Project Details

Search | All Active Projects


File Number
SF2124
Project Name
Trails at Aspen Ridge Filing No. 4 Final Plat
Description
Final Plat of 124 single-family residential lots
Parcels
5509305003 5509305003
Applicant
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
File Prefix
SF - Final Plat
Year
2021
Project Manager
Kylie Bagley
Status
Active
Created
5/26/2021 2:27:41 PM

View: Review Comments



Additional Documents (1)

Link Document Comment
View Revised Drainage Comments


Review Documents (76)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 9/19/2021 1:32:39 PM
View Application/Petition Form 6/10/2021 2:49:37 PM
View Grading & Erosion Control checklist 7/19/2023 10:55:55 AM
View Legal Description (MS WORD Version required) 9/19/2021 1:32:52 PM
View Letter of Intent 1/15/2025 4:02:47 PM
View Title Commitment (Current within 30 days of submittal) 9/19/2021 1:32:55 PM
View Vicinity/Location Map 9/19/2021 1:32:56 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 7/27/2023 4:54:30 PM
View Financial Assurance Forms 12/23/2021 12:04:12 PM
View Mineral Rights Certification 9/19/2021 1:32:53 PM
View MS4 Post Construction Form 7/19/2023 11:00:45 AM
View PBMP Applicability Form 7/19/2023 10:55:55 AM
View PDB/BMP Operations & Maintenance Manual 7/19/2023 11:00:45 AM
View State Dam Verification 6/10/2021 3:37:55 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 9/19/2021 1:32:58 PM
View Subdivision Improvement Agreement (MS Word version required) 1/15/2025 4:02:48 PM
View SWMP checklist 9/19/2021 1:33:00 PM
View Utility Plans 1/15/2025 4:02:49 PM
View Construction Drawings (Plans/Profiles) 1/15/2025 4:02:42 PM
View Final Plat Drawings 1/15/2025 4:02:47 PM
View Grading & Erosion Control Plan 7/19/2023 10:55:51 AM
View Storm Water Management Plan (SWMP) 1/15/2025 4:02:48 PM
View Commitment letter from waste water service provider 6/10/2021 2:49:39 PM
View Commitment letter from water service provider 6/10/2021 2:49:38 PM
View Electric Provider Commitment Letter 6/10/2021 2:49:39 PM
View Fire Commitment Letter 6/10/2021 2:49:44 PM
View Natural Gas Commitment Letter 6/10/2021 2:49:47 PM
View Drainage Report - Final 1/15/2025 4:02:44 PM
View Fire Protection Report 6/10/2021 2:49:44 PM
View Soils & Geology Report 6/10/2021 2:49:45 PM
View Subdivision Summary Sheet 12/23/2021 12:04:18 PM
View Traffic Impact Study 1/11/2023 2:07:24 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 1/15/2025 4:02:43 PM
View Acreage Exhibit 9/19/2021 1:33:06 PM
View CD Redline Responses 1/9/2023 5:24:23 PM
View Closures Sheet (Survey) 6/10/2021 2:49:38 PM
View Deviation Request 7/19/2023 10:55:56 AM
View Deviation Request 7/19/2023 10:55:56 AM
View Drop MH Deviation Request 9/19/2021 1:33:01 PM
View Erosion Control Permit 1/15/2025 4:02:51 PM
View F4 Landscape Plans 9/19/2021 1:33:01 PM
View F4 NW Pond Detention Calculations 1/15/2025 4:13:57 PM
View F4 Underdrain Plan 12/28/2021 8:10:23 AM
View FAE 7/19/2023 10:55:57 AM
View Filing 4 Commitment Letter 1/15/2025 4:02:50 PM
View Filing 4 Fire Commitment Letter 1/15/2025 4:10:14 PM
View Filing 4 GEC Checklist 1/15/2025 4:05:37 PM
View Filing 4 Geotech Report 1/15/2025 4:13:58 PM
View Filing 4 Grading & Erosion Control Plans 1/15/2025 4:05:36 PM
View Filing 4 Mineral Rights Letter 1/15/2025 4:10:15 PM
View Filing 4 MVEA Letter 1/15/2025 4:13:56 PM
View Filing 4 Natural Features Report 1/15/2025 4:05:38 PM
View Filing 4 Natural Gas Letter 1/15/2025 4:13:56 PM
View Filing 4 Noxious Weeds Management 1/15/2025 4:05:38 PM
View Filing 4 O&M Manual 1/15/2025 4:13:57 PM
View Filing 4 PBMP Form 1/15/2025 4:07:56 PM
View Filing 4 Roadway Design Deviation Request 1/15/2025 4:10:14 PM
View Filing 4 State Dam Verification 1/15/2025 4:10:13 PM
View Filing 4 Subdivision Summary Form 1/15/2025 4:07:57 PM
View Filing 4 SWMP Checklist 1/15/2025 4:07:57 PM
View Filing 4 Type D Application 1/15/2025 4:15:21 PM
View Filing 4 Vicinity Map 1/15/2025 4:07:58 PM
View Filing 4 Wastewater Treatment Report 1/15/2025 4:07:58 PM
View Filing 4 Water CDs 1/15/2025 4:10:12 PM
View Filing 4 Wildlife Report 1/15/2025 4:15:21 PM
View Final Plat Responses 9/27/2022 3:02:27 PM
View Financial Assurance Estimate 1/15/2025 4:02:52 PM
View Fire Protection Report 1/15/2025 4:05:35 PM
View K Value Deviation Request 9/19/2021 1:33:03 PM
View Manhole Deviation Request 1/15/2025 4:02:50 PM
View MS4 Permit 1/15/2025 4:02:51 PM
View Ped Ramp Deviation Request 12/28/2021 8:10:22 AM
View Plat Redline Responses 1/9/2023 5:24:22 PM
View R&S Plans 7/19/2023 10:55:57 AM
View Sanitary Plans 1/9/2023 5:24:21 PM
View Water Plans 1/9/2023 5:24:21 PM



