Project Details

Search


File Number
SP208
Project Name
Homestead North Preliminary Plan
Description
147 single family lots, 11 tracts for drainage, utilities and open space, Water sufficiency requested. Briargate Parkway and Sterling Ranch Road CDs requested to be approved with this (includes two channel crossings)
Location
North of Briargate Parkway and east of Vollmer Road.
Parcels
5228000030 5228000030 5233000014 5233000014 5233000017 5233000017
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA2060
File Prefix
SP - Preliminary Plan
Year
2020
Project Manager
Kari Parsons
Status
Closed
Created
5/7/2020 4:20:15 PM

View: Review Comments


Approved Documents (16)

Link Document
View Grading & Erosion Control checklist
View Financial Assurance Forms
View PBMP Applicability Form
View PDB/BMP Operations & Maintenance Manual
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)
View SWMP checklist
View Grading & Erosion Control Plan
View Storm Water Management Plan (SWMP)
View Drainage Report - Preliminary
View Traffic Impact Study
View Deviation Request
View Early Utility Plans
View HN Intersection Spacing Deviation Request
View Homestead North Early Sanitary Sewer Plans
View MS4 Ponds A, B, and C
View SDI Ponds A, B, and C


Additional Documents (7)

Link Document Comment
View Notice, Map and Labels
View Posting Photo
View PC Report
View BoCC Staff Report
View PC Resolution
View BOCC RESOLUTION 22-165 AMENDED
View Grading Sheet Amended Approved 9/2022


