10/30/2020 7:10:15 AM
|
Project Closed
|
10/30/2020 7:10:15 AM
|
Project Approved: 10/30/2020
|
10/30/2020 7:09:58 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
9/17/2020 8:33:05 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/11/2020 9:01:31 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/8/2020 1:39:50 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/3/2020 11:57:32 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
8/27/2020 7:39:22 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
8/27/2020 7:30:11 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
8/27/2020 7:30:10 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Mr. Michael Shafer on behalf of Peterson AFB
|
8/27/2020 7:30:09 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
8/27/2020 7:30:08 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Louis Joniah on behalf of Metex Metro
|
8/27/2020 7:30:07 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Melissa Andrews on behalf of Falcon School District 49
|
8/27/2020 7:30:06 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Peter Susemilh on behalf of Constitution Heights Metro
|
8/27/2020 7:30:05 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Terry Johns on behalf of Colorado Springs SD 11
|
8/27/2020 7:30:04 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
8/27/2020 7:30:03 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Fire Protection Engineer II Steve Smith on behalf of Colorado Springs Fire Department
|
8/27/2020 7:30:02 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
8/27/2020 7:30:01 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Autumn Mason on behalf of Central Marksheffel Metro
|
8/27/2020 7:30:00 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
8/27/2020 7:29:58 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Nikki Simmons on behalf of Finance
|
8/27/2020 7:29:57 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
8/27/2020 7:29:56 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/27/2020 7:29:55 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Kari Parsons on behalf of PCD Project Manager
|
8/27/2020 7:29:53 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/27/2020 7:28:23 AM
|
Submission Triaged
|
8/26/2020 3:30:41 PM
|
Submission received from Applicant
|
8/24/2020 9:33:47 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/13/2020 8:42:48 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/13/2020 2:37:38 PM
|
Request for Review Comments returned by EPC Parks Department
|
8/12/2020 9:03:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/12/2020 4:16:20 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
8/11/2020 5:26:16 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
8/10/2020 3:08:02 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
8/9/2020 5:11:26 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
8/6/2020 4:34:42 PM
|
Submission request sent to Applicant
|
8/6/2020 4:29:50 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/3/2020 9:00:02 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/27/2020 10:24:47 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
7/27/2020 8:22:09 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/23/2020 10:05:38 AM
|
Request for Review Comments returned by CIG Colorado Interstate Gas
|
7/22/2020 2:32:30 PM
|
Request for Review Comments returned by Schriever AFB
|
7/22/2020 1:35:18 PM
|
Request for Review Comments returned by Cimarron Hills Fire
|
7/22/2020 8:31:45 AM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
7/22/2020 6:54:19 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Darren Horstmeier on behalf of Schriever AFB
|
7/22/2020 6:54:17 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
7/22/2020 6:54:16 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Mr. Michael Shafer on behalf of Peterson AFB
|
7/22/2020 6:54:15 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
7/22/2020 6:54:14 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
7/22/2020 6:54:13 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Louis Joniah on behalf of Metex Metro
|
7/22/2020 6:54:11 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Melissa Andrews on behalf of Falcon School District 49
|
7/22/2020 6:54:10 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
7/22/2020 6:54:09 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Peter Susemilh on behalf of Constitution Heights Metro
|
7/22/2020 6:54:08 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/22/2020 6:54:07 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Terry Johns on behalf of Colorado Springs SD 11
|
7/22/2020 6:54:02 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
7/22/2020 6:54:01 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
7/22/2020 6:54:00 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Fire Protection Engineer II Steve Smith on behalf of Colorado Springs Fire Department
|
7/22/2020 6:53:59 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
7/22/2020 6:53:57 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
7/22/2020 6:53:56 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
7/22/2020 6:53:55 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
7/22/2020 6:53:54 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Autumn Mason on behalf of Central Marksheffel Metro
|
7/22/2020 6:53:53 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/22/2020 6:53:51 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/22/2020 6:53:49 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
