Project Details

Search


File Number
WSEO211
Project Name
WSE-O Pike Solar
Description
Request to develop 175 MW solar facility including single-axis tracker arrays with photovoltaic modules capable of generating up to 175 AC MW and a potential of 25MW Battery Energy Storage System. This project will have an 1,350-acre solar array siting envelope within the 4,998.37 Acres WSEO Boundary on land owned by the City of Colorado Springs . The project will also include 35-kv medium voltage feeders to the project substation, a centralized project substation and overhead high-voltage AC feeders to the Williams Creek substation. Expansion of the Williams Creek Substation and 230 kV lines are included in the 1041 request.
Parcels
5600000123 5600000123 5600000140 5600000140
Applicant
Pike Solar
Sophie Kiepe < ( skiepe@juwiamericas.com )
(310) 463-9796
Sophie Kiepe < ( skiepe@juwiamericas.com )
(310) 463-9796
EA Number
20-134
File Prefix
WSEO - Wind and/or Solar Energy Generation Plan Overlay
Year
2021
Project Manager
Kari Parsons
Status
Closed
Created
5/25/2021 7:38:47 AM

View: Review Comments



Additional Documents (20)

Link Document Comment
View Haul Route Approved
View Traffic Impact Study Accepted
View Mailing Packet: Notice, Map and Labels
View Posting Photo
View PC Staff Report with Attachments
View Email dated 7 20 22 retracting trail alignment
View CSU Letter retracting trail alignment
View PC Approval Letter
View Shoppers Press Confirmation
View Mailed BoCC Postcard Indicates new BoCC hearing date
View CSU Letter 2 12 22 No trail corridor at this time through property
View Email w/ attachments from SU to BOCC
View BOCC Staff Report
View PC Resolution
View Shoppers Press Confirmation Indicating New BoCC date March 1
View BoCC Resolution 22-66
View email regard to decommissioning plan suggestions from citizen
View BoCC Approval Letter
View Recorded Development Agreement
View Recorded Plat


Review Documents (61)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 7/6/2021 3:50:25 PM
View Application/Petition Form 1/20/2022 4:55:22 PM
View Legal Description (MS WORD Version required) 1/21/2022 10:51:48 AM
View Letter of Intent 2/11/2022 12:23:46 PM
View Title Commitment (Current within 30 days of submittal) 7/12/2021 11:02:14 AM
View Clearance Letter - Colorado Parks and Wildlife 6/21/2021 10:36:03 AM
View Clearance Letter - USF&W 6/21/2021 11:04:05 AM
View Determination of No Hazard from FAA 6/21/2021 10:36:03 AM
View Development Agreement (MS WORD version required-attachments included) 2/22/2022 2:06:50 PM
View Electromagnetic Interference Report 6/21/2021 10:36:02 AM
View Interconnect Agreement 6/21/2021 10:36:01 AM
View Mineral Rights Certification 6/30/2021 1:02:14 PM
View Neighborhood Meeting Summary 6/21/2021 1:26:51 PM
View Power Purchase Agreement 6/21/2021 10:35:59 AM
View Proof of Liability Insurance 7/6/2021 3:46:27 PM
View State Air Quality Permit 7/19/2021 2:00:09 PM
View US Army Corps of Engineer's Permit 6/21/2021 10:57:50 AM
View WSEO Overlay Map 2/14/2022 10:17:11 AM
View Haul Route Plan 11/9/2021 9:10:34 AM
View Lighting Plan 12/21/2021 4:52:34 PM
View Operations Plan 6/21/2021 10:35:59 AM
View Road condition survey 8/31/2021 6:42:26 PM
View Wetlands Analysis Report 6/21/2021 10:51:30 AM
View Wildlife Report 6/21/2021 10:51:32 AM
View Drainage Report - Final 11/8/2021 5:28:17 PM
View Natural Landforms, Vegetation, Riparian Analysis 6/23/2021 9:38:08 AM
View Noxious Weed Management Plan 6/21/2021 10:51:28 AM
View Soils & Geology Report 8/31/2021 5:37:19 PM
View Traffic Impact Study 11/8/2021 6:50:45 PM
View Wildland Fire & Hazard Mitigation Plan 6/21/2021 10:54:38 AM
View Maintenance Plan (MS Word version required) 6/21/2021 3:17:14 PM
View Appendix AL- Utility Request for Proposal 8/30/2021 11:52:12 AM
View Appendix AN - Geologic Hazards Study (per CGS) 8/31/2021 5:37:26 PM
View Appendix C- Vicinity Map 6/30/2021 12:54:46 PM
View Appendix G- Phase I Environmental Site Assessment 6/30/2021 12:54:47 PM
