| 10/30/2025 3:32:16 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/30/2025 2:12:17 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/30/2025 1:17:57 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/29/2025 2:24:33 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 10/23/2025 11:20:40 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 10/10/2025 8:53:37 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 10/10/2025 8:14:19 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 10/10/2025 8:14:18 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 10/10/2025 8:14:17 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 10/10/2025 8:14:16 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 10/10/2025 8:14:14 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 10/10/2025 8:14:13 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 10/10/2025 8:14:12 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 10/10/2025 8:14:11 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/10/2025 8:14:10 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/10/2025 8:14:09 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/10/2025 8:14:07 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/10/2025 8:14:05 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 10/10/2025 8:14:03 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/10/2025 8:07:18 AM | Submission Triaged | 
                
                    | 10/9/2025 3:38:25 PM | Submission received from Applicant | 
                
                    | 10/7/2025 1:18:22 PM | Submission request sent to Applicant | 
                
                    | 9/25/2025 4:52:06 PM | Submission request sent to Applicant | 
                
                    | 9/25/2025 3:51:36 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/24/2025 4:26:12 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/24/2025 2:33:04 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/23/2025 2:27:00 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 9/22/2025 11:20:49 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 9/17/2025 3:17:17 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/12/2025 11:01:46 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 9/3/2025 3:11:29 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources | 
                
                    | 9/3/2025 3:11:28 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 9/3/2025 3:11:27 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 9/3/2025 3:11:26 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 9/3/2025 3:11:25 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 9/3/2025 3:11:24 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 9/3/2025 3:11:23 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 9/3/2025 3:11:22 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 9/3/2025 3:11:21 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 9/3/2025 3:11:20 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 9/3/2025 3:11:19 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 9/3/2025 3:11:18 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 9/3/2025 3:11:17 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 9/3/2025 3:11:15 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/3/2025 3:11:13 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 9/3/2025 3:11:11 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/3/2025 2:46:10 PM | Submission Triaged | 
                
                    | 9/3/2025 2:20:25 PM | Submission received from Applicant | 
                
                    | 9/3/2025 1:28:35 PM | Submission request sent to Applicant | 
                
                    | 9/3/2025 1:28:00 PM | Submission request sent to Applicant | 
                
                    | 9/3/2025 1:27:31 PM | Submission Triaged | 
                
                    | 9/2/2025 3:25:39 PM | Submission received from Applicant | 
                
                    | 7/15/2025 11:08:47 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 7/11/2025 1:31:40 PM | Submission request sent to Applicant | 
                
                    | 7/11/2025 11:17:35 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 7/10/2025 5:19:00 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 7/10/2025 5:13:44 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 7/9/2025 5:08:48 PM | Submission Triaged | 
                
                    | 7/9/2025 5:07:57 PM | Submission received from Applicant | 
                
                    | 7/9/2025 4:49:53 PM | Submission request sent to Applicant | 
                
                    | 7/9/2025 3:39:19 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 7/9/2025 2:23:51 PM | Request for Review Comments returned by Falcon School District 49 | 
                
                    | 7/9/2025 11:27:52 AM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 7/1/2025 8:57:03 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 6/26/2025 4:37:03 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 6/23/2025 9:05:01 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 6/23/2025 8:14:45 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 6/20/2025 7:27:52 AM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 6/19/2025 3:47:49 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 6/19/2025 3:47:47 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Steve White on behalf of Mountain Metro Transit (City of COS) | 
                
                    | 6/19/2025 3:47:46 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS) | 
                
                    | 6/19/2025 3:47:45 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Evelyn galanephillips on behalf of Falcon School District 49 | 
                
                    | 6/19/2025 3:47:44 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 6/19/2025 3:47:43 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 6/19/2025 3:47:42 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 6/19/2025 3:47:41 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 6/19/2025 3:47:40 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 6/19/2025 3:47:39 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 6/19/2025 3:47:38 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 6/19/2025 3:47:36 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 6/19/2025 3:47:35 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 6/19/2025 3:47:33 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources | 
                
                    | 6/19/2025 3:47:32 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 6/19/2025 3:47:31 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 6/19/2025 3:47:30 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/19/2025 3:47:29 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/19/2025 3:47:28 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/19/2025 3:47:27 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 6/19/2025 3:47:26 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 6/19/2025 3:47:25 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 6/19/2025 3:47:24 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 6/19/2025 3:47:23 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 6/19/2025 3:47:22 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 6/19/2025 3:47:21 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 6/19/2025 3:47:18 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 6/19/2025 3:47:17 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/19/2025 3:47:15 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/19/2025 3:47:13 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 6/19/2025 3:42:29 PM | Submission Triaged | 
                
