7/1/2022 8:23:41 AM
|
Project Closed
|
7/1/2022 8:23:41 AM
|
Project Approved: 7/1/2022
|
6/29/2022 5:27:19 PM
|
Submission Triaged
|
6/29/2022 1:00:17 PM
|
Submission received from Applicant
|
6/28/2022 3:14:02 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/21/2022 4:55:46 PM
|
Submission request sent to Applicant
|
6/21/2022 3:31:46 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/21/2022 3:30:37 PM
|
Submission Triaged
|
6/17/2022 10:50:02 AM
|
Submission received from Applicant
|
6/16/2022 2:43:30 PM
|
Submission request sent to Applicant
|
6/16/2022 2:41:04 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/15/2022 1:59:18 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/15/2022 1:55:21 PM
|
Submission Triaged
|
6/15/2022 10:11:42 AM
|
Submission received from Applicant
|
6/14/2022 3:38:41 PM
|
Submission request sent to Applicant
|
6/14/2022 3:26:14 PM
|
Submission request sent to Applicant
|
6/14/2022 1:15:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/9/2022 11:07:27 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/8/2022 1:50:22 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/8/2022 1:50:20 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/8/2022 12:49:15 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/8/2022 12:49:10 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/8/2022 12:44:13 PM
|
Submission Triaged
|
6/8/2022 10:42:54 AM
|
Submission received from Applicant
|
6/7/2022 7:37:07 AM
|
Submission request sent to Applicant
|
6/2/2022 7:11:35 AM
|
Submission request sent to Applicant
|
6/2/2022 7:10:19 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/25/2022 2:42:16 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/24/2022 1:09:17 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/23/2022 9:26:22 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/10/2022 8:24:28 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/4/2022 5:00:21 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
5/4/2022 5:00:19 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/4/2022 5:00:17 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
5/4/2022 5:00:14 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
5/4/2022 5:00:12 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/4/2022 4:57:24 PM
|
Submission Triaged
|
5/4/2022 4:56:45 PM
|
Submission received from Applicant
|
5/4/2022 4:40:56 PM
|
Submission request sent to Applicant
|
5/4/2022 4:40:36 PM
|
Submission Triaged
|
5/4/2022 4:11:21 PM
|
Submission received from Applicant
|
5/4/2022 12:58:44 PM
|
Submission request sent to Applicant
|
4/20/2022 1:36:50 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/8/2022 7:42:04 AM
|
Submission request sent to Applicant
|
4/8/2022 7:40:10 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/8/2022 7:29:13 AM
|
Request for Review Comments email resent for Project Crossroads Mixed Use Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
4/7/2022 5:42:17 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/1/2022 7:09:12 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Edi Anderson on behalf of County Attorney - Water
|
3/31/2022 6:29:07 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/31/2022 12:12:56 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/31/2022 9:55:54 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/30/2022 3:13:45 PM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
3/21/2022 7:23:23 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/10/2022 3:43:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/10/2022 11:48:00 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/10/2022 11:07:44 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/10/2022 10:01:37 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/10/2022 10:01:33 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/10/2022 10:01:29 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Edi Anderson on behalf of County Attorney - Water
|
3/10/2022 10:01:27 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/10/2022 10:01:20 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
3/10/2022 10:01:16 AM
|
Request for Review Comments email sent for Project Crossroads Mixed Use Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/10/2022 9:54:04 AM
|
Submission Triaged
|
3/10/2022 8:41:34 AM
|
Submission received from Applicant
|
3/10/2022 8:21:57 AM
|
Submission request sent to Applicant
|
3/10/2022 8:20:19 AM
|
Submission Triaged
|
3/9/2022 1:10:46 PM
|
Submission received from Applicant
|
2/25/2022 10:48:45 AM
|
Submission request sent to Applicant
|
2/24/2022 9:07:58 AM
|
Submission request sent to Applicant
|
1/21/2022 12:24:33 PM
|
Submission request sent to Applicant
|
1/21/2022 12:18:15 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/21/2022 11:49:42 AM
|
Request for Review Comments email resent for Project Crossroads at Meadowbrook Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
1/18/2022 1:38:29 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/13/2022 1:40:45 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/6/2022 5:14:23 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/5/2022 10:09:17 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/3/2022 3:54:03 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/28/2021 1:33:44 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
12/28/2021 10:36:37 AM
|
Request for Review Comments email resent for Project Crossroads at Meadowbrook Filing No. 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
12/27/2021 12:12:12 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
