4/4/2025 3:58:20 PM
|
Project Closed
|
4/4/2025 3:58:20 PM
|
Project Approved: 4/4/2025
|
12/17/2024 8:20:01 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
12/16/2024 9:14:35 PM
|
Request for Review Comments returned by EPC Health Department
|
12/12/2024 4:41:51 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
12/12/2024 4:41:49 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
12/12/2024 4:41:47 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
12/12/2024 4:40:19 PM
|
Submission Triaged
|
12/12/2024 3:55:40 PM
|
Submission received from Applicant
|
12/10/2024 2:47:02 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/6/2024 4:17:26 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
12/6/2024 4:17:24 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
12/6/2024 4:17:22 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
12/6/2024 4:16:45 PM
|
Submission request sent to Applicant
|
12/6/2024 4:16:27 PM
|
Submission Triaged
|
12/6/2024 4:07:18 PM
|
Submission received from Applicant
|
12/6/2024 2:37:00 PM
|
Request for Review Comments returned by EPC Health Department
|
12/6/2024 9:01:07 AM
|
Submission request sent to Applicant
|
12/6/2024 8:11:05 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/26/2024 11:54:09 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
11/26/2024 11:54:07 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
11/26/2024 11:54:05 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
11/26/2024 11:53:25 AM
|
Submission Triaged
|
11/26/2024 10:36:02 AM
|
Submission received from Applicant
|
11/26/2024 9:00:51 AM
|
Submission request sent to Applicant
|
11/25/2024 9:50:36 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/8/2024 11:45:05 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
11/8/2024 11:45:03 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
11/8/2024 11:45:01 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
11/8/2024 11:44:59 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
11/8/2024 11:44:58 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
11/8/2024 11:44:56 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
11/8/2024 11:43:03 AM
|
Submission Triaged
|
11/8/2024 11:02:20 AM
|
Submission received from Applicant
|
8/16/2024 3:03:25 PM
|
Submission request sent to Applicant
|
8/16/2024 2:58:44 PM
|
Request for Review Comments returned by EPC Health Department
|
8/16/2024 10:24:30 AM
|
Submission request sent to Applicant
|
7/28/2024 3:03:00 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/9/2024 2:42:17 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
7/9/2024 2:42:15 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
7/9/2024 2:42:13 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
7/9/2024 2:42:10 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
7/9/2024 2:42:08 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
7/9/2024 2:42:07 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
7/9/2024 2:39:23 PM
|
Submission Triaged
|
7/9/2024 2:10:02 PM
|
Submission received from Applicant
|
7/9/2024 1:40:24 PM
|
Submission request sent to Applicant
|
7/9/2024 1:39:27 PM
|
Submission Triaged
|
7/9/2024 11:01:35 AM
|
Submission received from Applicant
|
6/25/2024 4:59:23 PM
|
Submission request sent to Applicant
|
6/25/2024 11:50:02 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/21/2024 11:30:48 AM
|
Request for Review Comments returned by EPC Health Department
|
6/18/2024 1:16:47 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
6/18/2024 1:16:46 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
6/18/2024 1:16:44 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
6/18/2024 1:15:56 PM
|
Submission Triaged
|
6/18/2024 1:12:53 PM
|
Submission received from Applicant
|
5/23/2024 4:16:48 PM
|
Submission request sent to Applicant
|
5/23/2024 3:48:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/10/2024 9:16:14 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
5/10/2024 9:16:12 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
5/10/2024 9:16:10 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
5/10/2024 9:16:08 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
5/10/2024 9:16:06 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Erika Keech on behalf of County Attorney - Development Review
|
5/10/2024 9:16:04 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
5/10/2024 9:14:32 AM
|
Submission Triaged
|
5/10/2024 8:01:43 AM
|
Submission received from Applicant
|
3/14/2024 4:37:21 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/14/2024 8:02:46 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
3/14/2024 8:02:44 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
3/14/2024 8:02:42 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
3/12/2024 2:35:21 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/12/2024 2:35:19 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/15/2024 5:00:05 PM
|
Submission request sent to Applicant
|
2/15/2024 4:25:51 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/13/2024 8:22:30 AM
|
Submission request sent to Applicant
|
2/10/2024 2:30:15 PM
|
Request for Review Comments returned by EPC Health Department
|
2/1/2024 8:19:43 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/18/2024 4:55:54 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mike McCarthy on behalf of EPC Health Department
|
1/18/2024 4:55:52 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
1/18/2024 4:55:49 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by HEAEH LandUse on behalf of EPC Health Department
|
1/18/2024 4:55:47 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
1/18/2024 4:55:44 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
1/18/2024 4:53:28 PM
|
Submission Triaged
|
1/18/2024 4:11:41 PM
|
Submission received from Applicant
|
1/11/2024 10:18:39 AM
|
Submission request sent to Applicant