Events (188)

Date Comment
1/31/2025 1:18:29 PM Request for Review Comments returned by County Attorney - Development Review
1/31/2025 11:41:52 AM Submission request sent to Applicant
1/31/2025 11:40:54 AM Request for Review Comments returned by PCD Project Manager
1/31/2025 8:32:56 AM Request for Review Comments returned by EPC Stormwater Review
1/29/2025 5:30:43 PM Request for Review Comments returned by PCD Engineering Division
1/17/2025 8:07:30 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
1/17/2025 8:07:29 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
1/17/2025 8:07:28 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
1/17/2025 8:07:27 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/17/2025 8:07:26 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
1/17/2025 8:07:25 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by April Willie on behalf of County Attorney - Development Review
1/17/2025 8:07:23 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
1/17/2025 8:07:22 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
1/17/2025 8:07:21 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
1/17/2025 7:50:34 AM Submission Triaged
1/15/2025 4:15:39 PM Submission received from Applicant
1/10/2025 1:19:52 PM Submission request sent to Applicant
1/25/2024 12:38:05 PM Submission request sent to Applicant
8/14/2023 8:17:05 AM Submission request sent to Applicant
8/11/2023 5:09:07 PM Request for Review Comments returned by PCD Engineering Division
8/11/2023 3:31:58 PM Request for Review Comments returned by PCD Project Manager
8/2/2023 12:19:16 PM Request for Review Comments returned by EPC Stormwater Review
7/28/2023 11:40:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/28/2023 11:40:41 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Kylie Bagley on behalf of PCD Project Manager
7/28/2023 11:40:39 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/28/2023 11:36:52 AM Submission Triaged
7/27/2023 4:54:41 PM Submission received from Applicant
7/11/2023 2:42:45 PM Submission request sent to Applicant
5/18/2023 3:38:23 PM Request for Review Comments returned by County Attorney - Development Review
5/10/2023 3:38:35 PM Submission request sent to Applicant
5/10/2023 3:38:13 PM Request for Review Comments returned by PCD Project Manager
5/10/2023 2:03:09 PM Request for Review Comments returned by PCD Engineering Division
4/19/2023 11:48:43 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
4/19/2023 11:48:40 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Kylie Bagley on behalf of PCD Project Manager
4/19/2023 11:48:37 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
4/19/2023 11:46:15 AM Submission Triaged
4/18/2023 3:00:58 PM Submission received from Applicant
3/23/2023 3:12:02 PM Project Manager Assigned: Kylie Bagley
3/17/2023 4:03:11 PM Submission request sent to Applicant
3/13/2023 6:04:39 PM Request for Review Comments returned by PCD Engineering Division
3/7/2023 5:31:53 PM Request for Review Comments returned by PCD Project Manager
3/7/2023 5:26:57 PM Request for Review Comments email resent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/7/2023 3:47:15 PM Request for Review Comments returned by PCD Engineering Division
3/7/2023 10:53:25 AM Request for Review Comments returned by County Attorney - Development Review
2/7/2023 10:34:58 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
2/7/2023 10:34:55 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Ryan Howser on behalf of PCD Project Manager
2/7/2023 10:34:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/7/2023 10:33:29 AM Submission Triaged
2/7/2023 8:23:38 AM Submission received from Applicant
1/12/2023 3:14:45 PM Submission request sent to Applicant
1/12/2023 3:14:35 PM Submission Triaged
1/11/2023 2:09:22 PM Submission received from Applicant
1/10/2023 2:37:09 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/5/2023 5:29:34 PM Request for Review Comments email resent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/5/2023 1:55:03 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/29/2022 7:05:15 PM Request for Review Comments returned by EPC Health Department
11/8/2022 1:55:54 PM Submission request sent to Applicant
11/8/2022 1:54:23 PM Request for Review Comments returned by PCD Project Manager
11/7/2022 8:49:48 AM Request for Review Comments returned by PCD Engineering Division
11/4/2022 5:08:47 PM Request for Review Comments returned by County Attorney - Development Review
10/12/2022 12:22:31 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/12/2022 12:22:30 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
10/12/2022 12:22:23 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
10/12/2022 12:22:20 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Ryan Howser on behalf of PCD Project Manager
10/12/2022 12:22:17 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 4 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/4/2022 1:08:28 PM Submission Triaged
