8/20/2025 9:21:11 AM
|
Submission request sent to Applicant
|
8/20/2025 8:58:20 AM
|
Project reopened for Review Comments
|
5/27/2025 11:07:10 AM
|
Project Closed
|
5/27/2025 11:07:10 AM
|
Project Approved: 5/27/2025
|
4/7/2025 8:13:16 AM
|
Submission request sent to Applicant
|
9/6/2024 2:58:08 PM
|
Project reopened for Review Comments
|
9/6/2024 2:56:19 PM
|
Submission request sent to Applicant
|
6/26/2024 11:24:07 AM
|
Project Closed
|
6/26/2024 11:24:07 AM
|
Project Approved: 6/26/2024
|
6/25/2024 10:49:43 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/20/2024 7:05:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/19/2024 4:34:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/13/2024 9:59:18 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/10/2024 7:07:11 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/10/2024 7:07:09 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/10/2024 7:07:07 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/10/2024 7:07:06 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Christina Prete on behalf of EPC Stormwater Review
|
6/10/2024 7:07:03 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Lori Seago on behalf of County Attorney - Development Review
|
6/10/2024 7:07:01 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Erika Keech on behalf of County Attorney - Development Review
|
6/10/2024 7:07:00 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by April Willie on behalf of County Attorney - Development Review
|
6/10/2024 7:06:58 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
6/10/2024 7:06:54 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/10/2024 7:06:51 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Engineering Manager on behalf of PCD Engineering Division
|
6/10/2024 7:03:28 AM
|
Submission request canceled
|
6/10/2024 7:02:28 AM
|
Submission request sent to Applicant
|
6/10/2024 7:01:59 AM
|
Submission Triaged
|
6/7/2024 10:42:18 AM
|
Submission received from Applicant
|
5/20/2024 12:47:09 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/20/2024 12:41:54 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/20/2024 12:41:52 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/20/2024 12:41:50 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/20/2024 12:41:48 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Christina Prete on behalf of EPC Stormwater Review
|
5/20/2024 11:40:28 AM
|
Submission request sent to Applicant
|
5/20/2024 11:40:16 AM
|
Project Manager Assigned: Kari Parsons
|
5/20/2024 11:39:29 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/20/2024 8:31:39 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/20/2024 8:28:06 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/15/2024 3:41:04 PM
|
Project Manager Assigned: Jeff Rice
|
5/6/2024 9:56:00 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/6/2024 9:55:58 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/6/2024 9:55:56 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/6/2024 9:55:55 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Christina Prete on behalf of EPC Stormwater Review
|
5/6/2024 9:55:52 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
5/6/2024 9:55:50 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/6/2024 9:55:48 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Engineering Manager on behalf of PCD Engineering Division
|
5/6/2024 9:53:52 AM
|
Submission Triaged
|
5/6/2024 9:24:06 AM
|
Submission received from Applicant
|
4/16/2024 4:47:58 PM
|
Project reopened for Review Comments
|
4/16/2024 4:24:16 PM
|
Submission request sent to Applicant
|
7/26/2023 7:52:01 AM
|
Project Closed
|
7/26/2023 7:52:01 AM
|
Project Approved: 7/26/2023
|
7/25/2023 3:07:01 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Rae Carlson on behalf of Colorado Springs Public Works
|
7/25/2023 3:06:51 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
7/25/2023 3:06:51 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/25/2023 3:06:09 PM
|
Submission Triaged
|
7/25/2023 11:53:19 AM
|
Submission received from Applicant
|
7/24/2023 11:58:02 AM
|
Submission request sent to Applicant
|
7/24/2023 11:56:09 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/24/2023 10:26:48 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/24/2023 8:26:24 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/17/2023 3:43:19 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/3/2023 9:06:42 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
7/3/2023 9:06:41 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/3/2023 9:03:45 AM
|
Submission Triaged
|
7/1/2023 8:49:33 AM
|
Submission received from Applicant
|
6/5/2023 7:04:13 AM
|
Submission request sent to Applicant
|
6/5/2023 7:03:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/1/2023 12:13:17 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/1/2023 7:18:56 AM
|
Request for Review Comments returned by PCD Engineering Division
|
5/31/2023 5:20:18 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/30/2023 8:03:32 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
5/11/2023 11:05:47 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/9/2023 4:01:54 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/9/2023 4:01:51 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/9/2023 4:01:47 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Rae Carlson on behalf of Colorado Springs Public Works
|
5/9/2023 4:01:38 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
