12/4/2024 11:33:25 AM
|
Project Closed
|
12/4/2024 11:33:25 AM
|
Project Approved: 12/4/2024
|
12/4/2024 11:33:04 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
11/25/2024 9:15:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/25/2024 7:59:46 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/18/2024 1:19:59 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/18/2024 11:07:29 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
11/18/2024 11:07:27 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
11/18/2024 11:07:25 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
11/18/2024 11:07:23 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
11/18/2024 11:07:18 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/18/2024 11:07:16 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
11/18/2024 11:05:51 AM
|
Submission Triaged
|
11/18/2024 10:19:31 AM
|
Submission received from Applicant
|
11/13/2024 10:58:12 AM
|
Submission request sent to Applicant
|
9/10/2024 11:32:13 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/4/2024 1:25:39 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
9/4/2024 1:25:37 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
9/4/2024 1:25:35 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
9/4/2024 1:24:58 PM
|
Submission Triaged
|
9/4/2024 12:15:57 PM
|
Submission received from Applicant
|
8/28/2024 1:11:02 PM
|
Submission request sent to Applicant
|
8/5/2024 9:09:57 AM
|
Submission request sent to Applicant
|
8/5/2024 9:09:42 AM
|
Submission Triaged
|
8/4/2024 2:06:27 PM
|
Submission received from Applicant
|
8/2/2024 8:25:12 AM
|
Submission request sent to Applicant
|
7/31/2024 8:31:15 AM
|
Submission request sent to Applicant
|
7/31/2024 8:29:21 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/30/2024 4:47:44 PM
|
Request for Review Comments returned by County Attorney - Water
|
7/28/2024 3:26:38 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/24/2024 10:12:45 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/17/2024 5:58:23 AM
|
Request for Review Comments returned by RBD Floodplain
|
7/16/2024 2:49:06 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
7/16/2024 2:49:04 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
7/16/2024 2:49:02 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
7/16/2024 2:49:00 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
7/16/2024 2:48:58 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
7/16/2024 2:48:56 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
7/16/2024 2:48:54 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
7/16/2024 2:48:52 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
7/16/2024 2:48:46 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/16/2024 2:48:45 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
7/16/2024 2:11:35 PM
|
Submission Triaged
|
7/16/2024 2:10:47 PM
|
Submission received from Applicant
|
6/13/2024 3:50:26 PM
|
Submission request sent to Applicant
|
6/13/2024 3:48:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/13/2024 10:16:02 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/12/2024 7:49:13 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/31/2024 3:59:16 PM
|
Request for Review Comments returned by RBD Floodplain
|
5/30/2024 8:58:54 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
5/30/2024 8:58:52 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/30/2024 8:58:50 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/30/2024 8:58:48 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
5/30/2024 8:58:46 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
5/30/2024 8:58:44 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
5/30/2024 8:58:42 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
5/30/2024 8:58:37 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/30/2024 8:58:35 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
5/30/2024 8:55:16 AM
|
Submission Triaged
|
5/30/2024 8:17:17 AM
|
Submission received from Applicant
|
4/16/2024 10:14:39 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/16/2024 8:52:28 AM
|
Submission request sent to Applicant
|
4/16/2024 8:50:39 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/1/2024 11:05:22 AM
|
Request for Review Comments returned by RBD Floodplain
|
3/29/2024 3:11:35 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
3/29/2024 3:11:33 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
3/29/2024 3:11:27 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/29/2024 3:11:25 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
3/29/2024 3:07:57 PM
|
Submission Triaged
|
3/29/2024 2:58:40 PM
|
Submission received from Applicant
|
3/19/2024 2:38:28 PM
|
Request for Review Comments returned by RBD Floodplain
|
3/19/2024 1:53:23 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
3/4/2024 10:32:18 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/27/2024 2:54:16 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
2/27/2024 2:20:54 PM
|
Submission request sent to Applicant
|
2/8/2024 2:01:37 PM
|
Submission request sent to Applicant
|
2/8/2024 1:56:18 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/8/2024 1:44:49 PM
|
Request for Review Comments returned by EPC Sheriff's Department
|
2/8/2024 1:31:19 PM
|
Request for Review Comments email resent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
2/8/2024 7:59:26 AM
|
Submission request sent to Applicant
|
2/7/2024 5:03:39 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/7/2024 11:26:30 AM
|
Submission request sent to Applicant
|
2/7/2024 11:19:33 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/7/2024 10:22:00 AM
|
Request for Review Comments returned by RBD Floodplain
|
2/7/2024 10:15:05 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
2/6/2024 1:50:42 PM
|
Request for Review Comments returned by RBD Floodplain
|
2/6/2024 11:49:43 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
2/6/2024 11:49:41 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
2/6/2024 11:49:39 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
2/6/2024 11:49:37 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
2/6/2024 11:49:35 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
2/6/2024 11:49:33 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
2/6/2024 11:49:31 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
2/6/2024 11:49:29 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
2/6/2024 11:49:27 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
2/6/2024 11:49:25 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
2/6/2024 11:49:23 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/6/2024 11:49:20 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
2/6/2024 11:49:19 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
2/6/2024 11:49:17 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
