Project Details

Search


File Number
SF2210
Project Name
Cathedral Rock Commons Commercial Final Plat (Minor)
Description
Final plat for 3 commercial lots and tract for water detention. PRELIMINARY PLAN PENDING
Parcels
7136002035 7136002035
Applicant
YOW Architects PC
Brad Nichols ( bnichols@yowarch.com )
(719) 475-8133
Brad Nichols ( bnichols@yowarch.com )
(719) 475-8133
EA Number
EA2170
File Prefix
SF - Final Plat
Year
2022
Project Manager
Ryan Howser
Status
Closed
Created
4/28/2021 3:47:22 PM

View: Review Comments


Approved Documents (12)

Link Document
View Grading & Erosion Control checklist
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View MS4 Post Construction Form
View PBMP Applicability Form
View PDB/BMP Operations & Maintenance Manual
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)
View SWMP checklist
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Final


Additional Documents (5)

Link Document Comment
View Certificate of Taxes
View First American Title Insurance - File number NCS-1039140-PHX1
View Recorded Administrative Action - 223088497
View Stormwater Maintenance Agreement & Easement - Recorded 223088498
View Recorded Plat - 223715209


Review Documents (36)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 10/7/2021 11:18:17 AM
View Application/Petition Form 9/15/2022 11:01:53 AM
View Grading & Erosion Control checklist 10/14/2022 6:36:12 PM
View Legal Description (MS WORD Version required) 10/7/2021 11:21:53 AM
View Letter of Intent 3/22/2023 8:20:30 AM
View Title Commitment (Current within 30 days of submittal) 10/7/2021 11:21:57 AM
View Vicinity/Location Map 10/7/2021 11:21:58 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 3/10/2023 11:24:58 AM
View Financial Assurance Forms 3/9/2023 11:42:24 AM
View Mineral Rights Certification 10/7/2021 11:21:55 AM
View MS4 Post Construction Form 12/9/2022 1:22:04 PM
View PBMP Applicability Form 10/14/2022 6:36:13 PM
View PDB/BMP Operations & Maintenance Manual 10/5/2021 11:00:16 AM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 12/9/2022 1:22:05 PM
View SWMP checklist 10/14/2022 6:36:13 PM
View Construction Drawings (Plans/Profiles) 3/10/2023 11:24:57 AM
View Final Plat Drawings 10/5/2023 4:22:15 PM
View Grading & Erosion Control Plan 3/9/2023 11:42:26 AM
View Storm Water Management Plan (SWMP) 10/14/2022 6:36:12 PM
View Commitment letter from waste water service provider 9/15/2022 11:08:36 AM
View Commitment letter from water service provider 3/7/2022 4:43:32 PM
View Electric Provider Commitment Letter 10/7/2021 11:21:51 AM
View Fire Commitment Letter 10/18/2022 3:16:08 PM
View Natural Gas Commitment Letter 9/15/2022 10:55:32 AM
View Drainage Report - Final 3/9/2023 11:42:25 AM
View Fire Protection Report 9/15/2022 10:55:30 AM
View Natural Features Report 10/7/2021 11:21:55 AM
View Soils & Geology Report 9/15/2022 11:01:54 AM
View Subdivision Summary Sheet 12/30/2021 2:54:09 PM
View Traffic Impact Study 3/14/2023 8:20:56 AM
View Wastewater Treatment Report 12/21/2022 5:12:04 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 10/5/2023 4:17:44 PM
View Water Quality Report 12/30/2021 2:54:09 PM
View Water Resources Report 12/21/2022 5:12:08 PM
View Water Supply Information Summary 12/21/2022 5:12:11 PM
View Closures Sheet (Survey) 10/7/2021 11:18:19 AM



Events (136)