Review Documents (77)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 11/10/2020 8:00:50 AM
View Application/Petition Form 4/14/2022 8:16:22 AM
View Grading & Erosion Control checklist 7/13/2021 5:03:29 PM
View Legal Description (MS WORD Version required) 3/12/2021 12:11:57 PM
View Letter of Intent 4/14/2022 8:16:22 AM
View Title Commitment (Current within 30 days of submittal) 11/10/2020 8:03:09 AM
View Vicinity/Location Map 11/10/2020 8:03:10 AM
View Clearance Letter - USF&W 11/6/2020 6:05:30 PM
View Colorado Geological Survey Receipt 11/10/2020 8:00:51 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 2/1/2022 6:27:03 AM
View Financial Assurance Forms 3/29/2022 11:11:53 AM
View Mineral Rights Certification 11/10/2020 8:01:48 AM
View MS4 Post Construction Form 1/27/2022 11:44:43 AM
View PBMP Applicability Form 5/2/2022 9:15:53 AM
View PDB/BMP Operations & Maintenance Manual 8/18/2021 12:55:20 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 8/3/2021 9:38:11 AM
View SWMP checklist 4/29/2022 3:40:19 PM
View Construction Drawings (Plans/Profiles) 3/29/2022 7:23:39 AM
View Grading & Erosion Control Plan 9/19/2022 2:55:16 PM
View Preliminary Plan Drawings 4/29/2022 1:40:40 PM
View Storm Water Management Plan (SWMP) 7/13/2021 5:01:00 PM
View Predevelopment (Early) Grading Request 8/3/2021 9:19:03 AM
View Commitment letter from waste water service provider 3/12/2021 12:37:11 PM
View Commitment letter from water service provider 3/7/2022 6:09:40 AM
View Electric Provider Commitment Letter 11/10/2020 8:00:53 AM
View Fire Commitment Letter 11/10/2020 8:00:54 AM
View Natural Gas Commitment Letter 11/10/2020 8:01:48 AM
View Drainage Report - Preliminary 3/29/2022 7:28:29 AM
View Fire Protection Report 11/10/2020 8:00:54 AM
View Natural Landforms, Vegetation, Riparian Analysis 11/10/2020 8:09:27 AM
View Noxious Weed Management Plan 11/10/2020 8:01:49 AM
View Soils & Geology Report 11/10/2020 8:00:54 AM
View Subdivision Summary Sheet 3/12/2021 12:07:57 PM
View Traffic Impact Study 10/28/2021 2:41:11 PM
View Wastewater Disposal Report 3/12/2021 12:37:12 PM
View Water Resources Report 3/4/2022 3:29:35 PM
View Water Supply Information Summary 3/4/2022 4:21:33 PM
View Deviation Request 2/9/2022 6:46:31 AM
View Early Utility Plans 2/9/2022 6:49:24 AM
View ESQCP 10/25/2021 1:21:24 PM
View FAE East and West 2/1/2022 6:30:35 AM
View GEC Checklist 4/29/2022 3:40:19 PM
View GESC Plan Rev. 1 8/10/2022 9:16:08 AM
View HN Intersection Spacing Deviation Request 8/3/2021 9:43:54 AM
View Homestead North Early Sanitary Sewer Plans 10/25/2021 1:18:08 PM
View Homestead North Early Water Plans 10/25/2021 1:18:09 PM
View Homestead North Noise Study 11/10/2020 8:10:33 AM
View Homestead North SWMP 10/25/2021 1:21:22 PM
View JR Response to CGS comments 10/25/2021 1:15:19 PM
View JR Response to Deviation request redlines 10/25/2021 1:15:19 PM
View JR Response to Engineering Comment Letter 11/2/2021 2:25:39 PM
View JR Response to Engr comment letter 3/29/2022 7:30:40 AM
View JR response to GEC and Prelim Plan eng redlines 10/25/2021 12:56:09 PM
View JR Response to GEC comments 1/27/2022 11:29:58 AM
View JR Response to GEC redlines 3/29/2022 7:30:40 AM
View JR response to misc document redlines 8/3/2021 9:29:19 AM
View JR Response to PDR comments 1/27/2022 11:29:05 AM
View JR response to PDR redlines 10/25/2021 12:56:00 PM
View JR Response to Prelim plan redlines 10/25/2021 1:15:16 PM
View JR response to sht 8 comments 9/19/2022 2:56:29 PM
View JR response to SWMP redlines 7/13/2021 5:03:30 PM
View Letter of Intent 10/28/2021 2:41:13 PM
View LSC Response to TIS comments 1/12/2022 9:30:53 AM
View LSC responses to PCD Engineering 8/6/2021 3:47:53 PM
View Maintenance Trail Layout 8/3/2021 9:47:17 AM
View MS4 Ponds A, B, and C 10/25/2021 1:21:24 PM
View NES Response to Preliminary Plan PCD Engineering Redlines 3/29/2022 9:17:17 AM
View Noise Analysis 11/2/2021 2:24:05 PM
View Noise Study 1/12/2022 9:30:51 AM
View Pond C and B Notice to State Engineer 3/29/2022 7:30:38 AM
View Pre-development and Site grading acknowledgement 5/5/2022 1:21:58 PM
View SDI Ponds A, B, and C 10/25/2021 1:21:25 PM
View SR_Homestead North_Ph 1 WasteWater Report 3/4/2022 3:29:36 PM
View Traffic Impact Study 1/25/2022 1:38:30 PM
View Traffic Impact Study 8/6/2021 3:47:51 PM
View Utility Plan Rev. 1 August 4 2022 8/10/2022 9:08:39 AM
View Water Resources Report for Water Sufficiency 2/23/2022 8:45:05 AM



Events (329)