                    | 6/19/2025 1:41:11 PM | Submission received from Applicant | 
                
                    | 4/20/2025 7:41:45 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 4/18/2025 2:38:17 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 4/10/2025 4:13:11 PM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 4/10/2025 11:37:41 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 3/31/2025 8:09:17 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 3/27/2025 7:05:31 AM | Submission request sent to Applicant | 
                
                    | 3/26/2025 9:46:48 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/26/2025 12:38:54 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 3/25/2025 9:28:18 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 3/25/2025 4:39:23 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/24/2025 1:04:57 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 3/24/2025 8:50:38 AM | Request for Review Comments returned by Falcon School District 49 | 
                
                    | 3/20/2025 2:25:52 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 3/20/2025 11:34:38 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 3/18/2025 9:19:21 AM | Fees paid: 3/18/2025 (Receipt: 1010301) | 
                
                    | 3/18/2025 8:01:36 AM | Payment Request sent: 3/18/2025 | 
                
                    | 3/17/2025 1:48:33 PM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 3/10/2025 1:45:11 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 3/7/2025 11:45:26 AM | Request for Review Comments returned by Paint Brush Hills Metro | 
                
                    | 3/7/2025 7:22:00 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 3/6/2025 2:53:01 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 3/6/2025 1:47:52 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 3/5/2025 1:15:40 PM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of PCD Administrative Notice | 
                
                    | 3/4/2025 12:48:50 PM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 3/4/2025 8:19:32 AM | Project Manager Assigned: Ryan Howser | 
                
                    | 3/4/2025 7:48:09 AM | Fees paid: 3/4/2025 (Receipt: 1010225) | 
                
                    | 3/4/2025 7:06:13 AM | Payment Request sent: 3/4/2025 | 
                
                    | 3/4/2025 7:06:06 AM | File # Assigned: SP252 | 
                
                    | 3/4/2025 7:04:40 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Steve Knepper on behalf of Paint Brush Hills Metro | 
                
                    | 3/4/2025 7:04:39 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Robert Guevara on behalf of Paint Brush Hills Metro | 
                
                    | 3/4/2025 7:04:38 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 3/4/2025 7:04:36 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Steve White on behalf of Mountain Metro Transit (City of COS) | 
                
                    | 3/4/2025 7:04:35 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS) | 
                
                    | 3/4/2025 7:04:34 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Evelyn galanephillips on behalf of Falcon School District 49 | 
                
                    | 3/4/2025 7:04:33 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 3/4/2025 7:04:32 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 3/4/2025 7:04:31 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 7:04:30 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 7:04:29 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 7:04:27 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 7:04:26 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 3/4/2025 7:04:25 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 3/4/2025 7:04:24 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 3/4/2025 7:04:23 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 3/4/2025 7:04:21 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 3/4/2025 7:04:20 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 3/4/2025 7:04:19 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 3/4/2025 7:04:18 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 3/4/2025 7:04:17 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 3/4/2025 7:04:16 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 3/4/2025 7:04:15 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 3/4/2025 7:04:14 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 7:04:13 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 7:04:12 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 7:04:11 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 3/4/2025 7:04:10 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 3/4/2025 7:04:09 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 3/4/2025 7:04:07 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 3/4/2025 7:04:06 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 3/4/2025 7:04:05 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 3/4/2025 7:04:04 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 3/4/2025 7:04:03 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 3/4/2025 7:04:02 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 3/4/2025 7:04:01 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 3/4/2025 7:04:00 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 3/4/2025 7:03:58 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 3/4/2025 7:03:56 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 3/4/2025 7:03:55 AM | Request for Review Comments email sent for Project Falcon Reserve Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 2/24/2025 9:08:53 AM | Submission Triaged | 
                
                    | 2/21/2025 2:29:16 PM | Submission received from Applicant | 
                
                    | 6/19/2024 2:22:01 PM | Submission request sent to Applicant | 
                
                    | 5/15/2024 8:36:16 AM | Submission request sent to Applicant | 
                
                    | 3/19/2024 1:08:36 PM | EA Assigned: EA2433 | 
                
                    | 3/19/2024 1:04:05 PM | Project Manager Assigned: Kari Parsons | 
                
                    | 3/19/2024 1:02:46 PM | Project reopened for Review Comments | 
                
                    | 6/23/2022 12:00:00 AM | Project Closed | 
                
                    | 6/23/2022 12:00:00 AM | Project Expired one year after 06/23/2021 Submission Request 06/23/2022 | 
                
                    | 6/23/2021 7:04:00 AM | Submission request sent to Applicant | 
                
                    | 6/11/2021 10:52:30 AM | Project Manager Assigned: Ryan Howser | 
                
                    | 6/11/2021 10:52:30 AM | EA Assigned: EA21101 | 
                
                    | 6/11/2021 10:52:30 AM | Project Created |