|
1/11/2024 10:18:03 AM
|
Submission Triaged
|
1/11/2024 8:59:44 AM
|
Submission received from Applicant
|
1/2/2024 2:10:58 PM
|
Submission request sent to Applicant
|
12/1/2023 9:50:09 AM
|
Submission request sent to Applicant
|
12/1/2023 9:39:31 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/21/2023 9:20:43 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
11/21/2023 9:20:41 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by April Willie on behalf of County Attorney - Development Review
|
11/21/2023 9:19:34 AM
|
Submission Triaged
|
11/21/2023 8:57:35 AM
|
Submission received from Applicant
|
11/20/2023 2:44:20 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/17/2023 4:09:57 PM
|
Submission request sent to Applicant
|
11/9/2023 12:51:39 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/1/2023 7:44:40 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/31/2023 5:04:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/30/2023 3:33:02 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/19/2023 3:09:26 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/19/2023 7:13:50 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/17/2023 5:17:16 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/17/2023 5:17:10 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/17/2023 5:17:06 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/17/2023 5:16:58 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by EHS Mike McCarthy on behalf of EPC Health Department
|
10/17/2023 5:16:38 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Edi Anderson on behalf of County Attorney - Water
|
10/17/2023 5:16:32 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
10/17/2023 5:16:30 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
|
10/17/2023 5:16:24 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 5:16:22 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Engineering Manager on behalf of PCD Engineering Division
|
10/17/2023 5:14:40 PM
|
Submission Triaged
|
10/17/2023 1:36:32 PM
|
Submission received from Applicant
|
10/13/2023 2:33:39 PM
|
Request for Review Comments returned by EPC Health Department
|
9/19/2023 7:37:32 AM
|
Submission request sent to Applicant
|
9/18/2023 11:14:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/15/2023 10:24:10 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/13/2023 5:29:19 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/12/2023 3:06:38 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/12/2023 1:37:38 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/7/2023 10:46:46 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/1/2023 3:42:34 PM
|
Request for Review Comments returned by County Attorney - Water
|
8/29/2023 12:27:55 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/22/2023 8:15:20 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/22/2023 8:15:19 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/22/2023 8:15:17 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/22/2023 8:15:14 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/22/2023 8:15:09 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by EHS Mike McCarthy on behalf of EPC Health Department
|
8/22/2023 8:14:59 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Edi Anderson on behalf of County Attorney - Water
|
8/22/2023 8:14:56 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
8/22/2023 8:14:55 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
|
8/22/2023 8:14:52 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Engineering Manager on behalf of PCD Engineering Division
|
8/22/2023 8:14:51 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Engineering Manager on behalf of PCD Engineering Division
|
8/22/2023 8:12:11 AM
|
Submission Triaged
|
8/19/2023 1:10:54 PM
|
Submission received from Applicant
|
8/18/2023 4:20:05 PM
|
Submission request sent to Applicant
|
8/18/2023 4:19:57 PM
|
Submission Triaged
|
8/18/2023 12:11:58 PM
|
Submission received from Applicant
|
4/21/2023 7:17:49 AM
|
Submission request sent to Applicant
|
4/20/2023 9:18:20 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/12/2023 1:15:04 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/29/2023 2:14:49 PM
|
Submission request sent to Applicant
|
3/29/2023 2:10:17 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/28/2023 12:49:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/28/2023 12:48:47 PM
|
Request for Review Comments email resent for Project Falcon Acres Final Plat (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
|
3/28/2023 8:11:14 AM
|
Submission request sent to Applicant
|
3/28/2023 8:09:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/28/2023 8:09:05 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/28/2023 8:05:43 AM
|
Request for Review Comments email resent for Project Falcon Acres Final Plat (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/28/2023 7:10:11 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/22/2023 6:15:16 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/21/2023 5:06:46 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/21/2023 3:42:50 PM
|
Request for Review Comments email resent for Project Falcon Acres Final Plat (Reconsideration) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/21/2023 12:59:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/21/2023 11:43:16 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/16/2023 11:00:37 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/28/2023 4:38:29 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
2/28/2023 4:38:28 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
2/28/2023 4:38:27 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
2/28/2023 4:38:23 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/28/2023 4:38:20 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
