Project Details

Search


File Number
WSEO201
Project Name
Front Range Midway Solar Amendment WSE-O
Description
A requested amendment to an approved WSEO to develop a Solar energy Facility adjacent to two(2) existing sub-stations, utilizing existing transmission lines.
Parcels
5717007004 5717007004 5717007005 5717007005 5717007006 5717007006 5717007019 5717007019 5717007047 5717007047 5717007052 5717007052 5717008024 5717008024 5720000003 5720000003 5720000009 5720000009 5720000010 5720000010 5720007004 5720007004 5721001008 5721001008 5721001010 5721001010 5721001015 5721001015 5721001019 5721001019 5722001002 5722001002
Applicant
Core Consultants Inc.
Jennifer Kraus ( kraus@corecivil.com )
(720) 724-3531
Jennifer Kraus ( kraus@corecivil.com )
(720) 724-3531
EA Number
17-46
File Prefix
WSEO - Wind and/or Solar Energy Generation Plan Overlay
Year
2020
Project Manager
Kari Parsons
Status
Closed
Created
5/20/2020 9:55:04 AM

View: Review Comments



Additional Documents (16)

Link Document Comment
View Hearing Notice
View BOCC Resolution 20-384
View Email and 2023 Update report Dave Iadarola 1/21/2023
View Recorded WSE-O
View Public Printing and Affidavit From El Paso County Advertiser and News
View PC Resolution
View BoCC Approval Letter
View PC Approval Letter
View Letter of support Support letter from Hanover School Dist.
View Neighbor Notification Returned mail
View Letter of Support
View Letter of Support
View PC Staff Report page 1 Typo Corrected for PC date
View PC Staff Report
View Photo
View Photo


Review Documents (52)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 8/20/2020 11:33:01 AM
View Application/Petition Form 9/21/2020 7:45:47 PM
View Authority to Represent 6/18/2020 3:04:21 PM
View Legal Description (MS WORD Version required) 9/24/2020 2:11:53 PM
View Letter of Intent 9/21/2020 7:45:48 PM
View Title Commitment (Current within 30 days of submittal) 6/18/2020 3:07:57 PM
View Additional Exhibits 6/18/2020 3:04:00 PM
View Applicant Comment Response Letter 8/21/2020 4:52:25 PM
View Clearance Letter - Colorado Parks and Wildlife 6/18/2020 3:33:57 PM
View Clearance Letter - USF&W 6/18/2020 3:33:56 PM
View Determination of No Hazard from FAA 6/18/2020 3:33:57 PM
View Easement(s) 6/18/2020 3:15:48 PM
View Electromagnetic Interference Report 6/18/2020 3:33:56 PM
View Floodplain Development Permit 6/18/2020 3:33:54 PM
View Interconnect Agreement 6/18/2020 3:21:21 PM
View Lease Agreement 6/18/2020 3:21:19 PM
View Mineral Rights Certification 6/18/2020 3:33:52 PM
View Photo Simulations 8/21/2020 4:52:25 PM
View Power Purchase Agreement 6/18/2020 3:21:21 PM
View Proof of Liability Insurance 6/18/2020 3:33:55 PM
View State Air Quality Permit 6/18/2020 3:33:55 PM
View Tower/Structure Removal Agreement 6/18/2020 3:21:18 PM
View US Army Corps of Engineer's Permit 6/18/2020 3:33:55 PM
View WSEO Overlay Map 9/24/2020 2:11:54 PM
View Haul Route Plan 6/18/2020 3:33:58 PM
View Lighting Plan 6/18/2020 3:07:54 PM
View Operations Plan 6/18/2020 3:21:21 PM
View Site Map (Proposed Use) 8/21/2020 4:52:24 PM
View Road condition survey 6/18/2020 3:33:58 PM
View Wildlife Report 8/20/2020 11:33:05 AM
View Drainage Report - Final 9/22/2020 8:03:23 AM
View Noxious Weed Management Plan 6/18/2020 3:07:57 PM
View Soils & Geology Report 6/18/2020 3:04:27 PM
View Traffic Impact Study 8/20/2020 11:33:03 AM
View Wildland Fire & Hazard Mitigation Plan 6/18/2020 3:15:44 PM
View Maintenance Plan (MS Word version required) 6/18/2020 3:07:55 PM
View Applicant Response Letter 6/18/2020 3:40:39 PM
View Application Form and Affected Boundaries Map 6/18/2020 3:40:37 PM
View Authority to Represent No. 2 9/29/2020 5:35:24 PM
View Fire Commitment Letter 8/20/2020 11:33:10 AM
View Letter of Support 8/21/2020 4:52:31 PM
View Mineral Right Notice Documentation 6/18/2020 3:40:39 PM
View Noise Study 6/18/2020 3:07:56 PM
View Phasing Plan 6/18/2020 3:07:57 PM
View Physical Constraints Map 8/20/2020 11:33:10 AM
View Powell Homes Authorization 9/24/2020 2:33:35 PM
View Site Plan with Easements 8/21/2020 4:52:28 PM
View Title Commitment and Key 6/18/2020 3:40:36 PM
View Visual Impact Analysis 8/21/2020 4:52:22 PM
View Waiver Requests PPA and Development Impact Mitigation 9/16/2020 12:08:28 PM
View Water Company Commitment Letter 8/20/2020 11:33:11 AM
View Wetlands, Waterbodies, and TES Report with Updated CPW Correspondence 8/20/2020 11:33:12 AM