7/22/2020 6:53:48 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Nikki Simmons on behalf of Finance
|
7/22/2020 6:53:47 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
7/22/2020 6:53:46 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by on behalf of EPC Parks Department
|
7/22/2020 6:53:45 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
7/22/2020 6:53:43 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Kari Parsons on behalf of PCD Project Manager
|
7/22/2020 6:53:42 AM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/22/2020 6:52:38 AM
|
Submission Triaged
|
7/21/2020 3:30:08 PM
|
Submission received from Applicant
|
7/14/2020 11:21:23 AM
|
Submission request sent to Applicant
|
7/14/2020 11:21:05 AM
|
Submission Triaged
|
7/13/2020 5:46:38 PM
|
Submission received from Applicant
|
7/8/2020 12:42:43 PM
|
Project Manager Assigned: Kari Parsons
|
7/7/2020 2:10:32 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
7/7/2020 10:00:29 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
6/30/2020 3:51:05 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/29/2020 5:01:09 PM
|
Submission request sent to Applicant
|
6/29/2020 5:00:08 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/29/2020 4:59:36 PM
|
Request for Review Comments email resent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Gabe Sevigny on behalf of PCD Project Manager
|
6/29/2020 4:57:47 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/29/2020 12:59:18 PM
|
Request for Review Comments returned by EPC Parks Department
|
6/26/2020 2:56:33 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/24/2020 4:22:01 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
6/23/2020 12:03:49 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
6/22/2020 11:41:50 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
6/17/2020 11:09:27 AM
|
Project Manager Assigned: Gabe Sevigny
|
6/11/2020 3:36:14 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/9/2020 8:58:25 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/3/2020 2:43:28 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
6/2/2020 2:16:15 PM
|
Request for Review Comments returned by Falcon Fire Protection District
|
6/2/2020 2:16:14 PM
|
Request for Review Comments returned by Schriever AFB
|
6/2/2020 1:52:19 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Darren Horstmeier on behalf of Schriever AFB
|
6/2/2020 1:52:18 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
6/2/2020 1:52:17 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Mr. Michael Shafer on behalf of Peterson AFB
|
6/2/2020 1:52:17 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
6/2/2020 1:52:16 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
6/2/2020 1:52:14 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Louis Joniah on behalf of Metex Metro
|
6/2/2020 1:52:13 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Melissa Andrews on behalf of Falcon School District 49
|
6/2/2020 1:52:12 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
6/2/2020 1:52:09 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Peter Susemilh on behalf of Constitution Heights Metro
|
6/2/2020 1:52:08 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/2/2020 1:52:07 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Terry Johns on behalf of Colorado Springs SD 11
|
6/2/2020 1:52:06 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
6/2/2020 1:52:05 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
6/2/2020 1:52:04 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Fire Protection Engineer II Steve Smith on behalf of Colorado Springs Fire Department
|
6/2/2020 1:52:03 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
6/2/2020 1:52:02 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
6/2/2020 1:52:01 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
6/2/2020 1:52:01 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
6/2/2020 1:52:00 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Autumn Mason on behalf of Central Marksheffel Metro
|
6/2/2020 1:51:59 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
6/2/2020 1:51:58 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
6/2/2020 1:51:57 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
6/2/2020 1:51:56 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Nikki Simmons on behalf of Finance
|
6/2/2020 1:51:55 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
6/2/2020 1:51:54 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by on behalf of EPC Parks Department
|
6/2/2020 1:51:53 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/2/2020 1:51:52 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Kari Parsons on behalf of PCD Project Manager
|
6/2/2020 1:51:51 PM
|
Request for Review Comments email sent for Project Crossroads Metropolitan District Nos. 1 & 2 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/2/2020 1:48:42 PM
|
Fees paid: 6/2/2020 (Receipt: 1002796)
|
5/27/2020 10:06:24 AM
|
Payment Request sent: 5/27/2020
|
5/27/2020 10:06:24 AM
|
File # Assigned: ID201
|
5/27/2020 10:06:21 AM
|
Submission Triaged
|
5/21/2020 2:44:24 PM
|
Submission received from Applicant
|
5/20/2020 9:48:51 AM
|
Submission request sent to Applicant
|
5/20/2020 9:43:10 AM
|
Project Manager Assigned: Kari Parsons
|
5/20/2020 9:43:10 AM
|
Project Created
|