2/2/2024 7:26:45 AM
|
Project Closed
|
|
2/2/2024 7:26:45 AM
|
Project Approved: 2/2/2024
|
|
3/30/2023 2:04:49 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
|
3/28/2023 5:24:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
3/21/2023 8:57:36 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
3/21/2023 8:57:00 AM
|
Project reopened for Review Comments
|
|
3/21/2023 8:56:40 AM
|
Submission Triaged
|
|
3/17/2023 1:31:20 PM
|
Submission received from Applicant
|
|
3/14/2023 1:13:20 PM
|
Submission request sent to Applicant
|
|
10/20/2022 3:16:50 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
|
10/20/2022 2:37:13 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
10/19/2022 4:48:24 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
10/19/2022 4:47:53 PM
|
Submission Triaged
|
|
10/19/2022 4:30:59 PM
|
Submission received from Applicant
|
|
10/13/2022 10:24:25 AM
|
Submission request sent to Applicant
|
|
10/13/2022 10:01:12 AM
|
Project reopened for Review Comments
|
|
9/15/2022 10:29:48 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
|
9/7/2022 11:50:20 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
8/24/2022 8:45:30 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
8/24/2022 8:42:29 AM
|
Submission Triaged
|
|
8/22/2022 9:03:58 AM
|
Submission received from Applicant
|
|
8/19/2022 8:02:07 AM
|
Submission request sent to Applicant
|
|
8/19/2022 8:00:41 AM
|
Submission Triaged
|
|
8/18/2022 3:56:25 PM
|
Submission received from Applicant
|
|
8/16/2022 5:26:20 PM
|
Submission request sent to Applicant
|
|
8/11/2022 3:09:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
8/11/2022 11:13:35 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
8/4/2022 8:39:27 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
8/2/2022 5:01:51 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
8/2/2022 5:00:34 PM
|
Submission Triaged
|
|
8/2/2022 12:20:58 PM
|
Submission received from Applicant
|
|
7/28/2022 1:28:07 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
|
7/22/2022 3:17:13 PM
|
Submission request sent to Applicant
|
|
7/22/2022 3:14:59 PM
|
Submission Triaged
|
|
7/22/2022 1:10:04 PM
|
Submission received from Applicant
|
|
7/15/2022 4:26:12 PM
|
Submission request sent to Applicant
|
|
7/15/2022 4:24:27 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by on behalf of PCD Administrative Notice
|
|
7/12/2022 12:21:53 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
7/11/2022 8:17:37 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
7/9/2022 1:12:05 PM
|
Request for Review Comments returned by US Postal Service
|
|
7/8/2022 3:41:01 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
7/8/2022 12:47:41 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
7/7/2022 11:41:46 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
6/15/2022 12:32:05 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
6/15/2022 12:32:04 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elaine Kelly on behalf of US Postal Service
|
|
6/15/2022 12:32:02 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
6/15/2022 12:31:58 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
6/15/2022 12:31:56 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
|
6/15/2022 12:31:51 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
6/15/2022 12:31:50 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elena Krebs on behalf of PCD Administrative Notice
|
|
6/15/2022 12:26:25 PM
|
Submission Triaged
|
|
6/15/2022 9:19:48 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
|
6/14/2022 9:51:28 AM
|
Submission received from Applicant
|
|
6/3/2022 2:19:03 PM
|
Request for Review Comments returned by US Postal Service
|
|
6/2/2022 3:17:02 PM
|
Submission request sent to Applicant
|
|
6/2/2022 1:57:27 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
5/19/2022 10:21:38 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
5/18/2022 1:44:23 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
5/17/2022 4:10:37 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
5/17/2022 1:56:22 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
5/10/2022 4:42:49 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
5/6/2022 11:01:42 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
4/27/2022 11:53:29 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
4/27/2022 11:53:28 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
|
4/27/2022 11:53:26 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
4/27/2022 11:53:24 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
|
4/27/2022 11:53:23 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elaine Kelly on behalf of US Postal Service
|
|
4/27/2022 11:53:22 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
4/27/2022 11:53:19 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
4/27/2022 11:53:18 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
|
4/27/2022 11:53:16 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
4/27/2022 11:50:23 AM
|
Submission Triaged
|
|
4/25/2022 11:14:40 AM
|
Submission received from Applicant
|
|
3/18/2022 8:35:43 AM
|
Submission request sent to Applicant
|
|
3/18/2022 8:34:44 AM
|
Submission request sent to Applicant
|
|
3/18/2022 8:31:15 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
3/17/2022 2:11:58 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
3/16/2022 12:25:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
|
3/10/2022 11:59:26 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
3/10/2022 10:07:36 AM
|
Project Manager Assigned: Ryan Howser
|
|
3/3/2022 11:04:29 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