Events (154)

Date Comment
10/30/2020 7:08:15 AM Project Closed
10/30/2020 7:08:15 AM Project Approved: 10/30/2020
10/30/2020 7:07:35 AM Project Ready for Approval requests. Review Comment period is complete.
10/8/2020 3:52:52 PM Request for Review Comments returned by PCD Engineering Division
9/30/2020 7:07:34 AM Submission Triaged
9/29/2020 5:35:31 PM Submission received from Applicant
9/29/2020 5:30:25 PM Submission request sent to Applicant
9/24/2020 2:36:22 PM Submission Triaged
9/24/2020 2:33:51 PM Submission received from Applicant
9/24/2020 2:30:54 PM Submission request sent to Applicant
9/24/2020 2:28:40 PM Submission Triaged
9/24/2020 2:14:00 PM Submission received from Applicant
9/23/2020 3:37:46 PM Submission request sent to Applicant
9/23/2020 9:05:28 AM Request for Review Comments returned by PCD Project Manager
9/23/2020 7:57:38 AM Request for Review Comments email resent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
9/23/2020 7:56:00 AM Request for Review Comments returned by PCD Project Manager
9/23/2020 7:48:42 AM Submission request sent to Applicant
9/23/2020 7:45:25 AM Submission request sent to Applicant
9/22/2020 9:11:37 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
9/22/2020 9:11:33 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/22/2020 9:08:29 AM Submission Triaged
9/22/2020 8:06:33 AM Submission received from Applicant
9/18/2020 2:25:31 PM Request for Review Comments returned by Fountain
9/18/2020 1:50:29 PM Submission request sent to Applicant
9/18/2020 1:48:33 PM Request for Review Comments returned by PCD Project Manager
9/18/2020 1:16:16 PM Request for Review Comments email resent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
9/18/2020 9:25:52 AM Submission request sent to Applicant
9/18/2020 9:24:51 AM Request for Review Comments returned by PCD Project Manager
9/17/2020 10:24:11 AM Submission request sent to Applicant
9/16/2020 10:17:42 PM Request for Review Comments returned by PCD Engineering Division
9/16/2020 12:10:26 PM Submission Triaged
9/16/2020 12:08:36 PM Submission received from Applicant
9/16/2020 12:00:55 PM Submission request sent to Applicant
8/26/2020 9:29:39 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kristy Martinez on behalf of Fountain
8/26/2020 9:29:38 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
8/26/2020 9:29:36 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/21/2020 5:14:40 PM Submission Triaged
8/21/2020 4:57:18 PM Submission received from Applicant
8/20/2020 12:22:05 PM Submission request sent to Applicant
8/4/2020 12:33:55 PM Request for Review Comments returned by Fountain
7/29/2020 11:23:45 AM Submission request sent to Applicant
7/29/2020 11:20:24 AM Request for Review Comments returned by PCD Project Manager
7/29/2020 11:17:12 AM Request for Review Comments email resent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
7/28/2020 5:16:22 PM Submission request sent to Applicant
7/28/2020 4:52:02 PM Request for Review Comments returned by PCD Project Manager
7/28/2020 1:44:14 PM Request for Review Comments returned by PCD Engineering Division
7/28/2020 12:31:26 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/23/2020 10:06:56 AM Request for Review Comments returned by CIG Colorado Interstate Gas
7/20/2020 9:12:41 AM Request for Review Comments returned by El Paso County Conservation Dist
7/20/2020 9:12:22 AM Request for Review Comments returned by El Paso County Conservation Dist
7/20/2020 7:56:30 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/16/2020 4:45:55 PM Request for Review Comments returned by Hanover Fire Protection District
7/16/2020 3:27:51 PM Request for Review Comments returned by EPC Parks Department
7/16/2020 3:25:50 PM Request for Review Comments returned by Parks Advisory Board
7/16/2020 10:25:44 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/16/2020 8:50:33 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
7/14/2020 3:39:48 PM Request for Review Comments returned by Intermountain Rural Electric Association
7/13/2020 1:45:51 PM Request for Review Comments returned by EPC Stormwater Review
7/8/2020 8:53:04 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
6/30/2020 9:09:24 AM Request for Review Comments returned by EPC Environmental Services
