9/15/2022 10:26:33 AM
|
Project Closed
|
9/15/2022 10:26:33 AM
|
Project Approved: 9/15/2022
|
9/7/2022 11:36:07 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/29/2022 12:56:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/24/2022 1:04:52 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/24/2022 1:04:29 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 3 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
8/24/2022 1:03:43 PM
|
Submission Triaged
|
8/24/2022 12:43:38 PM
|
Submission received from Applicant
|
8/16/2022 2:59:53 PM
|
Submission request sent to Applicant
|
8/13/2022 2:06:17 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/10/2022 2:47:21 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/27/2022 10:27:21 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/20/2022 4:11:20 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 3 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
7/20/2022 4:11:19 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 3 Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
7/20/2022 4:11:16 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing No. 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/20/2022 4:09:52 PM
|
Submission Triaged
|
7/20/2022 1:00:51 PM
|
Submission received from Applicant
|
4/19/2022 1:55:45 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/14/2022 11:48:36 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
4/12/2022 12:01:36 PM
|
Project Manager Assigned: Ryan Howser
|
4/5/2022 8:14:34 AM
|
Submission request sent to Applicant
|
4/5/2022 8:14:11 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/5/2022 7:20:43 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
4/4/2022 10:35:42 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/25/2022 7:13:53 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
3/25/2022 7:13:50 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/25/2022 7:09:46 AM
|
Submission Triaged
|
3/23/2022 3:24:44 PM
|
Submission received from Applicant
|
1/19/2022 3:09:25 PM
|
Submission request sent to Applicant
|
1/19/2022 3:08:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/18/2022 3:25:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/12/2022 5:58:30 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/21/2021 12:03:27 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/21/2021 8:36:40 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/21/2021 8:36:37 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
12/21/2021 8:36:27 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/21/2021 8:36:20 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
12/21/2021 8:36:14 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/21/2021 8:32:36 AM
|
Submission Triaged
|
12/16/2021 5:58:36 PM
|
Submission received from Applicant
|
9/30/2021 3:53:47 PM
|
Submission request sent to Applicant
|
9/30/2021 3:52:47 PM
|
Submission Triaged
|
9/30/2021 3:51:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/28/2021 1:37:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/27/2021 2:23:47 PM
|
Submission received from Applicant
|
9/27/2021 8:41:49 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/24/2021 8:02:51 PM
|
Submission request sent to Applicant
|
9/20/2021 1:21:44 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/3/2021 12:02:45 PM
|
Request for Review Comments returned by EPC Parks Department
|
9/1/2021 1:22:12 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/30/2021 11:42:46 AM
|
Request for Review Comments returned by County Attorney - Water
|
8/30/2021 8:38:55 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/30/2021 8:38:51 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/30/2021 8:38:47 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by on behalf of EPC Parks Department
|
8/30/2021 8:38:44 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Edi Anderson on behalf of County Attorney - Water
|
8/30/2021 8:38:42 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
8/30/2021 8:38:40 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
8/30/2021 8:38:34 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/30/2021 8:34:57 AM
|
Submission Triaged
|
8/26/2021 5:39:40 PM
|
Submission received from Applicant
|
7/23/2021 11:30:29 AM
|
Request for Review Comments returned by Parks Advisory Board
|
7/20/2021 5:26:33 PM
|
Submission request sent to Applicant
|
7/20/2021 5:25:44 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/20/2021 5:24:44 PM
|
Request for Review Comments email resent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
7/20/2021 5:21:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/14/2021 10:19:32 AM
|
Request for Review Comments returned by PCD Engineering Division
|
7/7/2021 2:27:24 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/2/2021 9:01:21 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/1/2021 11:49:25 AM
|
Request for Review Comments returned by EPC Parks Department
|
7/1/2021 8:50:11 AM
|
Request for Review Comments returned by Widefield SD 3
|
6/30/2021 2:56:11 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/30/2021 12:28:13 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/29/2021 9:32:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/28/2021 10:08:57 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/25/2021 12:03:39 PM