Date Comment
10/19/2023 4:24:03 PM Project Closed
10/19/2023 4:24:03 PM Project Approved: 10/19/2023
10/13/2023 5:12:37 PM Project Ready for Approval requests. Review Comment period is complete.
10/12/2023 8:25:02 AM Request for Review Comments returned by County Attorney - Development Review
10/5/2023 5:02:16 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
10/5/2023 5:01:44 PM Submission Triaged
10/5/2023 4:22:38 PM Submission received from Applicant
8/24/2023 1:24:28 PM Submission request sent to Applicant
8/24/2023 1:20:36 PM Request for Review Comments returned by County Attorney - Development Review
8/18/2023 1:47:33 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
8/10/2023 7:50:19 AM Submission request sent to Applicant
8/8/2023 3:00:45 PM Request for Review Comments returned by County Attorney - Development Review
7/28/2023 9:11:21 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
7/28/2023 9:10:49 AM Submission Triaged
7/27/2023 4:55:51 PM Submission received from Applicant
7/11/2023 2:54:40 PM Submission request sent to Applicant
7/11/2023 2:31:40 PM Request for Review Comments returned by County Attorney - Development Review
6/27/2023 8:44:29 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
6/27/2023 8:43:59 AM Submission Triaged
6/26/2023 8:53:39 AM Submission received from Applicant
6/23/2023 4:04:56 PM Submission request sent to Applicant
6/22/2023 3:09:56 PM Request for Review Comments returned by County Attorney - Development Review
6/22/2023 7:40:15 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
6/22/2023 7:39:52 AM Submission Triaged
6/21/2023 1:56:45 PM Submission received from Applicant
5/16/2023 8:14:45 AM Submission request sent to Applicant
4/18/2023 10:14:37 AM Request for Review Comments returned by County Attorney - Development Review
4/12/2023 2:48:26 PM Request for Review Comments returned by PCD Project Manager
4/11/2023 9:47:29 AM Request for Review Comments returned by PCD Engineering Division
4/4/2023 4:35:35 PM Request for Review Comments returned by EPC Stormwater Review
3/22/2023 9:07:33 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/22/2023 9:07:29 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
3/22/2023 9:07:26 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Ryan Howser on behalf of PCD Project Manager
3/22/2023 9:07:23 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/22/2023 9:05:01 AM Submission Triaged
3/22/2023 8:20:33 AM Submission received from Applicant
3/15/2023 10:51:23 AM Submission request sent to Applicant
3/15/2023 10:51:04 AM Submission Triaged
3/14/2023 4:01:03 PM Submission received from Applicant
3/10/2023 11:17:38 AM Submission request sent to Applicant
2/9/2023 1:45:19 PM Submission request sent to Applicant
2/9/2023 1:43:43 PM Request for Review Comments returned by PCD Project Manager
1/31/2023 4:39:30 PM Request for Review Comments returned by EPC Stormwater Review
1/31/2023 4:35:55 PM Request for Review Comments returned by PCD Engineering Division
1/19/2023 4:48:46 PM Request for Review Comments returned by County Attorney - Development Review
1/4/2023 7:27:47 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Shelia Booth on behalf of Monument
1/4/2023 7:27:44 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/4/2023 7:27:41 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
1/4/2023 7:27:39 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Ryan Howser on behalf of PCD Project Manager
1/4/2023 7:27:37 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/4/2023 7:15:43 AM Submission Triaged
1/3/2023 11:13:13 AM Submission received from Applicant
12/22/2022 12:04:41 PM Submission request sent to Applicant
12/22/2022 12:04:35 PM Submission Triaged
12/21/2022 5:12:22 PM Submission received from Applicant
11/15/2022 9:55:24 AM Submission request sent to Applicant
11/15/2022 9:52:59 AM Request for Review Comments returned by PCD Project Manager
11/15/2022 9:49:07 AM Request for Review Comments email resent for Project Cathedral Rock Commons Commercial Final Plat for review by Ryan Howser on behalf of PCD Project Manager
11/14/2022 10:57:13 AM Request for Review Comments returned by PCD Engineering Division
11/10/2022 1:01:28 PM Request for Review Comments returned by PCD Project Manager
11/8/2022 10:22:36 AM Request for Review Comments returned by EPC Stormwater Review
11/8/2022 8:47:04 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/7/2022 1:24:05 PM Request for Review Comments returned by Pikes Peak Regional Building Department
11/2/2022 9:52:43 AM Request for Review Comments returned by County Attorney - Water
10/19/2022 5:08:29 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
10/19/2022 5:08:27 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Meggan Herrington on behalf of Monument
10/19/2022 5:08:26 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
10/19/2022 5:08:24 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
10/19/2022 5:08:19 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Edi Anderson on behalf of County Attorney - Water