View Appendix G- Phase I Environmental Site Assessment 6/23/2021 11:27:47 AM
View Appendix O- PPRBD Correspondence 6/30/2021 12:54:52 PM
View Appendix P- Zoning Map 6/23/2021 12:21:41 PM
View Appendix Q- Air Quality Management Plan 6/30/2021 12:54:51 PM
View Appendix W- Emergency Response Plan 6/21/2021 11:02:39 AM
View Comment Response Memo 11/9/2021 12:19:49 PM
View Correspondence with CSU re: buffers in place 11/8/2021 4:51:55 PM
View Correspondence with Kinder Morgan re: Crossing Agreement 11/9/2021 3:40:26 PM
View Correspondence with Kinder Morgan re: Execution Timeline for Crossing Agreement 11/9/2021 3:40:27 PM
View Cultural Features Report 6/21/2021 10:36:13 AM
View Decommissioning Plan 6/21/2021 10:36:05 AM
View Drainage Report - Responses to Comments in Report 11/8/2021 4:51:54 PM
View Easements with Correspondence if not final 11/9/2021 3:40:25 PM
View Elevations 11/9/2021 9:38:41 AM
View GEC Plan - Responses to Comments on Plan 11/8/2021 4:51:53 PM
View GEC Report - SWMP (V2) 11/9/2021 1:25:55 PM
View Grading & Erosion Control Plan 11/9/2021 9:38:03 AM
View Kinder Morgan Pipeline Crossing Plan Overview - Sheet G108 11/9/2021 3:40:27 PM
View Kinder Morgan Pipeline Encroachment Sections Plan 11/9/2021 3:40:28 PM
View Noise Study 7/6/2021 2:57:08 PM
View PSCo Crossing License Agreement 097 - Executed 11/9/2021 12:19:47 PM
View PSCo Crossing License Agreement 098 - Executed 11/9/2021 12:19:49 PM
View PSCo Crossing License Agreement 099 - Executed 11/9/2021 12:19:50 PM
View Tri-State Crossing Agreement - Executed 11/9/2021 12:19:48 PM
View Visual Impact Analysis 6/21/2021 10:51:30 AM
View Water Will Serve Letter 11/4/2021 3:11:07 PM



Events (227)

Date Comment
3/7/2022 7:24:05 AM Submission request sent to Applicant
3/1/2022 4:23:57 PM Project Closed
3/1/2022 4:23:57 PM Project Approved: 3/1/2022
2/22/2022 2:41:05 PM Request for Review Comments returned by County Attorney - Development Review
2/22/2022 2:30:14 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Lori Seago on behalf of County Attorney - Development Review
2/22/2022 2:29:06 PM Submission Triaged
2/22/2022 2:07:12 PM Submission received from Applicant
2/22/2022 10:27:23 AM Submission request sent to Applicant
2/22/2022 10:24:09 AM Request for Review Comments returned by PCD Project Manager
2/17/2022 5:55:23 PM Submission Triaged
2/17/2022 3:40:08 PM Submission received from Applicant
2/17/2022 8:56:56 AM Submission request sent to Applicant
2/17/2022 7:48:04 AM Request for Review Comments returned by Fountain
2/16/2022 4:11:18 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Lori Seago on behalf of County Attorney - Development Review
2/15/2022 4:31:17 PM Submission Triaged
2/15/2022 4:30:46 PM Submission received from Applicant
2/15/2022 10:36:55 AM Request for Review Comments returned by EPC Parks Department
2/14/2022 11:47:45 AM Request for Review Comments returned by Colorado Department of Public Health and Environment
2/14/2022 8:54:45 AM Submission request sent to Applicant
2/14/2022 8:47:42 AM Submission request sent to Applicant
2/14/2022 7:00:37 AM Submission request sent to Applicant
2/14/2022 7:00:06 AM Submission Triaged
2/11/2022 12:30:40 PM Submission received from Applicant
2/7/2022 4:50:37 PM Submission request sent to Applicant
2/2/2022 3:22:06 PM Request for Review Comments returned by Hanover Fire Protection District
1/31/2022 11:30:44 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/31/2022 9:32:13 AM Request for Review Comments returned by El Paso County Conservation Dist
1/31/2022 8:43:19 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
1/30/2022 7:40:56 AM Request for Review Comments returned by Meadow Lake Airport Association
1/29/2022 9:45:51 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Susan Davies on behalf of Trails and Open Space Coalition
1/29/2022 9:45:49 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by General Email on behalf of Mountain View Electric Association, Inc.
