Project Details

Search


File Number
CDR2113
Project Name
CDR - Briargate Parkway at Sand Creek Channel Bridge
Description
Construction Drawings for Briargate Parkway crossing Sand Creek Channel
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
File Prefix
CDR - Construction Drawing Review
Year
2021
Project Manager
Kari Parsons
Status
Closed
Created
3/19/2021 12:39:05 PM

View: Review Comments


Approved Documents (12)

Link Document
View Financial Assurance Forms
View Grading & Erosion Control checklist
View SWMP checklist
View Construction Drawings (Plans/Profiles)
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Bridge Design Report
View ESQCP
View Geo tech supplement
View Interpretation Letter
View PBMP Applicability Form
View Subcontractor back check


Additional Documents (1)

Link Document Comment
View Preliminary Release


Review Documents (33)

Link Document Date
View Letter of Intent 5/4/2022 8:42:24 AM
View Vicinity/Location Map 9/8/2021 5:02:14 PM
View Financial Assurance Forms 7/1/2022 10:09:48 AM
View Grading & Erosion Control checklist 5/4/2022 8:42:26 AM
View SWMP checklist 7/1/2022 10:09:49 AM
View US Army Corps of Engineer's Permit 8/19/2021 4:44:12 AM
View Construction Drawings (Plans/Profiles) 7/1/2022 10:09:46 AM
View Grading & Erosion Control Plan 7/1/2022 10:09:48 AM
View Storm Water Management Plan (SWMP) 7/1/2022 10:09:49 AM
View Soils & Geology Report 3/9/2022 7:36:07 AM
View Arch Report 7/28/2022 9:18:37 PM
View Bridge Design Report 7/1/2022 10:09:50 AM
View Bridge Specs 5/4/2022 8:42:32 AM
View Bristlecone Letter 3/8/2022 5:52:49 PM
View CAD file 7/28/2022 9:18:34 PM
View CD's 7/28/2022 9:18:35 PM
View Comment Response Letter 5/4/2022 8:42:27 AM
View Comments 7/1/2022 10:09:52 AM
View Construction Drawings updated 5/4/2022 8:42:30 AM
View Design Report - Arch 5/4/2022 8:42:29 AM
View Design Report - Bridge Footer 5/4/2022 8:42:28 AM
View Drainage Letter 3/8/2022 5:52:39 PM
View ESQCP 5/4/2022 8:42:28 AM
View ESQCP 7/1/2022 10:09:51 AM
View GEC 7/28/2022 9:18:36 PM
View Geo tech supplement 5/4/2022 8:42:32 AM
View Independent Design Review 7/1/2022 10:09:50 AM
View Indi Review Letter Foundation 7/28/2022 9:18:38 PM
View PBMP Applicability Form 5/4/2022 8:42:27 AM
View Soils Report 7/1/2022 10:09:51 AM
View Specifications 3/31/2022 2:31:18 PM
View Subcontractor back check 5/4/2022 8:42:31 AM
View subcontractor review 5/4/2022 8:42:31 AM



Events (150)

