5/22/2023 10:29:52 AM
|
Project Closed
|
5/22/2023 10:29:52 AM
|
Project Approved: 5/22/2023
|
5/22/2023 10:29:38 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
5/18/2023 3:57:31 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/11/2023 3:43:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/11/2023 11:49:07 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/11/2023 11:46:10 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/11/2023 11:45:36 AM
|
Submission Triaged
|
5/11/2023 10:50:06 AM
|
Submission received from Applicant
|
5/11/2023 8:16:31 AM
|
Submission request sent to Applicant
|
5/9/2023 6:12:09 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/1/2023 8:13:15 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/1/2023 8:13:12 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
5/1/2023 8:13:10 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/1/2023 8:11:49 AM
|
Submission Triaged
|
4/29/2023 5:42:18 AM
|
Submission received from Applicant
|
4/26/2023 2:41:54 PM
|
Submission request sent to Applicant
|
4/26/2023 2:38:35 PM
|
Project reopened for Review Comments
|
4/26/2023 8:33:07 AM
|
Project Closed
|
4/26/2023 8:33:07 AM
|
Project Approved: 4/26/2023
|
4/18/2023 10:24:28 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/17/2023 5:13:08 PM
|
Submission Triaged
|
4/17/2023 12:10:13 PM
|
Submission received from Applicant
|
4/10/2023 7:50:50 AM
|
Submission request sent to Applicant
|
4/7/2023 11:32:20 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/5/2023 11:12:28 AM
|
Submission request sent to Applicant
|
4/5/2023 11:11:29 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/23/2023 9:57:03 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/23/2023 9:56:59 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
3/23/2023 9:56:55 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/23/2023 9:55:08 AM
|
Submission Triaged
|
3/23/2023 8:23:58 AM
|
Submission received from Applicant
|
3/7/2023 4:14:21 PM
|
Submission request sent to Applicant
|
3/7/2023 4:13:21 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
2/13/2023 1:26:14 PM
|
Submission request sent to Applicant
|
2/13/2023 9:45:57 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/6/2023 12:35:43 PM
|
Submission request sent to Applicant
|
2/6/2023 12:15:54 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/6/2023 7:53:17 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/12/2023 7:12:54 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
1/12/2023 7:12:51 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
1/12/2023 7:12:50 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/12/2023 7:11:42 AM
|
Submission Triaged
|
1/12/2023 6:39:08 AM
|
Submission received from Applicant
|
12/13/2022 3:51:47 PM
|
Submission request sent to Applicant
|
12/1/2022 7:30:57 AM
|
Submission request sent to Applicant
|
11/30/2022 5:13:20 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/30/2022 8:26:35 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/30/2022 8:26:07 AM
|
Submission Triaged
|
11/29/2022 1:28:38 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/23/2022 6:29:25 AM
|
Submission received from Applicant
|
11/21/2022 7:08:57 AM
|
Submission request sent to Applicant
|
11/21/2022 7:08:25 AM
|
Submission Triaged
|
11/19/2022 8:57:00 AM
|
Submission received from Applicant
|
11/16/2022 3:57:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/16/2022 3:24:41 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
11/16/2022 12:14:13 PM
|
Submission request sent to Applicant
|
11/16/2022 12:13:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/16/2022 11:57:31 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by on behalf of PCD Administrative Notice
|
11/9/2022 3:03:50 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/27/2022 8:49:01 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/27/2022 8:48:58 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
10/27/2022 8:48:55 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
10/27/2022 8:48:53 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/27/2022 8:47:14 AM
|
Submission Triaged
|
10/26/2022 4:35:43 PM
|
Submission received from Applicant
|
10/17/2022 5:22:48 PM
|
Submission request sent to Applicant
|
10/11/2022 8:16:18 AM
|
Submission request sent to Applicant
|
10/5/2022 11:22:28 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/4/2022 7:02:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/29/2022 11:16:08 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/22/2022 4:51:38 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/19/2022 8:45:48 AM
|
Submission Triaged
|
9/19/2022 8:12:04 AM
|
Submission received from Applicant
|
9/19/2022 7:33:47 AM
|
Submission request sent to Applicant
|
9/15/2022 4:38:58 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/15/2022 4:38:57 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/15/2022 4:38:54 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
9/15/2022 4:38:52 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/15/2022 4:37:51 PM
|
Submission Triaged
|
9/15/2022 4:18:24 PM
|
Submission received from Applicant
|
8/9/2022 11:36:09 AM
|
Submission request sent to Applicant
|
8/5/2022 12:15:49 PM
|
Submission request sent to Applicant
|
8/5/2022 12:12:44 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/4/2022 4:42:04 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/1/2022 3:25:39 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/27/2022 8:29:22 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/11/2022 2:56:19 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/11/2022 2:56:16 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
7/11/2022 2:56:12 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by John Hunyadi on behalf of Colorado Dam Safety Division
|
