8/3/2023 1:32:24 PM
|
Project Closed
|
8/3/2023 1:32:24 PM
|
Project Approved: 8/3/2023
|
12/9/2022 2:23:37 PM
|
Project Manager Assigned: Planning Manager Justin Kilgore
|
12/6/2022 4:46:55 PM
|
Project reopened for Review Comments
|
11/29/2022 4:30:20 PM
|
Project Closed
|
11/29/2022 4:30:20 PM
|
Project Approved: 11/29/2022
|
11/29/2022 3:46:37 PM
|
Project reopened for Review Comments
|
9/1/2021 11:08:20 AM
|
Project Closed
|
9/1/2021 11:08:20 AM
|
Project Approved: 9/1/2021
|
8/10/2021 7:10:44 AM
|
Request for Review Comments returned by PCD Engineering Division
|
8/5/2021 7:21:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/5/2021 6:56:17 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/3/2021 10:09:18 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/3/2021 10:09:14 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
8/3/2021 10:09:10 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/3/2021 10:07:44 AM
|
Submission Triaged
|
7/23/2021 5:36:00 PM
|
Submission received from Applicant
|
7/23/2021 8:12:38 AM
|
Submission request sent to Applicant
|
7/15/2021 12:18:15 PM
|
Submission request sent to Applicant
|
6/23/2021 7:27:10 AM
|
Submission request sent to Applicant
|
6/22/2021 4:21:52 PM
|
Submission Triaged
|
6/21/2021 3:19:01 PM
|
Submission received from Applicant
|
6/21/2021 12:37:52 PM
|
Submission request sent to Applicant
|
6/18/2021 3:04:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/4/2021 11:32:00 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Edi Anderson on behalf of County Attorney - Water
|
6/4/2021 11:31:58 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
6/4/2021 11:29:18 AM
|
Submission Triaged
|
6/4/2021 10:12:40 AM
|
Submission received from Applicant
|
6/3/2021 5:08:02 PM
|
Submission request sent to Applicant
|
5/10/2021 4:01:26 PM
|
Submission Triaged
|
5/7/2021 7:34:55 AM
|
Submission received from Applicant
|
5/7/2021 7:26:24 AM
|
Submission request sent to Applicant
|
5/5/2021 9:59:30 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/4/2021 5:28:04 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/4/2021 10:24:05 AM
|
Request for Review Comments returned by County Attorney - Water
|
5/3/2021 2:50:22 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Edi Anderson on behalf of County Attorney - Water
|
5/3/2021 2:50:20 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
4/28/2021 4:41:04 PM
|
Submission request sent to Applicant
|
4/27/2021 2:25:35 PM
|
Submission Triaged
|
4/26/2021 11:51:11 AM
|
Request for Review Comments returned by County Attorney - Water
|
4/23/2021 6:07:20 AM
|
Submission received from Applicant
|
4/22/2021 10:10:01 AM
|
Submission request sent to Applicant
|
4/22/2021 8:13:56 AM
|
Submission request sent to Applicant
|
4/21/2021 9:52:34 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/19/2021 7:53:00 PM
|
Request for Review Comments returned by EPC Health Department
|
4/16/2021 10:09:02 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/15/2021 8:19:08 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Edi Anderson on behalf of County Attorney - Water
|
4/14/2021 2:55:02 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
4/14/2021 2:55:00 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
4/14/2021 2:54:56 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/24/2021 3:00:21 PM
|
Submission Triaged
|
3/23/2021 7:58:21 AM
|
Submission received from Applicant
|
3/22/2021 12:10:36 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/15/2021 10:41:06 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/12/2021 1:04:46 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/10/2021 3:23:45 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/10/2021 3:22:56 PM
|
Submission request sent to Applicant
|
3/10/2021 3:21:34 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/10/2021 3:18:21 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/10/2021 3:18:19 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Catherine McGarvy on behalf of EPC Health Department
|
3/10/2021 3:18:11 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Edi Anderson on behalf of County Attorney - Water
|
3/9/2021 9:48:07 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/3/2021 12:04:32 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/2/2021 1:38:55 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/18/2021 9:33:03 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/17/2021 12:59:49 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
2/17/2021 12:59:47 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/17/2021 12:59:41 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by on behalf of EPC Parks Department
|
2/17/2021 12:59:39 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/17/2021 12:59:37 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
2/17/2021 12:59:35 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
2/17/2021 12:59:31 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/17/2021 12:57:44 PM
|
Submission Triaged
|
2/17/2021 8:31:57 AM
|
Request for Review Comments returned by Parks Advisory Board
|
2/11/2021 6:45:43 PM
|
Submission received from Applicant
|
2/8/2021 11:07:57 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/2/2021 9:36:43 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/26/2021 10:37:46 AM
|
Submission request sent to Applicant
|
1/26/2021 10:29:49 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/22/2021 11:54:18 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/21/2021 6:42:39 PM
|
Request for Review Comments email resent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
1/21/2021 6:36:26 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/21/2021 6:27:08 PM
|
Request for Review Comments email resent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
1/19/2021 4:33:45 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/15/2021 3:17:11 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
1/14/2021 5:42:15 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/14/2021 11:57:18 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
1/13/2021 9:55:34 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/12/2021 1:44:08 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/7/2021 9:20:28 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/4/2021 1:12:44 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/29/2020 4:01:43 PM
