2/10/2023 8:19:51 AM
|
Project Closed
|
2/10/2023 8:19:50 AM
|
Project Approved: 2/10/2023
|
2/10/2023 8:19:42 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
10/4/2022 3:38:47 PM
|
Submission Triaged
|
10/4/2022 3:29:07 PM
|
Submission received from Applicant
|
10/4/2022 1:06:25 PM
|
Submission request sent to Applicant
|
10/4/2022 1:04:42 PM
|
Project Manager Assigned: Ryan Howser
|
9/9/2021 9:02:26 AM
|
Submission request sent to Applicant
|
5/20/2021 12:19:59 PM
|
Submission request canceled
|
2/8/2021 11:23:22 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/4/2021 5:31:25 PM
|
Submission request sent to Applicant
|
2/4/2021 5:29:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/4/2021 2:46:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/2/2021 11:21:42 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/28/2021 11:45:47 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/27/2021 8:29:28 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/20/2021 9:18:40 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/14/2021 11:52:11 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/14/2021 11:52:09 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
1/14/2021 11:52:07 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/14/2021 11:52:03 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/14/2021 11:52:01 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Lori Seago on behalf of County Attorney - Development Review
|
1/14/2021 11:51:58 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
1/14/2021 11:51:53 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/12/2021 8:34:54 AM
|
Submission Triaged
|
1/10/2021 10:42:44 AM
|
Request for Review Comments returned by EPC Health Department
|
1/6/2021 4:20:30 PM
|
Submission received from Applicant
|
12/23/2020 11:10:08 AM
|
Submission request sent to Applicant
|
12/23/2020 10:54:19 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
12/23/2020 10:50:16 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/23/2020 10:36:13 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
12/21/2020 11:58:49 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/18/2020 12:56:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/17/2020 5:35:41 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/15/2020 2:49:05 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/15/2020 9:23:32 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/15/2020 9:03:12 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
12/14/2020 5:50:07 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/14/2020 12:26:12 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
12/12/2020 9:15:49 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/7/2020 8:25:40 AM
|
Request for Review Comments returned by Parks Advisory Board
|
12/7/2020 8:24:03 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/7/2020 8:00:14 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/3/2020 2:25:15 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/3/2020 2:25:13 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
12/3/2020 2:25:08 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/2/2020 3:30:44 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/2/2020 1:15:37 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/2/2020 8:02:04 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/1/2020 2:23:56 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
12/1/2020 10:16:32 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
12/1/2020 9:00:07 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Paul Pirog on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
12/1/2020 9:00:05 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
12/1/2020 9:00:03 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
12/1/2020 9:00:00 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
12/1/2020 8:59:56 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/1/2020 8:59:54 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/1/2020 8:59:52 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/1/2020 8:59:49 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
12/1/2020 8:59:45 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/1/2020 8:59:42 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of Parks Advisory Board
|
12/1/2020 8:59:38 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/1/2020 8:59:36 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of EPC Parks Department
|
12/1/2020 8:59:33 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Catherine McGarvy on behalf of EPC Health Department
|
12/1/2020 8:59:26 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/1/2020 8:59:24 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Edi Anderson on behalf of County Attorney - Water
|
12/1/2020 8:59:22 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/1/2020 8:59:20 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
12/1/2020 8:59:16 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/1/2020 8:54:45 AM
|
Submission Triaged
|
11/20/2020 9:39:34 AM
|
Request for Review Comments returned by EPC Environmental Services
|
11/19/2020 2:52:46 PM
|
Request for Review Comments email resent for Project Rolling Hills Ranch Filing #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/19/2020 11:28:34 AM
|
Submission received from Applicant
|
11/15/2020 12:50:12 PM
|
Request for Review Comments returned by EPC Health Department
|
11/15/2020 12:47:46 PM
|
Request for Review Comments returned by EPC Health Department
|
11/4/2020 2:36:10 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/4/2020 2:35:17 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/3/2020 1:19:51 PM
|
Submission request sent to Applicant
|
10/26/2020 2:58:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/26/2020 2:55:05 PM
|
Request for Review Comments email resent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
10/26/2020 11:48:57 AM
|
Submission request sent to Applicant
|
10/26/2020 11:47:10 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/26/2020 10:27:57 AM
|
Request for Review Comments returned by PCD Engineering Division
|
10/26/2020 9:01:24 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/26/2020 8:59:49 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/21/2020 9:52:57 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/21/2020 9:52:03 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/14/2020 1:44:45 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/14/2020 1:44:26 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/14/2020 6:07:40 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
