021 2:21:53 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Office Mgr Tracy Doran on behalf of Upper Big Sandy GWMD
|
10/26/2021 2:21:51 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Harold Noonan on behalf of U.S. Department of the Army/Fort Carson
|
10/26/2021 2:21:49 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jimmy Potts on behalf of Turkey Canon Ranch Water Dist
|
10/26/2021 2:21:47 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Mcgrady on behalf of Triview Metropolitan District
|
10/26/2021 2:21:45 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
|
10/26/2021 2:21:42 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Division Chief Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
10/26/2021 2:21:40 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Stanwood on behalf of Tri-County Fire Protection District
|
10/26/2021 2:21:38 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Alan Pogue on behalf of Sunset Metropolitan District
|
10/26/2021 2:21:36 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager Kevin Niles on behalf of Stratmoor Hills Water & San
|
10/26/2021 2:21:34 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Fire Marshal Mark Stanwood on behalf of Stratmoor HIlls Fire Department
|
10/26/2021 2:21:32 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Pesicka on behalf of Stratmoor Hills
|
10/26/2021 2:21:30 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
10/26/2021 2:21:28 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Contact on behalf of Springs East Airport
|
10/26/2021 2:21:26 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Hart Wright on behalf of Southwestern Hwy 115 Fire Protection District
|
10/26/2021 2:21:24 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
10/26/2021 2:21:22 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Davis on behalf of Security Water District
|
10/26/2021 2:21:20 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Roy Heald on behalf of Security Water & Sanitation District
|
10/26/2021 2:21:18 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jay Adriansen on behalf of Security Sanitation District
|
10/26/2021 2:21:16 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Security Fire Protection District
|
10/26/2021 2:21:14 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Darren Horstmeier on behalf of Schriever AFB
|
10/26/2021 2:21:11 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by MaryAnn McGeady on behalf of Santa Fe Springs Metro Dists 3
|
10/26/2021 2:21:09 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by MaryAnn McGeady on behalf of Santa Fe Springs Metro Dists 2
|
10/26/2021 2:21:07 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Greher on behalf of Sanctuary Metropolitan District
|
10/26/2021 2:21:05 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Laurel Vickers on behalf of Sage Water Users Association
|
10/26/2021 2:21:02 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Ankele on behalf of Rolling Hills Ranch Metro
|
10/26/2021 2:21:00 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David O'Leary on behalf of Rock Springs Ranch Metropolitan District 1-3
|
10/26/2021 2:20:58 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dist. Mgr. David Peak on behalf of Rock Springs Metro Dist
|
10/26/2021 2:20:55 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kathy Olson on behalf of Rock Creek Mesa Water Dist
|
10/26/2021 2:20:53 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ted Kerr on behalf of Red Rock Valley Metro Water Dist
|
10/26/2021 2:20:51 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joan Armstrong on behalf of Pueblo County Planning
|
10/26/2021 2:20:48 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Henley on behalf of Prairie Estates
|
10/26/2021 2:20:45 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ann Nichols on behalf of Pinon Pines Metro
|
10/26/2021 2:20:43 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
10/26/2021 2:20:41 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Debbie Debaun on behalf of Peyton Pines
|
10/26/2021 2:20:39 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Patrick Palacol on behalf of Peyton Fire Protection District
|
10/26/2021 2:20:37 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Assistant Superintendent Tim Kistler on behalf of Peyton 23
|
10/26/2021 2:20:35 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mr. Michael Shafer on behalf of Peterson AFB
|
10/26/2021 2:20:33 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Feller on behalf of Peaceful Valley Lake Estates HOA
|
10/26/2021 2:20:30 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pam Sekac on behalf of Park Forest Water Dist
|
10/26/2021 2:20:28 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Donna Dee on behalf of Paradise Villas
|
10/26/2021 2:20:26 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ast. Chief Colbin on behalf of Palmer Lake Volunteer Fire Department
|
10/26/2021 2:20:24 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Becky Orcutt on behalf of Palmer Lake Sanitation
|
10/26/2021 2:20:22 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by David Jack on behalf of Palmer Lake Mobile Home Ranch
|
10/26/2021 2:20:19 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by William Bass on behalf of Palmer Lake
|
10/26/2021 2:20:16 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Robert Guevara on behalf of Paint Brush Hills Metro
|
10/26/2021 2:20:14 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/26/2021 2:20:11 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Russell Dyskstra on behalf of Norris Ranch Metropolitan Districts Nos. 1 & 2