Date Comment
10/11/2022 3:36:01 PM Project Closed
10/11/2022 3:36:01 PM Project Approved: 10/11/2022
10/11/2022 3:35:01 PM Request for Review Comments returned by PCD Project Manager
10/3/2022 4:45:18 PM Request for Review Comments returned by PCD Engineering Division
9/22/2022 5:00:27 PM Request for Review Comments returned by EPC Stormwater Review
9/19/2022 5:32:41 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/19/2022 5:32:40 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
9/19/2022 5:32:38 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/19/2022 5:30:44 PM Submission Triaged
9/19/2022 2:56:35 PM Submission received from Applicant
9/8/2022 9:38:04 AM Submission request sent to Applicant
9/7/2022 7:09:20 AM Request for Review Comments returned by PCD Project Manager
9/6/2022 5:21:53 PM Request for Review Comments returned by EPC Stormwater Review
9/6/2022 5:02:37 PM Request for Review Comments returned by PCD Engineering Division
8/10/2022 10:53:38 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
8/10/2022 10:53:36 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/10/2022 10:53:34 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/10/2022 10:51:46 AM Submission Triaged
8/10/2022 9:22:50 AM Submission received from Applicant
8/4/2022 7:22:36 AM Submission request sent to Applicant
8/4/2022 7:20:41 AM Project reopened for Review Comments
5/18/2022 10:27:21 AM Project Closed
5/18/2022 10:27:21 AM Project Approved: 5/18/2022
5/17/2022 2:14:59 PM Project Ready for Approval requests. Review Comment period is complete.
5/16/2022 3:58:42 PM Request for Review Comments returned by PCD Engineering Division
5/16/2022 1:44:14 PM Request for Review Comments returned by PCD Project Manager
5/5/2022 1:59:27 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
5/5/2022 1:59:25 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/5/2022 1:50:51 PM Submission Triaged
5/5/2022 1:22:04 PM Submission received from Applicant
4/27/2022 10:54:59 AM Submission request sent to Applicant
4/27/2022 10:24:18 AM Request for Review Comments returned by PCD Engineering Division
4/23/2022 4:29:48 PM Request for Review Comments returned by EPC Health Department
4/15/2022 8:47:08 AM Request for Review Comments returned by County Attorney - Water
4/14/2022 10:32:28 AM Submission Triaged
4/14/2022 10:13:30 AM Submission received from Applicant
4/14/2022 9:57:42 AM Request for Review Comments returned by Parks Advisory Board
4/14/2022 7:07:47 AM Submission request sent to Applicant
4/14/2022 6:56:24 AM Request for Review Comments returned by PCD Project Manager
3/31/2022 8:21:08 AM Request for Review Comments returned by EPC Stormwater Review
3/31/2022 7:04:00 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/31/2022 7:03:58 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
3/31/2022 7:03:57 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
3/31/2022 7:03:55 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/31/2022 6:59:47 AM Submission Triaged
3/30/2022 3:01:19 PM Request for Review Comments returned by Colorado Division of Water Resources
3/29/2022 11:13:04 AM Submission received from Applicant
3/29/2022 10:50:34 AM Request for Review Comments returned by Colorado Springs Public Works
3/17/2022 2:17:43 PM Submission request sent to Applicant
3/17/2022 2:16:14 PM Request for Review Comments returned by EPC Stormwater Review
3/17/2022 2:00:25 PM Request for Review Comments returned by PCD Engineering Division
3/17/2022 12:31:31 PM Request for Review Comments returned by PCD Project Manager
3/16/2022 9:58:28 AM Request for Review Comments returned by Colorado Geological Survey
3/15/2022 3:22:14 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/15/2022 12:36:29 PM Request for Review Comments returned by Colorado State Forest Service
3/15/2022 12:20:50 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/11/2022 3:35:19 PM Request for Review Comments returned by EPC Parks Department
3/7/2022 7:07:10 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/7/2022 7:07:06 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
3/7/2022 7:03:38 AM Submission Triaged
3/7/2022 6:11:57 AM Submission received from Applicant
3/1/2022 1:55:10 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
2/28/2022 11:51:06 AM Request for Review Comments returned by EPC Environmental Services
2/28/2022 7:19:41 AM Request for Review Comments returned by Academy SD 20 Building Fund
2/24/2022 7:57:32 AM Request for Review Comments returned by El Paso County Conservation Dist
2/23/2022 12:16:47 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
2/23/2022 11:50:34 AM Request for Review Comments returned by Black Forest Land Use Committee
2/23/2022 11:50:13 AM Request for Review Comments returned by Colorado Parks and Wildlife
2/23/2022 11:06:52 AM Request for Review Comments returned by RBD Floodplain
2/23/2022 9:06:28 AM Submission request sent to Applicant
2/23/2022 8:58:14 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
2/23/2022 8:58:12 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
2/23/2022 8:58:10 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
2/23/2022 8:58:02 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
2/23/2022 8:58:00 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
2/23/2022 8:57:52 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
2/23/2022 8:57:44 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
2/23/2022 8:57:33 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
2/23/2022 8:57:31 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
2/23/2022 8:57:29 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
2/23/2022 8:57:27 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
2/23/2022 8:57:24 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
2/23/2022 8:57:21 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
2/23/2022 8:57:19 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
