7/24/2023 4:02:19 PM
|
Project Closed
|
7/24/2023 4:02:19 PM
|
Project Approved: 7/24/2023
|
7/24/2023 3:32:39 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/24/2023 8:41:07 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/3/2023 9:20:28 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
7/3/2023 9:20:25 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/28/2023 5:25:54 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/19/2023 8:40:47 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/5/2023 1:05:50 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/5/2023 9:47:10 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/5/2023 9:47:08 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
6/5/2023 9:47:05 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/5/2023 9:46:23 AM
|
Project reopened for Review Comments
|
6/5/2023 9:46:08 AM
|
Submission Triaged
|
6/5/2023 9:32:57 AM
|
Submission received from Applicant
|
6/5/2023 9:15:40 AM
|
Submission request sent to Applicant
|
5/2/2023 12:54:50 PM
|
Submission request sent to Applicant
|
3/13/2023 7:12:29 AM
|
Submission Triaged
|
3/10/2023 1:11:48 PM
|
Submission received from Applicant
|
3/10/2023 10:15:39 AM
|
Submission request sent to Applicant
|
2/6/2023 12:28:27 PM
|
Submission Triaged
|
2/6/2023 11:43:21 AM
|
Submission received from Applicant
|
2/6/2023 10:42:52 AM
|
Submission request sent to Applicant
|
12/20/2021 10:55:11 AM
|
Project Closed
|
12/20/2021 10:55:11 AM
|
Project Approved: 12/20/2021
|
12/8/2021 10:20:30 AM
|
Submission Triaged
|
12/8/2021 10:08:58 AM
|
Submission received from Applicant
|
12/8/2021 9:13:16 AM
|
Submission request sent to Applicant
|
12/8/2021 7:53:55 AM
|
Submission Triaged
|
12/8/2021 7:36:12 AM
|
Submission received from Applicant
|
12/8/2021 7:28:24 AM
|
Submission request sent to Applicant
|
12/7/2021 10:23:50 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/7/2021 10:18:50 AM
|
Submission Triaged
|
12/7/2021 10:15:35 AM
|
Submission received from Applicant
|
12/7/2021 9:32:17 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/7/2021 9:31:30 AM
|
Submission request sent to Applicant
|
12/7/2021 9:26:13 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/7/2021 9:26:11 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
12/7/2021 9:26:05 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/7/2021 9:24:01 AM
|
Submission request canceled
|
12/7/2021 9:23:38 AM
|
Submission request sent to Applicant
|
12/7/2021 9:22:49 AM
|
Submission Triaged
|
12/7/2021 9:20:24 AM
|
Submission received from Applicant
|
12/7/2021 7:42:27 AM
|
Submission request sent to Applicant
|
12/6/2021 11:37:14 AM
|
Submission request canceled
|
12/6/2021 11:36:45 AM
|
Submission Triaged
|
12/6/2021 11:27:12 AM
|
Project reopened for Review Comments
|
12/6/2021 11:26:14 AM
|
Project Closed
|
12/6/2021 11:26:14 AM
|
Project Approved: 12/6/2021
|
12/6/2021 11:13:05 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/6/2021 8:19:18 AM
|
Project reopened for Approval requests
|
12/6/2021 8:14:55 AM
|
Submission request sent to Applicant
|
12/6/2021 8:11:21 AM
|
Project Closed
|
12/6/2021 8:11:21 AM
|
Project Approved: 12/6/2021
|
12/3/2021 8:40:15 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/3/2021 1:47:55 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
12/2/2021 3:53:53 PM
|
Request for Review Comments sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elena Krebs on behalf of PCD Administrative Notice
|
12/1/2021 9:45:47 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/22/2021 10:47:44 AM
|
Request for Review Comments returned by Widefield SD 3
|
11/18/2021 12:04:10 PM
|
Request for Review Comments returned by Fountain
|
11/17/2021 2:14:44 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/17/2021 8:18:17 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/16/2021 12:28:33 PM
|
Project reopened for Review Comments
|
11/16/2021 12:27:24 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Brandon Bernard on behalf of Widefield Water & San
|
11/16/2021 12:27:21 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Dennis Neal on behalf of Widefield SD 3
|
11/16/2021 12:27:19 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Security Fire Protection District
|
11/16/2021 12:27:17 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by William Feller on behalf of Peaceful Valley Lake Estates HOA
|
11/16/2021 12:27:09 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
11/16/2021 12:27:07 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
11/16/2021 12:27:05 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Jeff Mark on behalf of Lorson Ranch Metro
|
11/16/2021 12:27:03 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kristy Martinez on behalf of Fountain
|
11/16/2021 12:27:00 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/16/2021 12:26:53 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
11/16/2021 12:26:51 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/16/2021 12:26:48 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/16/2021 12:26:44 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/16/2021 12:26:38 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/16/2021 12:26:36 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Michael Diehl on behalf of Xcel Energy
|
11/16/2021 12:26:34 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Parks Advisory Board