10/4/2022 9:06:44 AM Submission received from Applicant
4/12/2022 12:01:55 PM Project Manager Assigned: Ryan Howser
2/1/2022 11:19:48 AM Request for Review Comments returned by County Attorney - Development Review
1/28/2022 3:46:07 PM Submission request sent to Applicant
1/28/2022 3:42:32 PM Request for Review Comments returned by PCD Project Manager
1/27/2022 5:29:28 PM Request for Review Comments email resent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
1/27/2022 10:24:20 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/27/2022 8:34:55 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/26/2022 3:46:31 PM Request for Review Comments returned by PCD Engineering Division
1/25/2022 9:48:38 PM Request for Review Comments returned by EPC Stormwater Review
1/19/2022 3:12:41 PM Request for Review Comments returned by PCD Project Manager
1/7/2022 10:42:38 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/4/2022 2:02:05 PM Request for Review Comments returned by EPC Parks Department
1/4/2022 7:16:35 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by General Email on behalf of Mountain View Electric Association, Inc.
1/4/2022 7:16:33 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/4/2022 7:16:31 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
1/4/2022 7:16:26 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/4/2022 7:16:22 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by on behalf of EPC Parks Department
1/4/2022 7:16:20 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review
1/4/2022 7:16:14 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
1/4/2022 7:16:08 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/4/2022 7:12:21 AM Submission Triaged
12/28/2021 8:10:30 AM Submission received from Applicant
12/28/2021 8:05:01 AM Submission request sent to Applicant
11/2/2021 8:11:25 AM Submission request sent to Applicant
11/2/2021 8:10:29 AM Request for Review Comments returned by PCD Project Manager
10/30/2021 7:50:52 PM Request for Review Comments returned by County Attorney - Development Review
10/28/2021 2:57:53 PM Request for Review Comments returned by PCD Engineering Division
10/28/2021 9:14:34 AM Request for Review Comments returned by Pikes Peak Regional Building Department
10/25/2021 4:37:48 PM Request for Review Comments returned by EPC Stormwater Review
10/7/2021 9:10:49 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/6/2021 8:04:10 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
10/6/2021 8:04:06 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/6/2021 8:04:02 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review
10/6/2021 8:01:42 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
10/6/2021 8:01:36 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/5/2021 7:09:11 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
10/4/2021 8:16:29 AM Request for Review Comments returned by County Attorney - Water
10/4/2021 6:55:45 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/4/2021 6:55:43 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
10/4/2021 6:55:39 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
10/4/2021 6:55:35 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/4/2021 6:55:31 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Edi Anderson on behalf of County Attorney - Water
10/4/2021 6:55:29 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review
10/4/2021 6:55:22 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
10/4/2021 6:55:16 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/4/2021 6:51:04 AM Submission Triaged
9/19/2021 1:36:43 PM Submission received from Applicant
7/23/2021 11:31:13 AM Request for Review Comments returned by Parks Advisory Board
7/23/2021 11:07:29 AM Submission request sent to Applicant
7/23/2021 11:05:41 AM Request for Review Comments returned by PCD Project Manager
7/21/2021 9:36:10 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/20/2021 1:31:27 PM Request for Review Comments returned by PCD Engineering Division
7/20/2021 10:20:22 AM Request for Review Comments returned by Colorado Geological Survey
7/19/2021 12:24:05 PM Request for Review Comments returned by Pikes Peak Regional Building Department
7/14/2021 9:04:35 PM Request for Review Comments returned by County Attorney - Development Review
7/14/2021 10:52:18 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/12/2021 2:56:48 PM Request for Review Comments returned by EPC Stormwater Review
7/1/2021 11:53:24 AM Request for Review Comments returned by EPC Parks Department
7/1/2021 8:50:58 AM Request for Review Comments returned by Widefield SD 3
6/28/2021 10:09:37 AM Request for Review Comments returned by Colorado Division of Water Resources
6/25/2021 2:41:36 PM Request for Review Comments returned by EPC Environmental Services
6/25/2021 12:19:29 PM Request for Review Comments returned by RBD Floodplain
6/25/2021 12:06:59 PM Request for Review Comments email resent for Project Trails at Aspen Ridge Filing 4 for review by Keith Curtis on behalf of RBD Floodplain