2/23/2022 8:57:17 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
2/23/2022 8:57:15 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
2/23/2022 8:57:13 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
2/23/2022 8:57:09 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
2/23/2022 8:57:05 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/23/2022 8:57:03 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
2/23/2022 8:57:01 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
2/23/2022 8:56:56 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
2/23/2022 8:56:52 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
2/23/2022 8:56:46 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
2/23/2022 8:56:44 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
2/23/2022 8:56:40 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
2/23/2022 8:56:36 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
2/23/2022 8:56:34 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
2/23/2022 8:56:32 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
2/23/2022 8:56:27 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
2/23/2022 8:56:19 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
2/23/2022 8:56:15 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
2/23/2022 8:56:13 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
2/23/2022 8:56:10 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
2/23/2022 8:56:05 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
2/23/2022 8:49:10 AM Submission Triaged
2/23/2022 8:48:05 AM Submission received from Applicant
1/6/2022 4:52:33 PM Project Manager Assigned: Kari Parsons
12/13/2021 9:17:10 PM Submission request sent to Applicant
12/12/2021 8:41:41 PM Request for Review Comments returned by PCD Engineering Division
12/6/2021 4:33:12 PM Project Manager Assigned: Nina Ruiz
12/6/2021 10:11:55 AM Request for Review Comments returned by PCD Project Manager
12/3/2021 12:37:27 PM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/29/2021 12:22:04 PM Request for Review Comments returned by Colorado Springs Public Works
11/22/2021 3:11:16 PM Request for Review Comments returned by EPC Stormwater Review
11/11/2021 12:09:27 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/3/2021 7:48:05 AM Request for Review Comments returned by RBD Floodplain
11/3/2021 7:41:20 AM Request for Review Comments returned by County Attorney - Water
11/3/2021 7:33:39 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
11/3/2021 7:33:34 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/3/2021 7:32:38 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
11/3/2021 7:32:36 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
11/3/2021 7:32:34 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/3/2021 7:32:22 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
11/3/2021 7:32:16 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
11/3/2021 7:32:14 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
11/3/2021 7:32:09 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/3/2021 7:32:06 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/3/2021 7:31:59 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/3/2021 7:31:55 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/3/2021 7:31:48 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
11/3/2021 7:31:45 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
11/3/2021 7:31:41 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/3/2021 7:18:43 AM Submission Triaged
11/2/2021 2:31:42 PM Submission received from Applicant
9/14/2021 7:48:46 AM Submission request sent to Applicant
9/14/2021 7:46:05 AM Submission request sent to Applicant
9/13/2021 11:46:08 AM Request for Review Comments returned by PCD Engineering Division
9/7/2021 12:46:39 PM Request for Review Comments returned by County Attorney - Water
9/5/2021 1:07:22 PM Request for Review Comments returned by EPC Health Department
9/3/2021 8:39:17 AM Request for Review Comments returned by PCD Project Manager
9/3/2021 7:50:38 AM Request for Review Comments email resent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
9/2/2021 4:15:10 PM Request for Review Comments returned by Colorado Springs Public Works
8/31/2021 11:57:24 AM Request for Review Comments returned by Parks Advisory Board
8/31/2021 11:56:12 AM Request for Review Comments returned by EPC Parks Department
8/31/2021 9:01:10 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/26/2021 8:20:45 AM Request for Review Comments returned by El Paso County Conservation Dist
8/25/2021 2:32:46 PM Request for Review Comments returned by EPC Environmental Services
8/25/2021 1:21:31 PM Request for Review Comments returned by Colorado Geological Survey
8/25/2021 11:34:31 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/24/2021 1:55:17 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
8/23/2021 12:04:47 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/23/2021 11:29:47 AM Request for Review Comments returned by EPC Stormwater Review
8/18/2021 1:38:50 PM Submission Triaged
8/18/2021 12:55:50 PM Submission received from Applicant
8/17/2021 8:04:52 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
8/17/2021 9:38:46 AM Submission request sent to Applicant
8/16/2021 7:42:32 AM Request for Review Comments returned by Academy SD 20 Building Fund
8/13/2021 10:37:27 AM Request for Review Comments returned by Colorado State Forest Service
8/11/2021 6:16:13 AM Request for Review Comments returned by Black Forest Land Use Committee
8/10/2021 3:11:14 PM Request for Review Comments returned by County Attorney - Development Review
8/10/2021 7:19:07 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
8/9/2021 2:34:46 PM Request for Review Comments returned by County Attorney - Water
8/9/2021 8:43:01 AM Request for Review Comments returned by RBD Floodplain
8/6/2021 5:14:12 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