1/29/2022 9:45:47 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Dave Elliott on behalf of Meadow Lake Airport Association
1/29/2022 9:45:44 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Grant Schmidt on behalf of Hanover SD 28
1/29/2022 9:45:42 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Hanover Fire Protection District
1/29/2022 9:45:40 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joel Stahn on behalf of Fountain Valley Power
1/29/2022 9:45:35 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kristy Martinez on behalf of Fountain
1/29/2022 9:45:33 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Paget on behalf of El Paso County Fire Marshall
1/29/2022 9:45:31 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
1/29/2022 9:45:26 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/29/2022 9:45:22 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Heather on behalf of City of Fountain Electric
1/29/2022 9:45:20 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/29/2022 9:45:18 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joe Valdez on behalf of Black Hills Energy-Aquila
1/29/2022 9:45:02 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
1/29/2022 9:45:00 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Justin Osborne on behalf of Colorado State Land Board
1/29/2022 9:44:56 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Tim Kroening on behalf of Colorado Parks and Wildlife
1/29/2022 9:44:54 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Wally Erickson on behalf of Colorado Division of Mining Reclamation
1/29/2022 9:44:48 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
1/29/2022 9:44:44 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Colorado Department of Public Health and Environment
1/29/2022 9:44:42 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Michael Diehl on behalf of Xcel Energy
1/29/2022 9:44:40 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
1/29/2022 9:44:38 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
1/29/2022 9:44:36 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
1/29/2022 9:44:34 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of EPC Parks Department
1/29/2022 9:44:32 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Catherine McGarvy on behalf of EPC Health Department
1/29/2022 9:44:22 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kari Parsons on behalf of PCD Project Manager
1/24/2022 7:19:23 AM Submission Triaged
1/21/2022 10:53:18 AM Submission received from Applicant
1/20/2022 3:09:05 PM Submission request sent to Applicant
1/20/2022 1:57:12 PM Submission request sent to Applicant
1/20/2022 8:51:33 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/20/2022 7:20:21 AM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/22/2021 4:46:07 PM Submission Triaged
12/22/2021 3:45:05 PM Submission received from Applicant
12/22/2021 10:56:12 AM Submission request sent to Applicant
12/22/2021 7:05:15 AM Submission Triaged
12/21/2021 4:53:36 PM Submission received from Applicant
12/17/2021 12:00:57 PM Request for Review Comments returned by PCD Engineering Division
12/14/2021 7:59:42 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
12/9/2021 8:50:13 AM Submission request sent to Applicant
12/9/2021 8:44:59 AM Request for Review Comments returned by PCD Project Manager
12/7/2021 10:18:42 AM Request for Review Comments returned by EPC Stormwater Review
12/5/2021 11:28:52 AM Request for Review Comments returned by Colorado Geological Survey
12/3/2021 2:30:13 PM Request for Review Comments returned by County Attorney - Development Review
12/3/2021 12:44:18 PM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
12/1/2021 3:36:00 PM Request for Review Comments returned by Parks Advisory Board
12/1/2021 3:34:48 PM Request for Review Comments returned by EPC Parks Department
11/30/2021 6:30:09 PM Request for Review Comments returned by Hanover Fire Protection District
11/30/2021 8:18:46 AM Request for Review Comments returned by Pikes Peak Regional Building Department
11/29/2021 10:41:43 AM Request for Review Comments returned by El Paso County Conservation Dist
11/23/2021 2:11:28 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/22/2021 11:11:34 AM Request for Review Comments returned by Woodmoor Water and Sanitation District
11/22/2021 7:33:16 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
11/14/2021 6:47:11 AM Request for Review Comments returned by Meadow Lake Airport Association
11/12/2021 1:28:35 PM Request for Review Comments returned by EPC Environmental Services
11/11/2021 2:04:29 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/10/2021 7:59:34 AM Request for Review Comments returned by Schriever AFB
11/10/2021 6:56:35 AM Request for Review Comments returned by RBD Floodplain
11/9/2021 4:16:38 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
11/9/2021 4:16:36 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Susan Davies on behalf of Trails and Open Space Coalition
11/9/2021 4:16:34 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Contact on behalf of Springs East Airport
11/9/2021 4:16:32 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
11/9/2021 4:16:29 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Darren Horstmeier on behalf of Schriever AFB
11/9/2021 4:16:27 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
11/9/2021 4:16:25 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Mr. Michael Shafer on behalf of Peterson AFB
11/9/2021 4:16:23 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
11/9/2021 4:16:21 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by General Email on behalf of Mountain View Electric Association, Inc.