10/13/2020 2:39:17 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/13/2020 2:31:03 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/12/2020 2:07:07 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/12/2020 2:06:25 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/9/2020 11:53:43 AM
|
Request for Review Comments returned by EPC Parks Department
|
10/9/2020 11:53:06 AM
|
Request for Review Comments returned by EPC Parks Department
|
10/6/2020 10:07:20 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/6/2020 10:02:07 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/5/2020 8:33:27 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/5/2020 8:32:07 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/1/2020 1:37:21 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
9/29/2020 12:11:13 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
9/29/2020 12:10:02 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
9/29/2020 10:01:51 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
9/29/2020 8:36:33 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
9/29/2020 8:23:51 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
9/28/2020 10:40:30 AM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/24/2020 2:08:22 PM
|
Request for Review Comments returned by EPC Environmental Services
|
9/24/2020 2:05:23 PM
|
Request for Review Comments returned by EPC Environmental Services
|
9/23/2020 2:59:52 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/23/2020 2:59:04 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/23/2020 9:12:23 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/23/2020 9:11:28 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/22/2020 1:59:27 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
9/22/2020 1:59:25 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
9/22/2020 1:59:22 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
9/22/2020 1:59:20 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Melissa Andrews on behalf of Falcon School District 49
|
9/22/2020 1:59:18 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
9/22/2020 1:59:16 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
9/22/2020 1:59:14 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Autumn Mason on behalf of Woodmen Road Metro
|
9/22/2020 1:59:11 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
9/22/2020 1:59:11 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
9/22/2020 1:59:09 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
9/22/2020 1:59:09 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
9/22/2020 1:59:07 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
9/22/2020 1:59:07 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
9/22/2020 1:59:05 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/22/2020 1:59:05 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Melissa Andrews on behalf of Falcon School District 49
|
9/22/2020 1:59:03 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
9/22/2020 1:59:03 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/22/2020 1:59:01 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
9/22/2020 1:59:00 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
9/22/2020 1:58:59 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
9/22/2020 1:58:56 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
9/22/2020 1:58:56 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/22/2020 1:58:54 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
9/22/2020 1:58:54 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of Parks Advisory Board
|
9/22/2020 1:58:52 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
9/22/2020 1:58:52 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/22/2020 1:58:50 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/22/2020 1:58:48 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
9/22/2020 1:58:48 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/22/2020 1:58:45 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
9/22/2020 1:58:44 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
9/22/2020 1:58:41 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of EPC Parks Department
|
9/22/2020 1:58:40 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
9/22/2020 1:58:38 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Catherine McGarvy on behalf of EPC Health Department
|
9/22/2020 1:58:37 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/22/2020 1:58:35 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of Parks Advisory Board
|
9/22/2020 1:58:33 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/22/2020 1:58:29 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/22/2020 1:58:28 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
9/22/2020 1:58:27 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Edi Anderson on behalf of County Attorney - Water
|
9/22/2020 1:58:26 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
9/22/2020 1:58:25 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/22/2020 1:58:24 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by on behalf of EPC Parks Department
|
9/22/2020 1:58:23 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
9/22/2020 1:58:22 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Catherine McGarvy on behalf of EPC Health Department
|
9/22/2020 1:58:14 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/22/2020 1:58:12 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Edi Anderson on behalf of County Attorney - Water
|
9/22/2020 1:58:10 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/22/2020 1:58:07 PM
|
Request for Review Comments email sent for Project Rolling Hills Ranch Filing #2 for review by John Green on behalf of PCD Project Manager
|
9/22/2020 1:34:58 PM
|
Fees paid: 9/22/2020 (Receipt: 1003280)
|
9/10/2020 5:00:04 AM
|
Project Manager Assigned: John Green
|
9/10/2020 4:59:46 AM
|
Payment Request sent: 9/10/2020
|
9/10/2020 4:59:46 AM
|
File # Assigned: SF2020
|
9/10/2020 4:59:44 AM
|
Submission Triaged
|
9/9/2020 6:53:41 AM
|
Submission received from Applicant
|
9/2/2020 5:30:06 AM
|
Project Manager Assigned: Ryan Howser
|
9/2/2020 5:28:53 AM
|
Submission request sent to Applicant
|
9/2/2020 5:27:16 AM
|
Submission Triaged
|
9/1/2020 7:39:30 AM
|
Submission received from Applicant
|
5/21/2020 2:00:01 PM
|
Submission request sent to Applicant
|
5/21/2020 1:57:25 PM
|
Project Manager Assigned: Gabe Sevigny
|
5/21/2020 1:57:25 PM
|
Project Created
|