|
10/26/2021 2:20:09 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Meggan Herrington on behalf of Monument
|
10/26/2021 2:20:07 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
10/26/2021 2:20:05 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
10/26/2021 2:20:03 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by James Heckman on behalf of Lower Fountain Metropolitan Sewage Disposal District
|
10/26/2021 2:20:01 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Don Higbee on behalf of Lower Arkansas Water Management Association
|
10/26/2021 2:19:58 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jeff Mark on behalf of Lorson Ranch Metro
|
10/26/2021 2:19:56 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Vicki Wood on behalf of Lewis Palmer 38
|
10/26/2021 2:19:54 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemihl on behalf of Latigo Creek Metro District
|
10/26/2021 2:19:52 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Steve Sheffield on behalf of Lake of the Rockis Metropolitan District
|
10/26/2021 2:19:50 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jackie Evans on behalf of Kiowa Conservation Dist
|
10/26/2021 2:19:48 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Wilsey on behalf of Harrison SD 2
|
10/26/2021 2:19:46 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Grant Schmidt on behalf of Hanover SD 28
|
10/26/2021 2:19:43 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Hanover Fire Protection District
|
10/26/2021 2:19:41 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Thomas Wiersma on behalf of Ft. Carson, Directorate of Public Works, Master Planning
|
10/26/2021 2:19:39 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Brian Matise on behalf of Four Way Ranch Metro
|
10/26/2021 2:19:37 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joel Stahn on behalf of Fountain Valley Power
|
10/26/2021 2:19:35 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Renee Schroeder on behalf of Fountain Valley Authority
|
10/26/2021 2:19:33 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by James Heckman on behalf of Fountain Sanitation District
|
10/26/2021 2:19:31 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Leslie Haren-Friesz on behalf of Fountain Ft. Carson SD 8
|
10/26/2021 2:19:29 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Gates on behalf of Fountain Fire Department
|
10/26/2021 2:19:27 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kristy Martinez on behalf of Fountain
|
10/26/2021 2:19:24 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ann Nichols on behalf of Forest Lakes Metro
|
10/26/2021 2:19:22 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Melissa Andrews on behalf of Falcon School District 49
|
10/26/2021 2:19:20 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Peter Susemilh on behalf of Falcon Regional Trans Metro Dist
|
10/26/2021 2:19:18 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Josh Miller on behalf of Falcon Highlands Metro
|
10/26/2021 2:19:16 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
10/26/2021 2:19:14 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cindy DeYoung on behalf of Falcon Broadband
|
10/26/2021 2:19:12 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Richard Cromwell on behalf of Ellicott Utilities (does area that was Sunset Metro)
|
10/26/2021 2:19:10 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Lisa Johnson on behalf of Ellicott Town Center Metropolitan District
|
10/26/2021 2:19:07 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chris Smith on behalf of Ellicott SD 22
|
10/26/2021 2:19:05 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bookkeeper Peggy Current on behalf of Ellicott Metro
|
10/26/2021 2:19:04 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Henley on behalf of Ellicott Fire Protection District
|
10/26/2021 2:19:01 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kyle Fenner on behalf of Elbert County Government
|
10/26/2021 2:18:59 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by John Paget on behalf of El Paso County Fire Marshall
|
10/26/2021 2:18:57 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
10/26/2021 2:18:55 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Anderson on behalf of Edison Volunteer Fire Department
|
10/26/2021 2:18:53 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pat Bershinsky on behalf of Edison SD 54
|
10/26/2021 2:18:51 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Douglas County on behalf of Douglas County Planning
|
10/26/2021 2:18:48 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by District Manager on behalf of Double El Conservation Dist northeast EPC
|
10/26/2021 2:18:46 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Vern Champlin on behalf of Donald Wescott Fire Protection District
|
10/26/2021 2:18:44 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mark Parker on behalf of Donala Water and San Dist
|
10/26/2021 2:18:42 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/26/2021 2:18:40 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Terry Johns on behalf of Colorado Springs SD 11
|
10/26/2021 2:18:38 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rae Carlson on behalf of Colorado Springs Public Works
|
10/26/2021 2:18:36 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
10/26/2021 2:18:34 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
10/26/2021 2:18:32 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Al Testa on behalf of Colorado Centre Metro(includes Cuchares Ranch sub.)