5/9/2023 4:01:32 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
5/9/2023 4:01:31 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
5/9/2023 4:01:28 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/9/2023 4:01:24 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
5/9/2023 4:01:23 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
5/9/2023 4:01:21 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/9/2023 3:59:51 PM
|
Submission Triaged
|
5/9/2023 3:03:28 PM
|
Submission received from Applicant
|
2/14/2023 4:32:07 PM
|
Submission request sent to Applicant
|
2/14/2023 3:39:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/14/2023 3:00:37 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/7/2023 3:19:30 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/7/2023 8:14:47 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
2/6/2023 7:07:27 AM
|
Submission request sent to Applicant
|
1/17/2023 7:34:18 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Rae Carlson on behalf of Colorado Springs Public Works
|
1/17/2023 7:34:08 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/17/2023 7:34:05 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
1/17/2023 7:34:04 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
1/17/2023 7:34:02 AM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/17/2023 7:31:51 AM
|
Submission Triaged
|
1/16/2023 8:12:48 AM
|
Submission received from Applicant
|
6/21/2022 8:14:50 AM
|
Submission request sent to Applicant
|
6/21/2022 7:24:20 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/15/2022 11:11:37 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/14/2022 7:48:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/19/2022 12:07:03 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/19/2022 12:07:01 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
5/19/2022 12:07:00 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
5/19/2022 12:06:58 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/19/2022 12:05:51 PM
|
Submission Triaged
|
5/19/2022 10:21:56 AM
|
Submission received from Applicant
|
4/13/2022 4:07:40 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
4/12/2022 8:20:09 AM
|
Submission request sent to Applicant
|
4/11/2022 6:21:23 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/11/2022 4:59:16 PM
|
Submission request sent to Applicant
|
4/11/2022 4:57:50 PM
|
Submission request sent to Applicant
|
4/11/2022 4:57:06 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/11/2022 4:53:10 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
4/11/2022 4:51:58 PM
|
Submission request canceled
|
4/11/2022 3:37:43 PM
|
Request for Review Comments email resent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/11/2022 8:02:24 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/7/2022 3:23:41 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/5/2022 4:36:25 PM
|
Submission request sent to Applicant
|
3/22/2022 5:30:37 PM
|
Submission Triaged
|
3/22/2022 5:13:40 PM
|
Submission received from Applicant
|
3/22/2022 7:49:38 AM
|
Submission request sent to Applicant
|
3/17/2022 3:39:42 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Rae Carlson on behalf of Colorado Springs Public Works
|
3/17/2022 3:39:22 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
3/17/2022 3:39:18 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/17/2022 3:39:14 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
3/17/2022 3:39:12 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
3/17/2022 3:39:07 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/17/2022 3:38:03 PM
|
Submission Triaged
|
3/17/2022 3:11:45 PM
|
Submission received from Applicant
|
2/10/2022 4:16:44 PM
|
Submission request sent to Applicant
|
2/10/2022 4:14:34 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/10/2022 4:12:53 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/7/2022 12:41:42 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/31/2022 3:46:30 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
1/31/2022 1:07:47 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/12/2022 3:01:11 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/11/2022 2:43:04 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/11/2022 2:42:56 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/11/2022 2:42:54 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Rae Carlson on behalf of Colorado Springs Public Works
|
1/11/2022 2:42:27 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
1/11/2022 2:42:12 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
1/11/2022 2:42:10 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
1/11/2022 2:42:02 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/11/2022 2:41:58 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
1/11/2022 2:41:56 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Kari Parsons on behalf of PCD Project Manager
|
1/11/2022 2:41:54 PM
|
Request for Review Comments email sent for Project CDR Briargate Parkway/ Sterling Road for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/10/2022 7:24:50 AM
|
Fees paid: 1/10/2022 (Receipt: 1005614)
|
1/3/2022 7:53:41 AM
|
Payment Request sent: 1/3/2022
|
1/3/2022 7:53:41 AM
|
File # Assigned: CDR221
|
1/3/2022 7:53:25 AM
|
Submission Triaged
|
12/31/2021 2:11:56 PM
|
Submission received from Applicant
|
3/19/2021 12:37:25 PM
|
Submission request sent to Applicant
|
3/19/2021 12:35:27 PM
|
Project Manager Assigned: Kari Parsons
|
3/19/2021 7:34:19 AM
|
Project Created
|