|
11/16/2021 12:26:30 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/16/2021 12:26:26 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
11/16/2021 12:26:23 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of EPC Parks Department
|
11/16/2021 12:26:19 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
11/16/2021 12:26:13 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/16/2021 12:26:11 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
11/16/2021 12:26:09 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
11/16/2021 12:26:05 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/16/2021 12:20:49 PM
|
Submission Triaged
|
11/16/2021 12:17:49 PM
|
Submission received from Applicant
|
11/1/2021 4:56:04 PM
|
Submission request sent to Applicant
|
10/11/2021 10:39:05 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
9/14/2021 9:51:11 AM
|
Submission request sent to Applicant
|
9/13/2021 4:48:33 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/2/2021 1:15:21 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/26/2021 12:44:19 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/26/2021 11:22:38 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/26/2021 11:11:33 AM
|
Submission Triaged
|
8/25/2021 2:42:57 PM
|
Submission received from Applicant
|
8/25/2021 1:54:21 PM
|
Submission request sent to Applicant
|
8/25/2021 1:53:02 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/25/2021 1:53:00 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
8/25/2021 1:52:56 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/25/2021 1:51:38 PM
|
Submission Triaged
|
8/25/2021 1:46:19 PM
|
Submission received from Applicant
|
8/24/2021 5:10:45 PM
|
Submission request sent to Applicant
|
8/24/2021 9:10:41 AM
|
Submission request sent to Applicant
|
8/22/2021 6:00:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/19/2021 8:31:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/26/2021 9:46:08 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/22/2021 12:11:25 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
7/22/2021 12:11:23 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
7/22/2021 12:11:18 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/22/2021 12:08:03 PM
|
Submission Triaged
|
7/22/2021 8:46:27 AM
|
Submission received from Applicant
|
7/20/2021 8:25:27 AM
|
Submission request sent to Applicant
|
7/15/2021 7:40:59 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/14/2021 4:14:21 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/12/2021 11:10:08 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/12/2021 2:26:38 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/9/2021 8:29:19 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/7/2021 11:46:34 AM
|
Request for Review Comments returned by Parks Advisory Board
|
7/7/2021 11:45:39 AM
|
Request for Review Comments returned by EPC Parks Department
|
7/1/2021 10:32:56 AM
|
Request for Review Comments returned by Widefield SD 3
|
6/30/2021 9:21:50 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/25/2021 12:43:42 PM
|
Request for Review Comments returned by EPC Environmental Services
|
6/23/2021 8:10:52 AM
|
Request for Review Comments returned by Fountain
|
6/22/2021 6:36:57 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
6/21/2021 2:55:33 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Brandon Bernard on behalf of Widefield Water & San
|
6/21/2021 2:55:31 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Dennis Neal on behalf of Widefield SD 3
|
6/21/2021 2:55:29 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Security Fire Protection District
|
6/21/2021 2:55:27 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by William Feller on behalf of Peaceful Valley Lake Estates HOA
|
6/21/2021 2:55:19 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
6/21/2021 2:55:17 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
6/21/2021 2:55:15 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Jeff Mark on behalf of Lorson Ranch Metro
|
6/21/2021 2:55:12 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kristy Martinez on behalf of Fountain
|
6/21/2021 2:55:10 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
6/21/2021 2:55:07 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
6/21/2021 2:55:03 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
6/21/2021 2:55:01 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Michael Diehl on behalf of Xcel Energy
|
6/21/2021 2:54:59 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Parks Advisory Board
|
6/21/2021 2:54:55 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/21/2021 2:54:51 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
6/21/2021 2:54:49 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of EPC Parks Department
|
6/21/2021 2:54:43 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
6/21/2021 2:54:37 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
6/21/2021 2:54:35 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/21/2021 2:54:33 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
6/21/2021 2:54:29 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/21/2021 2:51:45 PM
|
Submission Triaged
|
6/17/2021 9:56:40 AM
|
Submission received from Applicant
|
6/10/2021 8:36:00 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/10/2021 8:31:20 AM
|
Submission request sent to Applicant
|