11/9/2021 4:16:19 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Dave Elliott on behalf of Meadow Lake Airport Association
11/9/2021 4:16:17 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Grant Schmidt on behalf of Hanover SD 28
11/9/2021 4:16:14 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Hanover Fire Protection District
11/9/2021 4:16:12 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joel Stahn on behalf of Fountain Valley Power
11/9/2021 4:16:08 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kristy Martinez on behalf of Fountain
11/9/2021 4:16:06 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Paget on behalf of El Paso County Fire Marshall
11/9/2021 4:16:02 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
11/9/2021 4:16:00 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/9/2021 4:15:58 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
11/9/2021 4:15:56 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
11/9/2021 4:15:54 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Heather on behalf of City of Fountain Electric
11/9/2021 4:15:52 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
11/9/2021 4:15:50 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/9/2021 4:15:47 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/9/2021 4:15:44 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Keith Curtis on behalf of RBD Floodplain
11/9/2021 4:15:42 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/9/2021 4:15:40 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Fred Lundy on behalf of Lincoln County Land Use
11/9/2021 4:15:38 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
11/9/2021 4:15:35 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/9/2021 4:15:33 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/9/2021 4:15:31 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
11/9/2021 4:15:29 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Justin Osborne on behalf of Colorado State Land Board
11/9/2021 4:15:25 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Tim Kroening on behalf of Colorado Parks and Wildlife
11/9/2021 4:15:23 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/9/2021 4:15:20 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Wally Erickson on behalf of Colorado Division of Mining Reclamation
11/9/2021 4:15:15 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
11/9/2021 4:15:11 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Colorado Department of Public Health and Environment
11/9/2021 4:15:08 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Hunyadi on behalf of Colorado Dam Safety Division
11/9/2021 4:15:06 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Michael Diehl on behalf of Xcel Energy
11/9/2021 4:15:04 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Parks Advisory Board
11/9/2021 4:15:00 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/9/2021 4:14:58 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
11/9/2021 4:14:56 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
11/9/2021 4:14:54 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
11/9/2021 4:14:51 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of EPC Parks Department
11/9/2021 4:14:49 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Catherine McGarvy on behalf of EPC Health Department
11/9/2021 4:14:47 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Jim Schanel on behalf of EPC Fire Marshal
11/9/2021 4:14:45 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kathy Andrew on behalf of EPC Environmental Services
11/9/2021 4:14:43 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Lori Seago on behalf of County Attorney - Development Review
11/9/2021 4:14:37 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Steve Schleiker on behalf of Assessor's Office
11/9/2021 4:14:35 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kari Parsons on behalf of PCD Project Manager
11/9/2021 4:14:31 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/9/2021 3:56:44 PM Submission Triaged
11/9/2021 3:41:27 PM Submission received from Applicant
11/8/2021 4:06:38 PM Submission request sent to Applicant
11/8/2021 10:02:16 AM Submission request sent to Applicant
10/21/2021 1:10:16 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
10/14/2021 5:58:21 PM Request for Review Comments returned by County Attorney - Development Review
10/14/2021 11:18:29 AM Request for Review Comments returned by Parks Advisory Board
10/7/2021 2:45:01 PM Request for Review Comments returned by Fountain
10/6/2021 4:55:45 PM Submission request sent to Applicant
10/6/2021 4:53:06 PM Request for Review Comments returned by PCD Project Manager
10/6/2021 4:34:53 PM Request for Review Comments returned by PCD Engineering Division
10/6/2021 1:12:27 PM Request for Review Comments returned by EPC Stormwater Review
9/29/2021 9:41:09 AM Request for Review Comments returned by Woodmoor Water and Sanitation District
9/28/2021 5:31:05 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/27/2021 10:18:51 AM Request for Review Comments returned by El Paso County Conservation Dist
9/24/2021 12:51:11 PM Request for Review Comments returned by Colorado Geological Survey
9/23/2021 4:20:30 PM Request for Review Comments returned by Pikes Peak Regional Building Department
9/23/2021 10:04:53 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
9/22/2021 12:23:58 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Parks Advisory Board
9/21/2021 2:15:30 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/21/2021 11:30:29 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
9/16/2021 11:25:16 AM Request for Review Comments returned by EPC Parks Department
9/16/2021 10:45:25 AM Request for Review Comments returned by EPC Environmental Services
9/7/2021 8:57:09 AM Request for Review Comments returned by Schriever AFB
9/7/2021 8:05:53 AM Request for Review Comments returned by RBD Floodplain
9/3/2021 3:03:35 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
9/3/2021 3:03:33 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Susan Davies on behalf of Trails and Open Space Coalition
9/3/2021 3:03:31 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Contact on behalf of Springs East Airport
9/3/2021 3:03:28 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
9/3/2021 3:03:26 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Darren Horstmeier on behalf of Schriever AFB
9/3/2021 3:03:24 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
9/3/2021 3:03:22 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Mr. Michael Shafer on behalf of Peterson AFB
9/3/2021 3:03:20 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
9/3/2021 3:03:17 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by General Email on behalf of Mountain View Electric Association, Inc.