6/26/2020 12:55:20 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
6/25/2020 9:22:48 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Gary Smith on behalf of Wigwam Mutual Water Co
6/25/2020 9:22:47 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
6/25/2020 9:22:46 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
6/25/2020 9:22:45 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
6/25/2020 9:22:44 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
6/25/2020 9:22:43 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
6/25/2020 9:22:42 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
6/25/2020 9:22:41 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Brooks Kaufman on behalf of Intermountain Rural Electric Association
6/25/2020 9:22:40 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Grant Schmidt on behalf of Hanover SD 28
6/25/2020 9:22:39 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of Hanover Fire Protection District
6/25/2020 9:22:38 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Gary Smith on behalf of Wigwam Mutual Water Co
6/25/2020 9:22:38 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Thomas Wiersma on behalf of Ft. Carson, Directorate of Public Works, Master Planning
6/25/2020 9:22:37 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
6/25/2020 9:22:37 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joel Stahn on behalf of Fountain Valley Power
6/25/2020 9:22:36 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
6/25/2020 9:22:35 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Renee Schroeder on behalf of Fountain Valley Authority
6/25/2020 9:22:34 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
6/25/2020 9:22:34 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kristy Martinez on behalf of Fountain
6/25/2020 9:22:33 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
6/25/2020 9:22:33 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Peter Susemihl on behalf of Eldorado Village Metro
6/25/2020 9:22:32 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
6/25/2020 9:22:32 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
6/25/2020 9:22:31 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
6/25/2020 9:22:31 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/25/2020 9:22:30 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
6/25/2020 9:22:30 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Brooks Kaufman on behalf of Intermountain Rural Electric Association
6/25/2020 9:22:29 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Grant Schmidt on behalf of Hanover SD 28
6/25/2020 9:22:29 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Heather on behalf of City of Fountain Electric
6/25/2020 9:22:28 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of Hanover Fire Protection District
6/25/2020 9:22:28 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
6/25/2020 9:22:27 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Thomas Wiersma on behalf of Ft. Carson, Directorate of Public Works, Master Planning
6/25/2020 9:22:27 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joe Valdez on behalf of Black Hills Energy-Aquila
6/25/2020 9:22:26 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joel Stahn on behalf of Fountain Valley Power
6/25/2020 9:22:26 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
6/25/2020 9:22:25 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Renee Schroeder on behalf of Fountain Valley Authority
6/25/2020 9:22:25 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
6/25/2020 9:22:24 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/25/2020 9:22:24 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kristy Martinez on behalf of Fountain
6/25/2020 9:22:23 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Peter Susemihl on behalf of Eldorado Village Metro
6/25/2020 9:22:23 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/25/2020 9:22:22 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
6/25/2020 9:22:22 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
6/25/2020 9:22:21 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/25/2020 9:22:21 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