6/10/2021 8:30:19 AM
|
Submission request sent to Applicant
|
6/2/2021 2:43:02 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
6/2/2021 2:42:58 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/2/2021 1:46:06 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
6/2/2021 1:46:01 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/2/2021 8:40:20 AM
|
Submission Triaged
|
6/2/2021 7:27:33 AM
|
Submission received from Applicant
|
5/31/2021 7:05:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/27/2021 5:50:01 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/25/2021 4:45:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/25/2021 4:43:19 PM
|
Request for Review Comments email resent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
5/25/2021 2:22:34 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/25/2021 12:48:31 PM
|
Submission request sent to Applicant
|
5/24/2021 9:10:48 AM
|
Submission Triaged
|
5/24/2021 8:31:34 AM
|
Submission received from Applicant
|
5/18/2021 9:10:37 AM
|
Submission request sent to Applicant
|
5/18/2021 9:10:11 AM
|
Submission request sent to Applicant
|
5/17/2021 9:07:27 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/23/2021 3:02:53 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
4/23/2021 3:02:49 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
4/23/2021 3:02:47 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
4/23/2021 3:02:43 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/23/2021 1:31:29 PM
|
Submission Triaged
|
4/23/2021 1:18:10 PM
|
Submission received from Applicant
|
4/23/2021 12:44:57 PM
|
Submission request sent to Applicant
|
4/23/2021 11:27:23 AM
|
Submission request sent to Applicant
|
4/2/2021 7:03:30 AM
|
Submission request sent to Applicant
|
3/5/2021 1:12:55 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/4/2021 5:43:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/23/2021 1:45:53 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/23/2021 10:24:40 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/17/2021 8:33:30 AM
|
Request for Review Comments returned by Parks Advisory Board
|
2/16/2021 5:11:52 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/16/2021 2:16:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/16/2021 9:00:26 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/2/2021 1:18:03 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
2/2/2021 8:47:17 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
2/2/2021 8:42:53 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/29/2021 9:36:06 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/26/2021 2:52:54 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/26/2021 12:09:55 PM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/26/2021 7:43:02 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Brandon Bernard on behalf of Widefield Water & San
|
1/26/2021 7:43:00 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Dennis Neal on behalf of Widefield SD 3
|
1/26/2021 7:42:58 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Security Fire Protection District
|
1/26/2021 7:42:56 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by William Feller on behalf of Peaceful Valley Lake Estates HOA
|
1/26/2021 7:42:54 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
1/26/2021 7:42:52 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
1/26/2021 7:42:50 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Jeff Mark on behalf of Lorson Ranch Metro
|
1/26/2021 7:42:48 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kristy Martinez on behalf of Fountain
|
1/26/2021 7:42:46 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
1/26/2021 7:42:44 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
1/26/2021 7:42:42 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
1/26/2021 7:42:39 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
1/26/2021 7:42:37 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/26/2021 7:42:35 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/26/2021 7:42:33 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Michael Diehl on behalf of Xcel Energy
|
1/26/2021 7:42:31 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of Parks Advisory Board
|
1/26/2021 7:42:29 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/26/2021 7:42:23 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
1/26/2021 7:42:20 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by on behalf of EPC Parks Department
|
1/26/2021 7:42:18 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
1/26/2021 7:42:10 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/26/2021 7:42:08 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
1/26/2021 7:42:06 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
1/26/2021 7:42:04 AM
|
Request for Review Comments email sent for Project Hills at Lorson Ranch Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/25/2021 10:16:01 AM
|
Fees paid: 1/25/2021 (Receipt: 1003825)
|
1/22/2021 9:59:12 AM
|
Payment Request sent: 1/22/2021
|
1/22/2021 9:59:12 AM
|
File # Assigned: SF2110
|
1/22/2021 9:59:06 AM
|
Submission Triaged
|
1/22/2021 9:49:02 AM
|
Submission received from Applicant
|
1/14/2021 2:52:31 PM
|
Submission request sent to Applicant
|
1/14/2021 2:37:12 PM
|
Project Manager Assigned: Kari Parsons
|
1/14/2021 2:37:12 PM
|
EA Assigned: EA19238
|
1/14/2021 2:37:12 PM
|
Project Created
|