6/24/2021 5:30:11 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
6/24/2021 5:30:04 PM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/24/2021 2:56:30 PM Request for Review Comments returned by RBD Floodplain
6/24/2021 9:56:43 AM Request for Review Comments returned by Colorado State Forest Service
6/23/2021 8:11:44 AM Request for Review Comments returned by Fountain
6/22/2021 9:47:49 AM Request for Review Comments returned by Schriever AFB
6/21/2021 2:23:37 PM Request for Review Comments returned by EPC Code Enforcement
6/21/2021 9:19:34 AM Request for Review Comments returned by County Attorney - Water
6/21/2021 7:59:32 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/18/2021 8:35:04 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Brandon Bernard on behalf of Widefield Water & San
6/18/2021 8:35:02 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by COO Dave Gish on behalf of Widefield SD 3
6/18/2021 8:35:00 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Peter Susemihl on behalf of Waterview 1 Metro
6/18/2021 8:34:58 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by on behalf of Security Fire Protection District
6/18/2021 8:34:56 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Darren Horstmeier on behalf of Schriever AFB
6/18/2021 8:34:54 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Mr. Michael Shafer on behalf of Peterson AFB
6/18/2021 8:34:52 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by General Email on behalf of Mountain View Electric Association, Inc.
6/18/2021 8:34:50 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
6/18/2021 8:34:48 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Kristy Martinez on behalf of Fountain
6/18/2021 8:34:46 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
6/18/2021 8:34:44 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/18/2021 8:34:42 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
6/18/2021 8:34:36 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
6/18/2021 8:34:33 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Keith Curtis on behalf of RBD Floodplain
6/18/2021 8:34:31 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
6/18/2021 8:34:29 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/18/2021 8:34:27 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/18/2021 8:34:25 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
6/18/2021 8:34:23 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Justin Osborne on behalf of Colorado State Land Board
6/18/2021 8:34:21 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
6/18/2021 8:34:19 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
6/18/2021 8:34:13 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
6/18/2021 8:34:11 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Joanna Williams on behalf of Colorado Division of Water Resources
6/18/2021 8:34:09 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
6/18/2021 8:34:01 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Hunyadi on behalf of Colorado Dam Safety Division
6/18/2021 8:33:59 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by on behalf of Parks Advisory Board
6/18/2021 8:33:57 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/18/2021 8:33:51 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/18/2021 8:33:48 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/18/2021 8:33:46 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by on behalf of EPC Parks Department
6/18/2021 8:33:44 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Catherine McGarvy on behalf of EPC Health Department
6/18/2021 8:33:23 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Kathy Andrew on behalf of EPC Environmental Services
6/18/2021 8:33:21 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Mindy Madden on behalf of EPC Code Enforcement
6/18/2021 8:33:19 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Edi Anderson on behalf of County Attorney - Water
6/18/2021 8:33:16 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review
6/18/2021 8:33:10 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Steve Schleiker on behalf of Assessor's Office
6/18/2021 8:33:08 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by John Green on behalf of PCD Project Manager
6/18/2021 8:33:05 AM Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 4 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/18/2021 7:47:02 AM Fees paid: 6/18/2021 (Receipt: 1004595)
6/15/2021 8:02:30 AM Payment Request sent: 6/15/2021
6/15/2021 8:02:29 AM File # Assigned: SF2124
6/15/2021 8:02:20 AM Submission Triaged
6/15/2021 7:57:03 AM Submission received from Applicant
6/12/2021 6:27:34 AM Submission request sent to Applicant
6/12/2021 6:27:18 AM Submission Triaged
6/10/2021 4:39:14 PM Submission received from Applicant
5/28/2021 7:45:00 AM Submission request sent to Applicant
5/26/2021 2:28:13 PM Project Manager Assigned: John Green
5/26/2021 2:28:13 PM Project Created