12/21/2021 9:55:39 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/17/2021 9:19:04 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/16/2021 11:06:00 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/16/2021 8:29:46 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/15/2021 3:03:02 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/14/2021 5:07:10 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/14/2021 5:07:06 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
12/14/2021 5:07:04 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/14/2021 5:06:58 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
12/14/2021 5:06:51 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/14/2021 5:06:48 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by on behalf of EPC Parks Department
|
12/14/2021 5:06:45 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Edi Anderson on behalf of County Attorney - Water
|
12/14/2021 5:06:43 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/14/2021 5:06:37 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
12/14/2021 5:06:33 PM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/14/2021 5:03:16 PM
|
Submission Triaged
|
12/14/2021 12:03:34 PM
|
Submission received from Applicant
|
12/14/2021 11:39:44 AM
|
Submission request sent to Applicant
|
12/14/2021 11:39:13 AM
|
Submission Triaged
|
12/14/2021 11:35:00 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
12/13/2021 12:05:38 PM
|
Submission received from Applicant
|
10/26/2021 11:18:57 AM
|
Submission request sent to Applicant
|
10/1/2021 7:33:53 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/30/2021 4:56:06 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/23/2021 8:53:25 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/17/2021 3:55:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/17/2021 3:19:16 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
9/15/2021 2:32:12 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/10/2021 10:02:42 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/9/2021 9:48:32 AM
|
Request for Review Comments returned by Parks Advisory Board
|
9/3/2021 1:21:49 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/2/2021 1:40:22 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/2/2021 10:00:16 AM
|
Request for Review Comments returned by EPC Parks Department
|
9/2/2021 7:39:26 AM
|
Request for Review Comments returned by Cimarron Hills Fire
|
9/1/2021 9:12:34 AM
|
Request for Review Comments returned by EPC Environmental Services
|
8/27/2021 10:00:40 AM
|
Request for Review Comments returned by County Attorney - Water
|
8/27/2021 9:54:28 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Mr. Michael Shafer on behalf of Peterson AFB
|
8/27/2021 9:54:25 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
8/27/2021 9:54:22 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
8/27/2021 9:54:18 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/27/2021 9:54:15 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
8/27/2021 9:54:06 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
8/27/2021 9:54:01 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
8/27/2021 9:53:58 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
8/27/2021 9:53:55 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
8/27/2021 9:53:52 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/27/2021 9:53:50 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/27/2021 9:53:46 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
8/27/2021 9:53:38 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Terry Johns on behalf of Colorado Springs SD 11
|
8/27/2021 9:53:36 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by on behalf of Parks Advisory Board
|
8/27/2021 9:53:33 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/27/2021 9:53:29 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
8/27/2021 9:53:26 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
8/27/2021 9:53:23 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by on behalf of EPC Parks Department
|
8/27/2021 9:53:21 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
8/27/2021 9:53:08 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/27/2021 9:53:06 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Edi Anderson on behalf of County Attorney - Water
|
8/27/2021 9:53:03 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/27/2021 9:52:56 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
8/27/2021 9:52:53 AM
|
Request for Review Comments email sent for Project Crossroads at Meadowbrook Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/26/2021 4:54:01 PM
|
Fees paid: 8/26/2021 (Receipt: 1005008)
|
8/25/2021 9:05:32 PM
|
Payment Request sent: 8/25/2021
|
8/25/2021 9:05:32 PM
|
File # Assigned: SF2129
|
8/25/2021 9:05:19 PM
|
Submission Triaged
|
8/25/2021 12:07:34 PM
|
Submission received from Applicant
|
8/24/2021 7:45:43 PM
|
Submission request sent to Applicant
|
8/24/2021 10:38:14 AM
|
Project Manager Assigned: Ryan Howser
|
8/24/2021 10:37:51 AM
|
Submission request sent to Applicant
|
8/24/2021 10:37:30 AM
|
Submission Triaged
|
8/23/2021 4:32:27 PM
|
Submission received from Applicant
|
8/5/2021 8:48:11 AM
|
Submission request sent to Applicant
|
8/5/2021 8:47:48 AM
|
Project Manager Assigned: Kari Parsons
|
8/3/2021 9:33:27 AM
|
Submission request sent to Applicant
|
8/3/2021 9:33:08 AM
|
Submission Triaged
|
7/30/2021 6:01:47 PM
|
Submission received from Applicant
|
7/1/2021 11:58:22 AM
|
Submission request sent to Applicant
|
7/1/2021 11:21:28 AM
|
EA Assigned: EA2055
|
7/1/2021 11:21:28 AM
|
Project Created
|