9/3/2021 3:03:15 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Dave Elliott on behalf of Meadow Lake Airport Association
9/3/2021 3:03:13 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Grant Schmidt on behalf of Hanover SD 28
9/3/2021 3:03:11 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Hanover Fire Protection District
9/3/2021 3:03:09 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joel Stahn on behalf of Fountain Valley Power
9/3/2021 3:03:07 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kristy Martinez on behalf of Fountain
9/3/2021 3:03:05 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Paget on behalf of El Paso County Fire Marshall
9/3/2021 3:03:03 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
9/3/2021 3:03:00 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/3/2021 3:02:58 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
9/3/2021 3:02:56 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
9/3/2021 3:02:54 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Heather on behalf of City of Fountain Electric
9/3/2021 3:02:52 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
9/3/2021 3:02:50 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joe Valdez on behalf of Black Hills Energy-Aquila
9/3/2021 3:02:48 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
9/3/2021 3:02:46 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Keith Curtis on behalf of RBD Floodplain
9/3/2021 3:02:44 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
9/3/2021 3:02:41 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Fred Lundy on behalf of Lincoln County Land Use
9/3/2021 3:02:39 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
9/3/2021 3:02:37 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
9/3/2021 3:02:35 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
9/3/2021 3:02:33 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
9/3/2021 3:02:31 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Justin Osborne on behalf of Colorado State Land Board
9/3/2021 3:02:29 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Tim Kroening on behalf of Colorado Parks and Wildlife
9/3/2021 3:02:27 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Colorado Geological Survey on behalf of Colorado Geological Survey
9/3/2021 3:02:25 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Wally Erickson on behalf of Colorado Division of Mining Reclamation
9/3/2021 3:02:22 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
9/3/2021 3:02:15 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of Colorado Department of Public Health and Environment
9/3/2021 3:02:12 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by John Hunyadi on behalf of Colorado Dam Safety Division
9/3/2021 3:02:10 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Michael Diehl on behalf of Xcel Energy
9/3/2021 3:02:08 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/3/2021 3:02:06 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
9/3/2021 3:02:04 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Bill Elder on behalf of EPC Sheriff's Department
9/3/2021 3:02:02 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
9/3/2021 3:02:00 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by on behalf of EPC Parks Department
9/3/2021 3:01:58 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Catherine McGarvy on behalf of EPC Health Department
9/3/2021 3:01:55 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Jim Schanel on behalf of EPC Fire Marshal
9/3/2021 3:01:53 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kathy Andrew on behalf of EPC Environmental Services
9/3/2021 3:01:51 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Lori Seago on behalf of County Attorney - Development Review
9/3/2021 3:01:45 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Steve Schleiker on behalf of Assessor's Office
9/3/2021 3:01:43 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Kari Parsons on behalf of PCD Project Manager
9/3/2021 3:01:41 PM Request for Review Comments email sent for Project WSE-O Pike Solar for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/3/2021 1:55:02 PM Fees paid: 9/3/2021 (Receipt: 1005045)
9/3/2021 8:53:36 AM Payment Request sent: 9/3/2021
9/3/2021 8:53:36 AM File # Assigned: WSEO211
9/3/2021 8:53:27 AM Submission Triaged
9/2/2021 4:19:57 PM Submission received from Applicant
9/1/2021 10:45:13 AM Submission request sent to Applicant
9/1/2021 7:22:54 AM Submission request sent to Applicant
9/1/2021 7:21:47 AM Submission request sent to Applicant
9/1/2021 7:21:23 AM Submission Triaged
8/31/2021 6:51:31 PM Submission received from Applicant
5/25/2021 8:03:40 AM Submission request sent to Applicant
5/25/2021 7:39:04 AM Project Manager Assigned: Kari Parsons
5/25/2021 7:39:04 AM EA Assigned: 20-134
5/25/2021 7:39:04 AM Project Created