Date Comment
8/15/2022 9:02:11 AM Project Closed
8/15/2022 9:02:11 AM Project Approved: 8/15/2022
8/3/2022 2:02:11 PM Submission request sent to Applicant
8/3/2022 2:01:29 PM Request for Review Comments returned by PCD Project Manager
8/3/2022 11:43:27 AM Request for Review Comments returned by PCD Engineering Division
8/1/2022 7:41:02 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Kari Parsons on behalf of PCD Project Manager
8/1/2022 7:41:00 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/1/2022 7:40:00 AM Submission Triaged
7/28/2022 9:18:45 PM Submission received from Applicant
7/25/2022 8:34:09 AM Request for Review Comments returned by Colorado Springs Public Works
7/12/2022 11:58:51 AM Submission request sent to Applicant
7/12/2022 8:05:21 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/11/2022 7:31:19 AM Request for Review Comments returned by PCD Project Manager
7/8/2022 5:27:43 PM Request for Review Comments returned by EPC Stormwater Review
7/8/2022 3:55:41 PM Request for Review Comments returned by Traffic Review Consultant
7/8/2022 8:25:50 AM Request for Review Comments returned by PCD Engineering Division
7/7/2022 3:42:49 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/3/2022 10:51:59 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by General Email on behalf of Mountain View Electric Association, Inc.
7/3/2022 10:51:56 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/3/2022 10:51:52 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Rae Carlson on behalf of Colorado Springs Public Works
7/3/2022 10:51:36 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
7/3/2022 10:51:29 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
7/3/2022 10:51:29 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/3/2022 10:51:13 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Paul Brown on behalf of Traffic Review Consultant
7/3/2022 10:51:11 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/3/2022 10:51:10 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/3/2022 10:51:05 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Kari Parsons on behalf of PCD Project Manager
7/3/2022 10:51:03 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/3/2022 10:48:57 AM Submission Triaged
7/1/2022 10:09:57 AM Submission received from Applicant
6/3/2022 3:49:51 PM Request for Review Comments returned by Colorado Springs Public Works
6/3/2022 2:09:22 PM Submission request sent to Applicant
6/3/2022 11:58:04 AM Request for Review Comments returned by PCD Engineering Division
6/2/2022 1:30:48 PM Request for Review Comments returned by PCD Project Manager
6/1/2022 7:01:13 AM Submission request sent to Applicant
5/31/2022 3:56:42 PM Request for Review Comments returned by EPC Stormwater Review
5/18/2022 4:33:27 PM Request for Review Comments returned by Traffic Review Consultant
5/13/2022 9:26:21 AM Fees paid: 5/13/2022 (Receipt: 1006321)
5/12/2022 10:36:54 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/11/2022 7:19:22 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/10/2022 9:00:16 AM Payment Request sent: 5/10/2022
5/10/2022 8:58:56 AM Payment Request canceled: 5/10/2022
5/4/2022 8:59:36 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by General Email on behalf of Mountain View Electric Association, Inc.
5/4/2022 8:59:32 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/4/2022 8:59:28 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Rae Carlson on behalf of Colorado Springs Public Works
5/4/2022 8:59:16 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
5/4/2022 8:59:09 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
5/4/2022 8:59:07 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Joe Valdez on behalf of Black Hills Energy-Aquila
5/4/2022 8:59:06 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Paul Brown on behalf of Traffic Review Consultant
5/4/2022 8:59:04 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
5/4/2022 8:59:02 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/4/2022 8:59:00 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Kari Parsons on behalf of PCD Project Manager
5/4/2022 8:58:58 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/4/2022 8:57:00 AM Payment Request sent: 5/4/2022
5/4/2022 8:56:43 AM Submission Triaged
5/4/2022 8:42:59 AM Submission received from Applicant
4/13/2022 4:09:36 PM Request for Review Comments returned by Colorado Springs Public Works
4/11/2022 7:24:35 AM Submission request sent to Applicant
4/11/2022 7:07:33 AM Request for Review Comments returned by PCD Project Manager
4/7/2022 7:35:03 PM Request for Review Comments returned by PCD Engineering Division
3/31/2022 2:58:15 PM Submission Triaged
3/31/2022 2:31:46 PM Submission received from Applicant
3/31/2022 8:50:15 AM Submission request sent to Applicant
3/30/2022 3:38:21 PM Request for Review Comments returned by Traffic Review Consultant
3/28/2022 11:11:54 AM Request for Review Comments returned by EPC Stormwater Review
3/14/2022 3:38:14 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/9/2022 11:14:27 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/9/2022 11:14:19 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Rae Carlson on behalf of Colorado Springs Public Works
3/9/2022 11:13:59 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Paul Brown on behalf of Traffic Review Consultant
3/9/2022 11:13:55 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/9/2022 11:13:50 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
3/9/2022 11:13:48 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Kari Parsons on behalf of PCD Project Manager
3/9/2022 11:13:44 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sand Creek Channel Bridge for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/9/2022 11:12:30 AM Payment Request canceled: 3/9/2022
3/9/2022 11:10:21 AM Payment Request sent: 3/9/2022