7/11/2022 2:56:09 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/11/2022 2:56:07 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
7/11/2022 2:55:59 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
7/11/2022 2:55:56 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
7/11/2022 2:55:55 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/11/2022 2:51:52 PM
|
Submission Triaged
|
7/11/2022 10:28:16 AM
|
Submission received from Applicant
|
6/9/2022 3:35:31 PM
|
Request for Review Comments returned by Parks Advisory Board
|
6/9/2022 12:57:42 PM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by on behalf of Parks Advisory Board
|
5/25/2022 11:17:57 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
5/23/2022 7:17:40 AM
|
Submission request sent to Applicant
|
5/23/2022 7:15:24 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/20/2022 10:30:21 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/16/2022 10:55:13 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/10/2022 2:44:22 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/10/2022 12:06:21 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/5/2022 11:00:39 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/3/2022 3:19:22 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
5/3/2022 11:45:30 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/29/2022 11:11:54 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
4/28/2022 11:23:49 AM
|
Request for Review Comments returned by EPC Environmental Services
|
4/27/2022 3:22:59 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/25/2022 7:52:49 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/21/2022 12:04:59 PM
|
Request for Review Comments returned by EPC Parks Department
|
4/21/2022 10:39:56 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
4/19/2022 7:38:26 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
4/18/2022 6:00:36 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
4/18/2022 8:58:32 AM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/18/2022 8:51:26 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
4/18/2022 8:43:26 AM
|
Request for Review Comments returned by US Postal Service
|
4/18/2022 8:21:19 AM
|
Request for Review Comments returned by RBD Floodplain
|
4/18/2022 7:41:08 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Susan Davies on behalf of Trails and Open Space Coalition
|
4/18/2022 7:41:07 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
4/18/2022 7:41:06 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
4/18/2022 7:41:05 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
4/18/2022 7:41:04 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Melissa Andrews on behalf of Falcon School District 49
|
4/18/2022 7:41:03 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
4/18/2022 7:41:02 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
4/18/2022 7:41:00 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
4/18/2022 7:40:59 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/18/2022 7:40:58 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
4/18/2022 7:40:56 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
4/18/2022 7:40:47 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
4/18/2022 7:40:45 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
4/18/2022 7:40:44 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
4/18/2022 7:40:43 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
4/18/2022 7:40:42 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
4/18/2022 7:40:41 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Keith Curtis on behalf of RBD Floodplain
|
4/18/2022 7:40:40 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
4/18/2022 7:40:39 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/18/2022 7:40:37 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Rita Otega on behalf of US Postal Service
|
4/18/2022 7:40:36 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
4/18/2022 7:40:35 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
4/18/2022 7:40:34 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
4/18/2022 7:40:31 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/18/2022 7:40:30 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
4/18/2022 7:40:26 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by John Hunyadi on behalf of Colorado Dam Safety Division
|
4/18/2022 7:40:25 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by on behalf of Parks Advisory Board
|
4/18/2022 7:40:24 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
4/18/2022 7:40:21 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
4/18/2022 7:40:20 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
4/18/2022 7:40:19 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
4/18/2022 7:40:17 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by on behalf of EPC Parks Department
|
4/18/2022 7:40:16 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
4/18/2022 7:40:03 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/18/2022 7:40:02 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
4/18/2022 7:39:59 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
4/18/2022 7:39:58 AM
|
Request for Review Comments email sent for Project Homestead North at Sterling Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/14/2022 10:50:44 AM
|
Fees paid: 4/14/2022 (Receipt: 1006163)
|
3/31/2022 3:13:10 PM
|
Payment Request sent: 3/31/2022
|
3/31/2022 3:13:03 PM
|
File # Assigned: SF2213
|
3/31/2022 3:08:11 PM
|
Submission Triaged
|
3/31/2022 2:25:48 PM
|
Submission received from Applicant
|
11/8/2021 8:30:19 AM
|
Submission request sent to Applicant
|
9/1/2021 12:09:44 PM
|
Submission request sent to Applicant
|
9/1/2021 10:58:56 AM
|
Project Manager Assigned: Kari Parsons
|
9/1/2021 10:58:55 AM
|
EA Assigned: EA21159
|
9/1/2021 10:58:55 AM
|
Project Created
|