9/30/2024 12:26:13 PM
|
Project Closed
|
9/30/2024 12:26:13 PM
|
Project Approved: 9/30/2024
|
9/30/2024 12:25:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/24/2024 5:01:32 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/24/2024 5:00:38 PM
|
Submission Triaged
|
9/24/2024 4:04:55 PM
|
Submission received from Applicant
|
9/19/2024 8:59:19 AM
|
Submission request sent to Applicant
|
9/19/2024 8:58:23 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/9/2024 9:47:49 AM
|
Fees paid: 9/9/2024 (Receipt: 1009549)
|
9/9/2024 8:37:41 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
9/9/2024 8:37:39 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
9/9/2024 8:37:37 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
9/9/2024 8:37:35 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/6/2024 3:01:46 PM
|
Payment Request sent: 9/6/2024
|
9/6/2024 3:01:27 PM
|
Submission Triaged
|
9/6/2024 12:50:46 PM
|
Submission received from Applicant
|
9/5/2024 5:14:31 PM
|
Submission request sent to Applicant
|
9/5/2024 5:14:14 PM
|
Submission Triaged
|
9/5/2024 4:22:44 PM
|
Submission received from Applicant
|
9/5/2024 1:06:31 PM
|
Submission request sent to Applicant
|
9/5/2024 1:03:42 PM
|
Project reopened for Review Comments
|
2/22/2023 6:02:27 PM
|
Project Closed
|
2/22/2023 6:02:27 PM
|
Project Approved: 2/22/2023
|
2/22/2023 2:35:50 PM
|
Submission Triaged
|
2/22/2023 2:26:55 PM
|
Submission received from Applicant
|
2/22/2023 9:19:24 AM
|
Submission request sent to Applicant
|
2/21/2023 2:46:37 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
2/21/2023 2:46:34 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/21/2023 7:53:29 AM
|
Submission Triaged
|
2/16/2023 5:04:05 PM
|
Submission received from Applicant
|
2/16/2023 12:40:40 PM
|
Submission request sent to Applicant
|
1/18/2023 7:48:52 AM
|
Submission request sent to Applicant
|
1/4/2023 12:07:45 PM
|
Submission request sent to Applicant
|
12/30/2022 9:50:33 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
12/8/2022 1:08:28 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/8/2022 1:04:33 PM
|
Submission request sent to Applicant
|
12/8/2022 10:59:17 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/6/2022 6:32:26 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/6/2022 4:07:38 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
11/29/2022 1:58:45 PM
|
Request for Review Comments returned by Fountain
|
11/16/2022 10:11:16 AM
|
Submission request sent to Applicant
|
11/16/2022 10:09:49 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Security Fire Protection District
|
11/16/2022 10:09:48 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
11/16/2022 10:09:46 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
11/16/2022 10:08:08 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kristy Martinez on behalf of Fountain
|
11/16/2022 10:08:06 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/16/2022 10:08:03 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
11/16/2022 10:08:00 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/16/2022 10:04:32 AM
|
Submission Triaged
|
11/16/2022 10:01:06 AM
|
Submission received from Applicant
|
10/21/2022 12:45:38 PM
|
Request for Review Comments returned by EPC Health Department
|
10/6/2022 11:22:02 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
9/30/2022 3:17:03 PM
|
Submission request sent to Applicant
|
9/28/2022 12:59:07 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/27/2022 8:40:32 AM
|
Submission request sent to Applicant
|
9/27/2022 7:51:40 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/26/2022 10:52:57 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of PCD Administrative Notice
|
9/26/2022 7:52:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/21/2022 9:04:33 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/15/2022 11:31:07 AM
|
Request for Review Comments returned by Parks Advisory Board
|
9/15/2022 11:29:56 AM
|
Request for Review Comments returned by EPC Parks Department
|
9/14/2022 11:21:46 AM
|
Request for Review Comments returned by Widefield SD 3
|
9/12/2022 1:31:49 PM
|
Request for Review Comments returned by Fountain Sanitation District
|
9/12/2022 1:02:13 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/8/2022 10:44:55 AM
|
Request for Review Comments returned by EPC Environmental Services
|
9/8/2022 10:37:50 AM
|
Request for Review Comments returned by Fountain
|
9/7/2022 3:23:40 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/6/2022 2:39:27 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/6/2022 9:07:04 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/2/2022 9:42:06 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/2/2022 7:53:37 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Travis Jones on behalf of Widefield Water & San
|
9/2/2022 7:53:36 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by COO Dave Gish on behalf of Widefield SD 3
|
9/2/2022 7:53:35 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
9/2/2022 7:53:34 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Roy Heald on behalf of Security Water & Sanitation District
|
9/2/2022 7:53:33 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Jay Adriansen on behalf of Security Sanitation District
|
9/2/2022 7:53:31 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Security Fire Protection District
|
9/2/2022 7:53:30 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
9/2/2022 7:53:29 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
9/2/2022 7:53:28 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by James Heckman on behalf of Fountain Sanitation District
|
9/2/2022 7:53:27 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/2/2022 7:53:26 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kristy Martinez on behalf of Fountain
|
9/2/2022 7:53:25 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/2/2022 7:53:24 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
9/2/2022 7:53:22 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
9/2/2022 7:53:21 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Heather on behalf of City of Fountain Electric
|
9/2/2022 7:53:19 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
9/2/2022 7:53:11 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/2/2022 7:53:10 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
9/2/2022 7:53:09 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/2/2022 7:53:08 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elaine Kelly on behalf of US Postal Service