3/9/2022 11:08:40 AM Submission Triaged
3/9/2022 7:36:30 AM Submission received from Applicant
3/9/2022 6:55:18 AM Submission request sent to Applicant
3/9/2022 6:53:47 AM Submission Triaged
3/8/2022 5:53:57 PM Submission received from Applicant
2/25/2022 6:48:49 AM Fees paid: 2/25/2022 (Receipt: 1005890)
2/24/2022 9:49:41 AM Payment Request sent: 2/24/2022
1/29/2022 9:13:23 AM Submission request sent to Applicant
1/29/2022 9:12:45 AM Request for Review Comments returned by PCD Project Manager
1/28/2022 4:07:56 PM Request for Review Comments returned by PCD Engineering Division
1/28/2022 8:07:02 AM Request for Review Comments returned by Traffic Review Consultant
1/27/2022 10:00:28 AM Request for Review Comments returned by Colorado Springs Public Works
1/25/2022 9:41:57 PM Request for Review Comments returned by EPC Stormwater Review
1/25/2022 1:43:58 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/18/2022 10:09:13 AM Fees paid: 1/18/2022 (Receipt: 1005658)
1/13/2022 10:42:29 AM Submission Triaged
1/13/2022 8:01:04 AM Submission received from Applicant
1/13/2022 7:59:28 AM Submission request sent to Applicant
1/6/2022 7:10:00 AM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Paul Brown on behalf of Traffic Review Consultant
1/5/2022 5:09:31 PM Payment Request sent: 1/5/2022
1/5/2022 3:08:08 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by General Email on behalf of Mountain View Electric Association, Inc.
1/5/2022 3:07:54 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Rae Carlson on behalf of Colorado Springs Public Works
1/5/2022 3:07:33 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
1/5/2022 3:07:19 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/5/2022 3:07:17 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Joe Valdez on behalf of Black Hills Energy-Aquila
1/5/2022 3:07:11 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/5/2022 3:07:07 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
1/5/2022 3:07:05 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Kari Parsons on behalf of PCD Project Manager
1/5/2022 3:07:01 PM Request for Review Comments email sent for Project CDR - Briargate Parkway at Sandcreek Channel Bridge for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/5/2022 3:05:46 PM Submission request canceled
1/5/2022 2:57:42 PM Submission request sent to Applicant
1/5/2022 7:42:26 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by General Email on behalf of Mountain View Electric Association, Inc.
1/5/2022 7:42:17 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/5/2022 7:42:05 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Rae Carlson on behalf of Colorado Springs Public Works
1/5/2022 7:41:40 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
1/5/2022 7:41:25 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/5/2022 7:41:23 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Joe Valdez on behalf of Black Hills Energy-Aquila
1/5/2022 7:41:17 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/5/2022 7:41:12 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
1/5/2022 7:41:10 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Kari Parsons on behalf of PCD Project Manager
1/5/2022 7:41:06 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/5/2022 7:39:55 AM Submission request canceled
1/5/2022 7:31:59 AM Submission request sent to Applicant
12/15/2021 8:18:22 AM Submission request sent to Applicant
12/15/2021 8:18:03 AM Submission Triaged
12/14/2021 4:46:40 PM Submission received from Applicant
11/16/2021 5:15:48 PM Set Applicant to N.E.S.
10/28/2021 12:08:27 PM Request for Review Comments returned by CIG Colorado Interstate Gas
10/21/2021 2:17:07 PM Submission request sent to Applicant
10/21/2021 2:12:02 PM Request for Review Comments returned by PCD Project Manager
10/21/2021 2:04:49 PM Request for Review Comments returned by PCD Engineering Division
10/11/2021 9:20:39 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/7/2021 1:48:49 PM Request for Review Comments email resent for Project CDR Briargate Parkway at Sandcreek Channel for review by General Email on behalf of Mountain View Electric Association, Inc.
10/7/2021 1:40:14 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/7/2021 9:04:58 AM Request for Review Comments returned by Colorado Springs Public Works
10/6/2021 9:57:51 AM Request for Review Comments returned by EPC Stormwater Review
9/30/2021 9:23:09 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/14/2021 8:41:26 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by General Email on behalf of Mountain View Electric Association, Inc.
9/14/2021 8:41:18 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/14/2021 8:41:16 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Rae Carlson on behalf of Colorado Springs Public Works
9/14/2021 8:40:50 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
9/14/2021 8:40:35 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
9/14/2021 8:40:33 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Joe Valdez on behalf of Black Hills Energy-Aquila
9/14/2021 8:40:30 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/14/2021 8:40:26 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
9/14/2021 8:40:24 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Kari Parsons on behalf of PCD Project Manager
9/14/2021 8:40:22 AM Request for Review Comments email sent for Project CDR Briargate Parkway at Sandcreek Channel for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/10/2021 8:40:19 PM Project Manager Assigned: Kari Parsons
9/10/2021 11:29:28 AM Fees paid: 9/10/2021 (Receipt: 1005078)
9/9/2021 12:43:23 PM Payment Request sent: 9/9/2021
9/9/2021 12:43:23 PM File # Assigned: CDR2113
9/9/2021 12:43:10 PM Submission Triaged
9/9/2021 10:47:42 AM Submission received from Applicant
3/19/2021 12:42:34 PM Submission request sent to Applicant
3/19/2021 12:39:45 PM Project Created