Project Details

Search


File Number
AG2123
Description
Simple Post and beam steel storage building with a 30' x 40' footprint. Walls to be 14' high with a 4/1 pitched steel roof. 14' x14' slider doors on both ends and a single steel walk door on the SE side. Light to be provided by 2' evelight clear panels running down both long walls. Site to be graded with interior crown and floor material will be recycled asphalt. Project to be purchased from and erected by All Specialty Buildings of Calhan. Currently I do not plan on running power to the building. Location of the building is to be in the North East corner of Lot 7 Block 2 Equestrian Country with 35 foot setback from existing fence line. Building to be used for future livestock, storage of small animal feed, storage of fencing,posts and supplies (to fence in livestock), low gallonage irrigation materials, planting and maintenance supplies, as well as 2 small property tractors and their assorted implements. The tractors will be used for plowing and tilling the garden.
Parcels
2207001005 2207001005
Project Address
24355 Palomino Pl
Calhan, CO 80808
Applicant
Harry Thomas
Harry Thomas ( vern5776@gmail.com )
(970) 946-0502
Harry Thomas ( vern5776@gmail.com )
(970) 946-0502
File Prefix
AG - Agricultural Structure
Year
2021
Number of Structures
1
New Construction?
Yes
Estimated date of Completion
6/30/2021
Square Footage
1200
# Design Features
3
Exterior Appearance
Appropriately sized doors to allow for livestock and/or agricultural implements and machinery to enter and exit the structure (REQUIRED); Barn Breezeway; Barn Cupola; Appropriate siding material for weather exposure;
Use of the Structure
Shelter for livestock (including hen chickens) or for the storage of the feed and equipment relating to the care, training, raising, and/or maintenance of the livestock (including hen chickens);
Project Manager
Charles Carlisle
Status
Closed
Created
5/10/2021 1:30:12 PM

View: Review Comments | View Permit


Approved Documents (2)

Link Document
View Affidavit
View Site Plan Drawing


Review Documents (3)

Link Document Date
View Site Plan Drawing 5/10/2021 1:30:15 PM
View Page 2 Recorded Ag Structure Exemption Affadavit 6/3/2021 7:42:54 AM
View Ppage 3 Recorded Ag Structure Exemption Affadavit 6/3/2021 7:42:55 AM



Events (26)

Date Comment
10/25/2021 7:43:51 AM Project Closed
10/25/2021 7:43:51 AM Project Approved: 10/25/2021
10/25/2021 7:43:50 AM Compliance Verified
6/3/2021 9:42:39 AM Project Manager Assigned: Charles Carlisle
6/3/2021 9:42:24 AM Project reopened for Inspections
6/3/2021 9:32:54 AM Request for Approval returned by EPC Code Enforcement
6/3/2021 9:32:04 AM Request for Approval sent for Project 24355 PALOMINO PL for review by Mindy Madden on behalf of EPC Code Enforcement
6/3/2021 9:31:40 AM Submission Triaged
6/3/2021 7:43:44 AM Submission received from Applicant
6/2/2021 1:24:55 PM Submission request sent to Applicant
6/2/2021 1:24:46 PM Submission Triaged
6/1/2021 9:01:20 AM Submission received from Applicant
5/12/2021 10:59:15 AM Submission request sent to Applicant
5/12/2021 10:17:16 AM Request for Approval returned by PCD Site Plans
5/12/2021 10:05:53 AM Request for Approval sent for Project 24355 PALOMINO PL for review by Petra Rangel on behalf of PCD Site Plans
5/12/2021 10:04:33 AM Project Manager Assigned: Mindy Madden
5/11/2021 10:57:32 AM Fees paid: 5/11/2021 (Receipt: 1004403)
5/10/2021 1:30:16 PM Payment Request sent: 5/10/2021
5/10/2021 1:30:16 PM File # Assigned: AG2123
5/10/2021 1:30:15 PM Project Created
5/10/2021 1:30:12 PM Application Triaged/Accepted
5/6/2021 9:27:09 AM Application submitted
5/5/2021 1:23:08 PM Application Triaged/Returned for corrections
5/5/2021 11:08:58 AM Application submitted
5/5/2021 7:38:01 AM Application Triaged/Returned for corrections
5/3/2021 5:04:44 PM Application submitted