6/25/2020 9:22:20 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
6/25/2020 9:22:20 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Justin Osborne on behalf of Colorado State Land Board
6/25/2020 9:22:19 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
6/25/2020 9:22:19 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Heather on behalf of City of Fountain Electric
6/25/2020 9:22:18 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/25/2020 9:22:18 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
6/25/2020 9:22:17 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joe Valdez on behalf of Black Hills Energy-Aquila
6/25/2020 9:22:16 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
6/25/2020 9:22:16 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
6/25/2020 9:22:15 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Michael Diehl on behalf of Xcel Energy
6/25/2020 9:22:15 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
6/25/2020 9:22:14 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of Parks Advisory Board
6/25/2020 9:22:14 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
6/25/2020 9:22:13 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/25/2020 9:22:13 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/25/2020 9:22:12 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/25/2020 9:22:12 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
6/25/2020 9:22:11 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
6/25/2020 9:22:11 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/25/2020 9:22:10 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Justin Osborne on behalf of Colorado State Land Board
6/25/2020 9:22:10 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of EPC Parks Department
6/25/2020 9:22:09 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
6/25/2020 9:22:09 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Catherine McGarvy on behalf of EPC Health Department
6/25/2020 9:22:08 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/25/2020 9:22:06 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kathy Andrew on behalf of EPC Environmental Services
6/25/2020 9:22:06 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Sean Hackett on behalf of Colorado Department of Public Health and Environment
6/25/2020 9:22:05 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Lori Seago on behalf of County Attorney - Development Review
6/25/2020 9:22:05 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Michael Diehl on behalf of Xcel Energy
6/25/2020 9:22:04 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
6/25/2020 9:22:04 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of Parks Advisory Board
6/25/2020 9:22:03 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/25/2020 9:22:03 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/25/2020 9:22:02 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Commander John Padgett on behalf of EPC Sheriff's Department
6/25/2020 9:22:01 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
6/25/2020 9:22:00 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by on behalf of EPC Parks Department
6/25/2020 9:21:59 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Catherine McGarvy on behalf of EPC Health Department
6/25/2020 9:21:56 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kathy Andrew on behalf of EPC Environmental Services
6/25/2020 9:21:55 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Lori Seago on behalf of County Attorney - Development Review
6/25/2020 9:21:54 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Kari Parsons on behalf of PCD Project Manager
6/25/2020 9:21:53 AM Request for Review Comments email sent for Project Front Range Midway Solar Amendment WSE-O for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/25/2020 8:59:59 AM Fees paid: 6/25/2020 (Receipt: 1002897)
6/18/2020 5:23:53 PM Payment Request sent: 6/18/2020
6/18/2020 5:23:53 PM File # Assigned: WSEO201
6/18/2020 5:23:42 PM Submission Triaged
6/18/2020 3:42:38 PM Submission received from Applicant
5/20/2020 10:26:35 AM Submission request sent to Applicant
5/20/2020 9:57:01 AM Project Manager Assigned: Kari Parsons
5/20/2020 9:57:01 AM EA Assigned: 17-46
5/20/2020 9:57:01 AM Project Created