|
3/3/2022 11:04:27 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
|
2/28/2022 10:24:53 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
2/23/2022 2:40:20 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
2/23/2022 2:11:03 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
2/23/2022 8:39:45 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
|
2/23/2022 8:39:43 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Melissa Andrews on behalf of Falcon School District 49
|
|
2/23/2022 8:39:38 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
2/23/2022 8:39:35 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
|
2/23/2022 8:39:28 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
|
2/23/2022 8:39:24 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Terry Johns on behalf of Colorado Springs SD 11
|
|
2/23/2022 8:39:18 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
2/23/2022 8:39:14 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
|
2/23/2022 8:39:12 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
2/23/2022 8:39:10 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
|
2/23/2022 8:39:05 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
2/23/2022 8:31:48 AM
|
Submission Triaged
|
|
2/23/2022 8:22:52 AM
|
Submission received from Applicant
|
|
12/14/2021 7:43:37 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
|
12/14/2021 7:31:28 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
|
11/23/2021 8:18:21 PM
|
Request for Review Comments returned by EPC Health Department
|
|
11/6/2021 9:44:04 AM
|
Submission request sent to Applicant
|
|
11/6/2021 9:43:02 AM
|
Submission request sent to Applicant
|
|
11/5/2021 5:04:41 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
11/5/2021 9:44:40 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
11/2/2021 12:57:54 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
11/1/2021 11:43:55 AM
|
Request for Review Comments returned by Cimarron Hills Fire
|
|
10/30/2021 7:45:44 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
10/27/2021 5:45:15 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
10/27/2021 3:40:54 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
|
10/27/2021 3:26:27 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
10/27/2021 2:11:24 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
10/26/2021 8:59:45 AM
|
Submission Triaged
|
|
10/25/2021 4:20:46 PM
|
Submission received from Applicant
|
|
10/22/2021 11:34:25 AM
|
Request for Review Comments returned by EPC Parks Department
|
|
10/22/2021 11:33:15 AM
|
Request for Review Comments returned by Parks Advisory Board
|
|
10/21/2021 5:15:46 PM
|
Submission request sent to Applicant
|
|
10/18/2021 1:50:26 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
|
10/15/2021 4:02:44 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
10/14/2021 7:17:59 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
10/14/2021 7:16:25 AM
|
Submission Triaged
|
|
10/13/2021 12:18:09 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
10/12/2021 6:23:38 PM
|
Submission received from Applicant
|
|
10/9/2021 10:53:25 AM
|
Request for Review Comments returned by US Postal Service
|
|
10/8/2021 12:45:46 PM
|
Request for Review Comments returned by EPC Environmental Services
|
|
10/8/2021 11:55:40 AM
|
Submission request sent to Applicant
|
|
10/8/2021 11:53:27 AM
|
Submission Triaged
|
|
10/8/2021 9:29:37 AM
|
Submission received from Applicant
|
|
10/7/2021 1:29:50 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
10/7/2021 12:25:53 PM
|
Submission request sent to Applicant
|
|
10/7/2021 8:34:40 AM
|
Request for Review Comments returned by Central Marksheffel Metro
|
|
10/6/2021 3:51:13 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
|
10/6/2021 1:15:46 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
|
10/6/2021 1:15:43 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
|
10/6/2021 1:15:41 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Melissa Andrews on behalf of Falcon School District 49
|
|
10/6/2021 1:15:39 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
10/6/2021 1:15:37 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
|
10/6/2021 1:15:34 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
|
10/6/2021 1:15:32 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
10/6/2021 1:15:29 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Rebecca Hardekopf on behalf of Central Marksheffel Metro
|
|
10/6/2021 1:15:27 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
|
10/6/2021 1:15:25 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
|
10/6/2021 1:15:22 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
|
10/6/2021 1:15:20 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
10/6/2021 1:15:18 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elaine Kelly on behalf of US Postal Service
|
|
10/6/2021 1:15:16 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
10/6/2021 1:15:14 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Terry Johns on behalf of Colorado Springs SD 11
|
|
10/6/2021 1:15:12 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by on behalf of Parks Advisory Board
|
|
10/6/2021 1:15:08 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
10/6/2021 1:15:04 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
|
10/6/2021 1:15:02 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
|
10/6/2021 1:14:59 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by on behalf of EPC Parks Department
|
|
10/6/2021 1:14:57 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