|
10/26/2021 2:18:30 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Heather on behalf of City of Fountain Electric
|
10/26/2021 2:18:28 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
10/26/2021 2:18:26 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
|
10/26/2021 2:18:24 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jeff Munger on behalf of Cherokee Metro Dist
|
10/26/2021 2:18:22 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bea Romero on behalf of CenturyLink
|
10/26/2021 2:18:19 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Central Marksheffel Metro
|
10/26/2021 2:18:17 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Pamela Davidson on behalf of Central CO Conservation District
|
10/26/2021 2:18:15 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bart Atkinson on behalf of Cathedral Pines Metro
|
10/26/2021 2:18:13 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Warren on behalf of Cathedral Pines
|
10/26/2021 2:18:11 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Linda Miller on behalf of Calhan SD RJ1
|
10/26/2021 2:18:09 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Shane Gattis on behalf of Calhan Fire Protection District
|
10/26/2021 2:18:07 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cindy Tompkins on behalf of Calhan
|
10/26/2021 2:18:05 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Bradley Heights Metro Dist
|
10/26/2021 2:18:03 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Dave Griser on behalf of Bobcat Meadows Metro
|
10/26/2021 2:18:01 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
10/26/2021 2:17:58 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
10/26/2021 2:17:55 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/26/2021 2:17:53 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
10/26/2021 2:17:51 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Steve Wilson on behalf of Big Sandy SD 100 J
|
10/26/2021 2:17:49 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Chief John Hillmann on behalf of Big Sandy Fire Protection District
|
10/26/2021 2:17:47 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Bent Grass Metro
|
10/26/2021 2:17:45 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer Irvine on behalf of Baptist Road Rural Trans Authority
|
10/26/2021 2:17:43 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Anthony Pastorello on behalf of Academy Water & Sanitation
|
10/26/2021 2:17:41 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
10/26/2021 2:17:38 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
10/26/2021 2:17:36 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Keith Curtis on behalf of RBD Floodplain
|
10/26/2021 2:17:34 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/26/2021 2:17:32 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
10/26/2021 2:17:30 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/26/2021 2:17:28 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elaine Kelly on behalf of US Postal Service
|
10/26/2021 2:17:26 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
10/26/2021 2:17:24 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
10/26/2021 2:17:22 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
10/26/2021 2:17:20 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
10/26/2021 2:17:17 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/26/2021 2:17:14 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
10/26/2021 2:17:12 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Colorado Department of Public Health and Environment
|
10/26/2021 2:17:10 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Rebecca Hardekopf on behalf of Winsome Metropolitan District
|
10/26/2021 2:17:08 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Michael Diehl on behalf of Xcel Energy
|
10/26/2021 2:17:05 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of Parks Advisory Board
|
10/26/2021 2:17:03 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/26/2021 2:17:01 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bill Elder on behalf of EPC Sheriff's Department
|
10/26/2021 2:16:59 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Bill Elder on behalf of EPC Sheriff's Department
|
10/26/2021 2:16:57 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
10/26/2021 2:16:55 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by on behalf of EPC Parks Department
|
10/26/2021 2:16:53 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Catherine McGarvy on behalf of EPC Health Department
|
10/26/2021 2:16:36 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Jim Schanel on behalf of EPC Fire Marshal
|
10/26/2021 2:16:34 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/26/2021 2:16:31 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Lori Seago on behalf of County Attorney - Development Review
|
10/26/2021 2:16:29 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Ryan Howser on behalf of PCD Project Manager
|
10/26/2021 2:16:27 PM
|
Request for Review Comments email sent for Project EPC Mountain View Fiber Project Approval of Location for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/22/2021 3:35:52 PM
|
Fees paid: 10/22/2021 (Receipt: 1005285)
|
10/22/2021 3:20:14 PM
|
Payment Request sent: 10/22/2021
|
10/22/2021 3:18:06 PM
|
Submission request canceled
|
10/22/2021 10:23:46 AM
|
File # Assigned: U212
|
10/19/2021 4:50:42 PM
|
Submission request sent to Applicant
|
10/19/2021 4:50:28 PM
|
Submission Triaged
|
10/19/2021 1:43:45 PM
|
Submission received from Applicant
|
10/15/2021 3:46:16 PM
|
Submission request sent to Applicant
|
10/13/2021 9:13:34 AM
|
Submission request sent to Applicant
|
9/7/2021 8:41:54 AM
|
Project Manager Assigned: Ryan Howser
|
9/7/2021 8:41:54 AM
|
EA Assigned: EA21160
|
9/7/2021 8:41:54 AM
|
Project Created
|