2/28/2023 4:38:11 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Edi Anderson on behalf of County Attorney - Water
|
2/28/2023 4:38:10 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
2/28/2023 4:38:09 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Ryan Howser on behalf of PCD Project Manager
|
2/28/2023 4:38:07 PM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/28/2023 4:27:16 PM
|
Submission Triaged
|
2/28/2023 3:51:03 PM
|
Submission received from Applicant
|
2/28/2023 3:16:11 PM
|
Submission request sent to Applicant
|
2/28/2023 3:15:59 PM
|
Submission Triaged
|
2/28/2023 11:54:54 AM
|
Submission received from Applicant
|
2/28/2023 11:31:53 AM
|
Submission request sent to Applicant
|
2/28/2023 11:29:40 AM
|
Submission request sent to Applicant
|
2/7/2023 8:22:35 AM
|
Project Manager Assigned: Ryan Howser
|
5/3/2022 7:23:47 PM
|
Project Manager Assigned: Kylie Bagley
|
3/19/2022 8:22:31 PM
|
Request for Review Comments returned by EPC Health Department
|
3/15/2022 7:50:49 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/15/2022 7:49:53 AM
|
Request for Review Comments email resent for Project Falcon Acres Final Plat (Reconsideration) for review by John Green on behalf of PCD Project Manager
|
3/7/2022 2:20:14 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/1/2022 7:51:48 AM
|
Submission request sent to Applicant
|
3/1/2022 7:49:52 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/1/2022 7:44:27 AM
|
Request for Review Comments email resent for Project Falcon Acres Final Plat (Reconsideration) for review by John Green on behalf of PCD Project Manager
|
2/28/2022 9:00:54 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/28/2022 2:17:03 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
2/25/2022 8:44:12 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/23/2022 4:36:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/18/2022 1:07:10 PM
|
Submission Triaged
|
2/17/2022 12:57:31 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
2/17/2022 12:24:25 PM
|
Submission received from Applicant
|
2/16/2022 1:27:18 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/15/2022 5:26:04 PM
|
Submission request sent to Applicant
|
2/15/2022 12:56:08 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/14/2022 11:26:21 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/14/2022 10:08:31 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/10/2022 5:15:33 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
2/8/2022 1:01:55 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/28/2022 11:01:38 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/26/2022 8:38:38 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/26/2022 8:36:07 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/21/2022 10:46:20 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/19/2022 11:07:52 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/19/2022 8:15:50 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
1/18/2022 9:47:51 AM
|
Request for Review Comments returned by County Attorney - Water
|
1/18/2022 8:45:29 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/18/2022 8:45:27 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Melissa Andrews on behalf of Falcon School District 49
|
1/18/2022 8:45:25 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
1/18/2022 8:45:23 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
1/18/2022 8:45:20 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
1/18/2022 8:45:18 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
1/18/2022 8:45:16 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
1/18/2022 8:45:14 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/18/2022 8:45:12 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
1/18/2022 8:45:10 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
|
1/18/2022 8:45:03 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/18/2022 8:45:00 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/18/2022 8:44:58 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
1/18/2022 8:44:50 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by on behalf of Parks Advisory Board
|
1/18/2022 8:44:48 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/18/2022 8:44:44 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
1/18/2022 8:44:42 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
1/18/2022 8:44:40 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by on behalf of EPC Parks Department
|
1/18/2022 8:44:38 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Catherine McGarvy on behalf of EPC Health Department
|
1/18/2022 8:44:25 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/18/2022 8:44:21 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Edi Anderson on behalf of County Attorney - Water
|
1/18/2022 8:44:19 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Lori Seago on behalf of County Attorney - Development Review
|
1/18/2022 8:44:16 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by John Green on behalf of PCD Project Manager
|
1/18/2022 8:44:14 AM
|
Request for Review Comments email sent for Project Falcon Acres Final Plat (Reconsideration) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/14/2022 10:09:29 AM
|
Fees paid: 1/14/2022 (Receipt: 1005643)
|
1/13/2022 10:49:52 AM
|
Project Manager Assigned: John Green
|
1/13/2022 10:49:35 AM
|
Payment Request sent: 1/13/2022
|
1/13/2022 10:49:35 AM
|
File # Assigned: SF223
|
1/13/2022 10:49:27 AM
|
Submission Triaged
|
1/13/2022 8:14:38 AM
|
Submission received from Applicant
|
12/19/2021 7:51:15 AM
|
Submission request sent to Applicant
|
12/19/2021 7:51:05 AM
|
Submission Triaged
|
12/14/2021 4:32:33 PM
|
Submission received from Applicant
|
3/29/2021 9:37:03 AM
|
Submission request sent to Applicant
|
3/25/2021 2:57:31 PM
|
Project Manager Assigned: Sophie Kiepe
|
3/25/2021 2:57:31 PM
|
Project Created
|