10/19/2022 5:08:17 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Ryan Howser on behalf of PCD Project Manager
10/19/2022 5:08:15 PM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
10/19/2022 5:06:48 PM Submission Triaged
10/19/2022 4:29:11 PM Submission received from Applicant
10/18/2022 9:24:24 AM Submission request sent to Applicant
10/18/2022 9:24:14 AM Submission Triaged
10/14/2022 7:03:46 PM Submission received from Applicant
5/14/2022 10:12:05 PM Request for Review Comments returned by EPC Health Department
4/27/2022 4:30:48 PM Submission request sent to Applicant
4/27/2022 4:25:46 PM Request for Review Comments returned by PCD Project Manager
4/27/2022 1:28:58 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
4/25/2022 2:44:42 PM Request for Review Comments returned by Colorado Geological Survey
4/25/2022 10:14:10 AM Request for Review Comments returned by Colorado Division of Water Resources
4/25/2022 8:42:10 AM Request for Review Comments returned by PCD Engineering Division
4/21/2022 10:18:25 AM Request for Review Comments returned by Pikes Peak Regional Building Department
4/19/2022 6:18:55 PM Request for Review Comments returned by EPC Stormwater Review
4/19/2022 2:03:23 PM Request for Review Comments returned by County Attorney - Development Review
4/18/2022 5:58:04 PM Request for Review Comments returned by El Paso County Conservation Dist
4/18/2022 3:11:19 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/18/2022 9:12:13 AM Request for Review Comments returned by USAFA Base Planner
4/18/2022 8:29:21 AM Request for Review Comments returned by Parks Advisory Board
4/18/2022 8:28:34 AM Request for Review Comments returned by EPC Parks Department
4/4/2022 7:17:25 AM Request for Review Comments returned by Academy SD 20 Building Fund
4/1/2022 3:05:44 PM Request for Review Comments returned by EPC Environmental Services
3/31/2022 11:32:57 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
3/31/2022 10:08:14 AM Request for Review Comments returned by Monument
3/31/2022 9:48:35 AM Request for Review Comments returned by County Attorney - Water
3/31/2022 7:50:03 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Elizabeth Dukes on behalf of USAFA Base Planner
3/31/2022 7:50:02 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
3/31/2022 7:50:00 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
3/31/2022 7:49:59 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Meggan Herrington on behalf of Monument
3/31/2022 7:49:58 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
3/31/2022 7:49:56 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Vern Champlin on behalf of Donald Wescott Fire Protection District
3/31/2022 7:49:55 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Mark Parker on behalf of Donala Water and San Dist
3/31/2022 7:49:54 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
3/31/2022 7:49:49 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
3/31/2022 7:49:48 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
3/31/2022 7:49:47 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
3/31/2022 7:49:45 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
3/31/2022 7:49:43 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/31/2022 7:49:42 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
3/31/2022 7:49:39 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by on behalf of Parks Advisory Board
3/31/2022 7:49:38 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/31/2022 7:49:36 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
3/31/2022 7:49:35 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
3/31/2022 7:49:34 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by on behalf of EPC Parks Department
3/31/2022 7:49:33 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
3/31/2022 7:49:22 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
3/31/2022 7:49:21 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Edi Anderson on behalf of County Attorney - Water
3/31/2022 7:49:20 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
3/31/2022 7:49:18 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Ryan Howser on behalf of PCD Project Manager
3/31/2022 7:49:17 AM Request for Review Comments email sent for Project Cathedral Rock Commons Commercial Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/8/2022 2:17:14 PM Fees paid: 3/8/2022 (Receipt: 1005964)
3/7/2022 5:28:45 PM Payment Request sent: 3/7/2022
3/7/2022 5:28:45 PM File # Assigned: SF2210
3/7/2022 5:28:36 PM Submission Triaged
3/7/2022 4:43:47 PM Submission received from Applicant
1/3/2022 7:49:21 AM Submission request sent to Applicant
1/3/2022 7:49:05 AM Submission Triaged
12/30/2021 4:58:57 PM Submission received from Applicant
10/9/2021 8:15:48 PM Submission request sent to Applicant
10/9/2021 8:15:37 PM Submission Triaged
10/7/2021 11:25:13 AM Submission received from Applicant
4/29/2021 4:46:33 PM Submission request sent to Applicant
4/28/2021 3:47:47 PM Project Manager Assigned: Ryan Howser
4/28/2021 3:47:47 PM EA Assigned: EA2170
4/28/2021 3:47:47 PM Project Created