|
Request for Review Comments email resent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
6/23/2021 8:03:52 AM
|
Request for Review Comments returned by Fountain
|
6/17/2021 1:19:09 PM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
6/17/2021 8:58:03 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
6/15/2021 7:16:26 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
6/15/2021 7:16:21 AM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/14/2021 9:19:10 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
6/11/2021 9:59:48 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
6/11/2021 8:55:09 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
6/9/2021 10:47:29 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/7/2021 1:29:11 PM
|
Request for Review Comments returned by Schriever AFB
|
6/4/2021 2:03:13 PM
|
Request for Review Comments returned by EPC Environmental Services
|
6/4/2021 12:28:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
6/4/2021 12:15:25 PM
|
Request for Review Comments returned by RBD Floodplain
|
6/4/2021 12:08:12 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Brandon Bernard on behalf of Widefield Water & San
|
6/4/2021 12:08:10 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by COO Dave Gish on behalf of Widefield SD 3
|
6/4/2021 12:08:08 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Eric Hemingway on behalf of Waterview Metropolitan Districts 1-2
|
6/4/2021 12:08:06 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
6/4/2021 12:08:04 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by on behalf of Security Fire Protection District
|
6/4/2021 12:08:02 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Darren Horstmeier on behalf of Schriever AFB
|
6/4/2021 12:08:00 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Mr. Michael Shafer on behalf of Peterson AFB
|
6/4/2021 12:07:57 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
6/4/2021 12:07:55 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
6/4/2021 12:07:53 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Kristy Martinez on behalf of Fountain
|
6/4/2021 12:07:50 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
6/4/2021 12:07:48 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/4/2021 12:07:46 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
6/4/2021 12:07:31 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
6/4/2021 12:07:29 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Keith Curtis on behalf of RBD Floodplain
|
6/4/2021 12:07:27 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
6/4/2021 12:07:25 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
6/4/2021 12:07:23 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
6/4/2021 12:07:21 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
6/4/2021 12:07:19 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
6/4/2021 12:07:17 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Justin Osborne on behalf of Colorado State Land Board
|
6/4/2021 12:07:15 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
6/4/2021 12:07:13 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
|
6/4/2021 12:07:08 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/4/2021 12:07:05 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/4/2021 12:07:04 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
6/4/2021 12:06:55 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by on behalf of Parks Advisory Board
|
6/4/2021 12:06:53 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/4/2021 12:06:47 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
6/4/2021 12:06:45 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
6/4/2021 12:06:42 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by on behalf of EPC Parks Department
|
6/4/2021 12:06:40 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
6/4/2021 12:06:30 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
6/4/2021 12:06:28 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Edi Anderson on behalf of County Attorney - Water
|
6/4/2021 12:06:26 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
6/4/2021 12:06:24 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Steve Schleiker on behalf of Assessor's Office
|
6/4/2021 12:06:21 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by John Green on behalf of PCD Project Manager
|
6/4/2021 12:06:19 PM
|
Request for Review Comments email sent for Project Trails at Aspen Ridge Filing 3 Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/1/2021 7:53:37 AM
|
Fees paid: 6/1/2021 (Receipt: 1004482)
|
5/12/2021 5:19:10 PM
|
Payment Request sent: 5/12/2021
|
5/12/2021 5:19:10 PM
|
File # Assigned: SF2122
|
5/12/2021 5:19:01 PM
|
Submission Triaged
|
5/12/2021 4:59:43 PM
|
Submission received from Applicant
|
5/12/2021 6:32:29 AM
|
Submission request sent to Applicant
|
5/12/2021 6:32:13 AM
|
Submission Triaged
|
5/11/2021 8:33:28 PM
|
Submission received from Applicant
|
4/1/2021 8:09:55 AM
|
Submission request sent to Applicant
|
3/25/2021 3:42:26 PM
|
Submission request sent to Applicant
|
3/1/2021 11:02:37 AM
|
Project Manager Assigned: John Green
|
3/1/2021 11:02:36 AM
|
Project Created
|