1/30/2024 3:50:53 PM
|
Request for Review Comments returned by County Attorney - Water
|
1/24/2024 12:31:33 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
1/24/2024 12:31:31 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
1/24/2024 12:31:25 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/24/2024 12:31:23 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
1/24/2024 12:16:17 PM
|
Submission Triaged
|
1/24/2024 11:19:37 AM
|
Submission received from Applicant
|
11/30/2023 1:48:21 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/9/2023 3:07:30 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/6/2023 11:26:59 AM
|
Submission request sent to Applicant
|
11/6/2023 11:25:48 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/6/2023 10:56:24 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/3/2023 9:31:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/1/2023 2:50:02 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
10/31/2023 2:13:33 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/27/2023 12:39:05 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/24/2023 2:00:32 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/24/2023 11:59:55 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/24/2023 11:59:51 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
10/24/2023 11:59:42 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
10/19/2023 3:02:51 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/19/2023 3:02:48 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Ashlyn Mathy on behalf of PCD Project Manager
|
10/19/2023 3:02:42 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/19/2023 3:02:40 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/19/2023 2:57:43 PM
|
Submission Triaged
|
10/19/2023 2:51:49 PM
|
Submission received from Applicant
|
7/24/2023 1:55:56 PM
|
Submission request sent to Applicant
|
6/26/2023 10:33:45 AM
|
Request for Review Comments returned by Falcon School District 49
|
6/15/2023 8:53:04 AM
|
Request for Review Comments returned by Parks Advisory Board
|
5/27/2023 9:17:55 PM
|
Request for Review Comments returned by EPC Health Department
|
5/26/2023 1:50:51 PM
|
Submission request sent to Applicant
|
5/26/2023 1:49:20 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/25/2023 10:50:43 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/24/2023 9:08:53 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Elizabeth Dukes on behalf of Falcon School District 49
|
5/23/2023 2:29:12 PM
|
Request for Review Comments returned by RBD Floodplain
|
5/23/2023 1:05:38 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Keith Curtis on behalf of RBD Floodplain
|
5/23/2023 12:14:51 PM
|
Request for Review Comments returned by EPC Parks Department
|
5/23/2023 9:51:21 AM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Ashlyn Mathy on behalf of PCD Project Manager
|
5/22/2023 2:27:32 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/22/2023 12:55:46 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/22/2023 8:29:39 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/18/2023 4:06:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/10/2023 12:34:04 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
5/10/2023 10:29:26 AM
|
Request for Review Comments returned by County Attorney - Water
|
5/9/2023 3:22:10 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
5/8/2023 9:18:47 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
5/8/2023 8:42:09 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/5/2023 4:01:50 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
5/4/2023 1:19:06 PM
|
Request for Review Comments email sent for Project Double Spur Ranch Minor Subdivision for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
5/3/2023 2:18:34 PM
|
Request for Review Comments returned by EPC Code Enforcement
|
5/1/2023 2:11:54 PM
|
Request for Review Comments returned by EPC Environmental Services
|
5/1/2023 8:40:38 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/1/2023 8:40:36 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
|
5/1/2023 8:40:35 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
5/1/2023 8:40:34 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
5/1/2023 8:40:33 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
5/1/2023 8:40:32 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
5/1/2023 8:40:30 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
5/1/2023 8:40:29 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/1/2023 8:40:28 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
5/1/2023 8:40:27 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
5/1/2023 8:40:26 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
5/1/2023 8:40:23 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
5/1/2023 8:40:21 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
5/1/2023 8:40:20 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by on behalf of Parks Advisory Board
|
5/1/2023 8:40:19 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
5/1/2023 8:40:18 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by on behalf of EPC Parks Department
|
5/1/2023 8:40:17 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
5/1/2023 8:40:07 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
5/1/2023 8:40:05 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Mindy Madden on behalf of EPC Code Enforcement
|
5/1/2023 8:40:04 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
5/1/2023 8:40:03 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
5/1/2023 8:40:00 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Ashlyn Mathy on behalf of PCD Project Manager
|
5/1/2023 8:39:59 AM
|
Request for Review Comments email sent for Project Hathcock subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/20/2023 2:50:25 PM
|
Fees paid: 4/20/2023 (Receipt: 1007774)
|
4/18/2023 4:34:51 PM
|
Project Manager Assigned: Ashlyn Mathy
|
4/18/2023 4:33:28 PM
|
Payment Request sent: 4/18/2023
|
4/18/2023 4:33:27 PM
|
File # Assigned: MS235
|
4/18/2023 4:33:24 PM
|
Submission Triaged
|
4/18/2023 1:56:07 PM
|
Submission received from Applicant
|
3/27/2023 2:24:09 PM
|
Submission request sent to Applicant
|
3/27/2023 2:23:47 PM
|
Submission Triaged
|
3/27/2023 12:09:41 PM
|
Submission received from Applicant
|
6/15/2022 12:09:43 PM
|
Submission request sent to Applicant
|
6/15/2022 12:08:52 PM
|
Set Applicant to land dev consultants
|
6/15/2022 12:07:51 PM
|
Set Applicant to LDC, INC.
|
6/1/2022 7:53:05 AM
|
Submission request sent to Applicant
|
5/28/2022 12:00:14 PM
|
Project Manager Assigned: Matthew Fitzsimmons
|
8/18/2021 4:47:31 PM
|
Submission request sent to Applicant
|
8/4/2021 7:47:12 AM
|
Project Manager Assigned: John Green
|
8/4/2021 7:47:12 AM
|
EA Assigned: EA21131
|
8/4/2021 7:47:12 AM
|
Project Created
|