|
9/2/2022 7:53:07 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
9/2/2022 7:53:04 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/2/2022 7:53:02 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
9/2/2022 7:53:00 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Parks Advisory Board
|
9/2/2022 7:52:58 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/2/2022 7:52:55 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
9/2/2022 7:52:54 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of EPC Parks Department
|
9/2/2022 7:52:53 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
9/2/2022 7:52:46 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/2/2022 7:52:45 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
9/2/2022 7:52:44 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Steve Schleiker on behalf of Assessor's Office
|
9/2/2022 7:52:43 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/2/2022 7:52:41 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/2/2022 7:50:32 AM
|
Submission Triaged
|
9/1/2022 2:41:03 PM
|
Submission received from Applicant
|
6/9/2022 3:36:35 PM
|
Request for Review Comments returned by Parks Advisory Board
|
6/9/2022 12:58:45 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Parks Advisory Board
|
6/3/2022 8:09:15 PM
|
Request for Review Comments returned by EPC Health Department
|
5/14/2022 3:29:18 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/12/2022 1:48:44 PM
|
Submission request sent to Applicant
|
5/12/2022 1:45:36 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/12/2022 1:21:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/4/2022 11:38:59 AM
|
Request for Review Comments email resent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
5/4/2022 10:20:14 AM
|
Request for Review Comments returned by Fountain Sanitation District
|
5/3/2022 7:31:19 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/2/2022 5:07:53 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
5/2/2022 11:54:12 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/29/2022 8:00:25 AM
|
Request for Review Comments returned by Widefield SD 3
|
4/27/2022 2:19:05 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/25/2022 2:07:57 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/25/2022 9:44:16 AM
|
Request for Review Comments returned by Fountain
|
4/22/2022 10:56:23 AM
|
Request for Review Comments returned by EPC Environmental Services
|
4/20/2022 11:22:34 AM
|
Request for Review Comments returned by EPC Parks Department
|
4/19/2022 9:31:12 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/12/2022 4:19:14 PM
|
Request for Review Comments email resent for Project Cottages at Mesa Ridge Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
4/12/2022 4:08:10 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/12/2022 3:12:49 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
4/12/2022 3:11:11 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by James Heckman on behalf of Fountain Sanitation District
|
4/12/2022 9:47:05 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Travis Jones on behalf of Widefield Water & San
|
4/12/2022 9:47:04 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by COO Dave Gish on behalf of Widefield SD 3
|
4/12/2022 9:47:03 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Roy Heald on behalf of Security Water & Sanitation District
|
4/12/2022 9:47:02 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Jay Adriansen on behalf of Security Sanitation District
|
4/12/2022 9:47:01 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Security Fire Protection District
|
4/12/2022 9:47:00 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
4/12/2022 9:46:58 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
4/12/2022 9:46:57 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
4/12/2022 9:46:56 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kristy Martinez on behalf of Fountain
|
4/12/2022 9:46:55 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/12/2022 9:46:54 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
4/12/2022 9:46:52 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
4/12/2022 9:46:50 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Heather on behalf of City of Fountain Electric
|
4/12/2022 9:46:49 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
4/12/2022 9:46:47 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
4/12/2022 9:46:46 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
4/12/2022 9:46:45 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
4/12/2022 9:46:44 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elaine Kelly on behalf of US Postal Service
|
4/12/2022 9:46:43 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
4/12/2022 9:46:42 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/12/2022 9:46:40 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
4/12/2022 9:46:35 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of Parks Advisory Board
|
4/12/2022 9:46:34 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
4/12/2022 9:46:32 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
4/12/2022 9:46:31 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by on behalf of EPC Parks Department
|
4/12/2022 9:46:30 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
4/12/2022 9:46:21 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/12/2022 9:46:20 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
4/12/2022 9:46:19 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Steve Schleiker on behalf of Assessor's Office
|
4/12/2022 9:46:18 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
4/12/2022 9:46:17 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/6/2022 8:12:29 AM
|
Fees paid: 4/6/2022 (Receipt: 1006121)
|
4/5/2022 5:14:59 PM
|
Payment Request sent: 4/5/2022
|
4/5/2022 5:14:59 PM
|
File # Assigned: SF2214
|
4/5/2022 5:14:55 PM
|
Submission Triaged
|
4/5/2022 5:11:23 PM
|
Submission received from Applicant
|
4/5/2022 5:02:17 PM
|
Submission request sent to Applicant
|
4/5/2022 5:02:03 PM
|
Submission Triaged
|
4/5/2022 3:27:27 PM
|
Submission received from Applicant
|
3/22/2022 10:50:07 AM
|
Submission request sent to Applicant
|
3/22/2022 10:46:51 AM
|
Submission request sent to Applicant
|
7/8/2021 11:56:38 AM
|
Submission request sent to Applicant
|
7/6/2021 3:11:45 PM
|
Project Manager Assigned: Kari Parsons
|
7/6/2021 3:11:45 PM
|
EA Assigned: EA2054
|
7/6/2021 3:11:45 PM
|
Project Created
|