|
Submission Triaged
|
12/28/2020 11:14:22 AM
|
Request for Review Comments returned by Lewis Palmer 38
|
12/25/2020 12:52:08 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/23/2020 12:57:13 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/23/2020 12:03:27 PM
|
Submission received from Applicant
|
12/23/2020 6:37:46 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/22/2020 1:42:22 PM
|
Submission request sent to Applicant
|
12/22/2020 12:50:13 PM
|
Request for Review Comments returned by RBD Floodplain
|
12/22/2020 11:30:55 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/22/2020 11:30:52 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
12/22/2020 11:30:50 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Keith Curtis on behalf of RBD Floodplain
|
12/22/2020 11:30:48 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/22/2020 11:30:44 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/22/2020 11:30:41 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
12/22/2020 11:30:37 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/22/2020 11:30:33 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
12/22/2020 11:30:25 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
12/22/2020 11:30:23 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Vicki Wood on behalf of Lewis Palmer 38
|
12/22/2020 11:30:19 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by on behalf of Parks Advisory Board
|
12/22/2020 11:30:15 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/22/2020 11:30:11 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by on behalf of EPC Parks Department
|
12/22/2020 11:30:09 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/22/2020 11:30:07 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
12/22/2020 11:30:05 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
12/22/2020 11:30:01 AM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/22/2020 11:25:21 AM
|
Submission Triaged
|
12/18/2020 2:46:13 PM
|
Submission received from Applicant
|
12/17/2020 5:10:45 PM
|
Submission request sent to Applicant
|
12/10/2020 1:38:15 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
12/1/2020 10:12:18 AM
|
Submission request sent to Applicant
|
12/1/2020 10:09:33 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/1/2020 9:51:06 AM
|
Request for Review Comments email resent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
11/30/2020 8:12:21 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/25/2020 8:08:43 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/23/2020 4:04:27 PM
|
Request for Review Comments returned by Parks Advisory Board
|
11/23/2020 4:03:13 PM
|
Request for Review Comments returned by EPC Parks Department
|
11/19/2020 9:27:21 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
11/18/2020 11:05:41 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/18/2020 11:28:25 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/18/2020 9:01:30 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
11/18/2020 8:43:11 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/16/2020 10:06:21 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/11/2020 5:03:08 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/9/2020 10:15:40 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
11/4/2020 4:02:13 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/3/2020 4:17:52 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
10/30/2020 12:09:03 PM
|
Request for Review Comments returned by EPC Environmental Services
|
10/29/2020 4:30:08 PM
|
Request for Review Comments returned by RBD Floodplain
|
10/29/2020 4:27:11 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/29/2020 4:27:08 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Administrative Assistant Cathy Hansen-Lee on behalf of Mountain View Electric Association, Inc.
|
10/29/2020 4:27:06 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Debbie Flynn on behalf of Monument
|
10/29/2020 4:27:04 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
10/29/2020 4:27:00 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Keith Curtis on behalf of RBD Floodplain
|
10/29/2020 4:26:58 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/29/2020 4:26:54 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/29/2020 4:26:50 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
10/29/2020 4:26:47 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
10/29/2020 4:26:44 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
10/29/2020 4:26:36 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
10/29/2020 4:26:34 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Vicki Wood on behalf of Lewis Palmer 38
|
10/29/2020 4:26:32 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by on behalf of Parks Advisory Board
|
10/29/2020 4:26:30 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/29/2020 4:26:24 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
10/29/2020 4:26:22 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
10/29/2020 4:26:20 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by on behalf of EPC Parks Department
|
10/29/2020 4:26:17 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/29/2020 4:26:15 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Lori Seago on behalf of County Attorney - Development Review
|
10/29/2020 4:26:13 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by John Green on behalf of PCD Project Manager
|
10/29/2020 4:26:11 PM
|
Request for Review Comments email sent for Project Grandwood Ranch Final for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/29/2020 4:00:19 PM
|
Fees paid: 10/29/2020 (Receipt: 1003489)
|
10/23/2020 8:16:07 AM
|
Payment Request sent: 10/23/2020
|
10/23/2020 8:16:07 AM
|
File # Assigned: SF2026
|
10/23/2020 8:15:59 AM
|
Submission Triaged
|
10/22/2020 5:27:32 PM
|
Submission received from Applicant
|
10/22/2020 5:04:24 PM
|
Submission request sent to Applicant
|
10/5/2020 5:12:10 PM
|
Submission request sent to Applicant
|
10/5/2020 5:12:00 PM
|
Submission Triaged
|
10/2/2020 4:03:17 PM
|
Submission received from Applicant
|
9/15/2020 8:16:54 AM
|
Submission request sent to Applicant
|
9/14/2020 4:49:37 PM
|
Project Manager Assigned: John Green
|
9/14/2020 4:49:37 PM
|
Project Created
|