|
10/6/2021 1:14:45 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
10/6/2021 1:14:42 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
|
10/6/2021 1:14:40 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
|
10/6/2021 1:14:36 PM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
10/5/2021 4:02:30 PM
|
Submission Triaged
|
|
10/5/2021 3:54:12 PM
|
Submission received from Applicant
|
|
8/17/2021 7:01:32 AM
|
Submission request sent to Applicant
|
|
8/9/2021 9:22:36 AM
|
Request for Review Comments returned by PCD Engineering Division
|
|
8/5/2021 11:05:21 AM
|
Request for Review Comments returned by PCD Project Manager
|
|
8/5/2021 11:02:08 AM
|
Request for Review Comments email resent for Project Meadowbrook Park Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
|
7/27/2021 3:53:15 PM
|
Request for Review Comments returned by PCD Project Manager
|
|
7/23/2021 11:32:26 AM
|
Request for Review Comments returned by Parks Advisory Board
|
|
7/21/2021 2:11:28 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
7/21/2021 1:59:02 PM
|
Request for Review Comments email resent for Project Meadowbrook Park Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
7/21/2021 11:38:24 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
|
7/21/2021 10:42:02 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
|
7/20/2021 3:42:12 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
|
7/20/2021 1:34:21 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
|
7/19/2021 3:47:10 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
|
7/19/2021 2:19:03 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
|
7/15/2021 3:01:18 PM
|
Request for Review Comments returned by EPC Environmental Services
|
|
7/14/2021 9:19:19 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
|
7/8/2021 3:34:25 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
7/6/2021 2:04:30 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
|
7/2/2021 12:13:18 PM
|
Request for Review Comments returned by EPC Parks Department
|
|
6/30/2021 9:32:14 AM
|
Request for Review Comments returned by Cimarron Hills Fire
|
|
6/30/2021 7:29:59 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
|
6/29/2021 12:32:32 PM
|
Request for Review Comments returned by Central Marksheffel Metro
|
|
6/29/2021 11:39:34 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
|
6/29/2021 11:39:32 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
|
6/29/2021 11:39:30 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Melissa Andrews on behalf of Falcon School District 49
|
|
6/29/2021 11:39:28 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
6/29/2021 11:39:26 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
|
6/29/2021 11:39:23 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
|
6/29/2021 11:39:21 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Jeff Munger on behalf of Cherokee Metro Dist
|
|
6/29/2021 11:39:19 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Rebecca Hardekopf on behalf of Central Marksheffel Metro
|
|
6/29/2021 11:39:17 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
|
6/29/2021 11:39:14 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
|
6/29/2021 11:39:12 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
|
6/29/2021 11:39:10 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
|
6/29/2021 11:39:08 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Elaine Kelly on behalf of US Postal Service
|
|
6/29/2021 11:39:05 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
6/29/2021 11:39:03 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
|
6/29/2021 11:39:01 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
|
6/29/2021 11:38:53 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Terry Johns on behalf of Colorado Springs SD 11
|
|
6/29/2021 11:38:51 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by on behalf of Parks Advisory Board
|
|
6/29/2021 11:38:49 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
|
6/29/2021 11:38:43 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
|
6/29/2021 11:38:41 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
|
6/29/2021 11:38:39 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by on behalf of EPC Parks Department
|
|
6/29/2021 11:38:37 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
|
6/29/2021 11:38:24 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
6/29/2021 11:38:21 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
|
6/29/2021 11:38:18 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
|
6/29/2021 11:38:16 AM
|
Request for Review Comments email sent for Project Meadowbrook Park Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
|
6/29/2021 9:49:41 AM
|
Fees paid: 6/29/2021 (Receipt: 1004666)
|
|
6/15/2021 1:24:19 PM
|
Payment Request sent: 6/15/2021
|
|
6/15/2021 1:24:19 PM
|
File # Assigned: SF2125
|
|
6/15/2021 1:24:08 PM
|
Submission Triaged
|
|
6/15/2021 12:38:38 PM
|
Submission received from Applicant
|
|
6/15/2021 11:30:24 AM
|
Submission request sent to Applicant
|
|
6/15/2021 11:30:09 AM
|
Submission Triaged
|
|
6/15/2021 8:24:59 AM
|
Submission received from Applicant
|
|
6/9/2021 8:04:09 AM
|
Submission request sent to Applicant
|
|
6/9/2021 8:02:14 AM
|
Submission request sent to Applicant
|
|
6/9/2021 8:01:55 AM
|
Submission Triaged
|
|
6/8/2021 2:18:02 PM
|
Submission received from Applicant
|
|
3/24/2021 12:00:31 PM
|
Submission request sent to Applicant
|
|
3/24/2021 11:23:40 AM
|
Project Manager Assigned: Kari Parsons
|
|
3/24/2021 11:23:40 AM
|
EA Assigned: EA2064
|
|
3/24/2021 11:23:40 AM
|
Project Created
|