8/6/2021 5:14:10 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
8/6/2021 5:14:08 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
8/6/2021 5:14:00 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
8/6/2021 5:13:58 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
8/6/2021 5:13:56 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
8/6/2021 5:13:48 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
8/6/2021 5:13:46 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
8/6/2021 5:13:44 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
8/6/2021 5:13:39 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
8/6/2021 5:13:37 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
8/6/2021 5:13:35 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
8/6/2021 5:13:33 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
8/6/2021 5:13:31 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
8/6/2021 5:13:29 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
8/6/2021 5:13:26 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
8/6/2021 5:13:24 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
8/6/2021 5:13:20 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
8/6/2021 5:13:16 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
8/6/2021 5:13:14 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
8/6/2021 5:13:12 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
8/6/2021 5:13:08 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
8/6/2021 5:13:06 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
8/6/2021 5:13:00 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
8/6/2021 5:12:58 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
8/6/2021 5:12:54 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
8/6/2021 5:12:50 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
8/6/2021 5:12:48 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
8/6/2021 5:12:46 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
8/6/2021 5:12:36 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
8/6/2021 5:12:28 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
8/6/2021 5:12:26 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
8/6/2021 5:12:24 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
8/6/2021 5:12:22 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
8/6/2021 5:12:17 PM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/6/2021 5:07:39 PM Submission Triaged
8/6/2021 4:31:28 PM Submission received from Applicant
4/27/2021 3:53:08 PM Submission request sent to Applicant
4/27/2021 3:50:57 PM Submission request sent to Applicant
4/23/2021 6:32:29 PM Request for Review Comments returned by PCD Engineering Division
4/20/2021 3:06:05 PM Request for Review Comments returned by EPC Health Department
4/16/2021 11:56:39 AM Request for Review Comments returned by PCD Project Manager
4/14/2021 7:59:20 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
4/8/2021 4:09:36 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/8/2021 4:04:46 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
4/7/2021 1:39:39 PM Request for Review Comments returned by Colorado Geological Survey
4/7/2021 11:05:12 AM Request for Review Comments returned by Pikes Peak Regional Building Department
4/6/2021 5:47:39 PM Request for Review Comments returned by EPC Stormwater Review
4/2/2021 12:56:11 PM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/1/2021 3:04:31 PM Request for Review Comments returned by Parks Advisory Board
4/1/2021 3:03:33 PM Request for Review Comments returned by EPC Parks Department
3/27/2021 6:58:43 AM Request for Review Comments returned by Black Forest Land Use Committee
3/22/2021 7:37:06 AM Request for Review Comments returned by Academy SD 20 Building Fund
3/18/2021 4:07:51 PM Request for Review Comments returned by County Attorney - Water
3/18/2021 12:29:28 PM Request for Review Comments returned by Trails and Open Space Coalition
3/18/2021 7:36:28 AM Request for Review Comments returned by RBD Floodplain
3/18/2021 7:19:57 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
3/18/2021 7:19:55 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
3/18/2021 7:19:53 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
3/18/2021 7:19:51 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
3/18/2021 7:19:49 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
3/18/2021 7:19:47 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
3/18/2021 7:19:44 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
3/18/2021 7:19:42 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
3/18/2021 7:19:40 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
3/18/2021 7:19:38 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/18/2021 7:19:36 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
3/18/2021 7:19:33 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
3/18/2021 7:19:30 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
3/18/2021 7:19:28 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
3/18/2021 7:19:26 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
3/18/2021 7:19:24 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
3/18/2021 7:19:22 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
3/18/2021 7:19:20 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
3/18/2021 7:19:14 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/18/2021 7:19:12 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
3/18/2021 7:19:08 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/18/2021 7:19:04 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
3/18/2021 7:19:02 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
3/18/2021 7:18:54 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
3/18/2021 7:18:52 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
3/18/2021 7:18:47 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/18/2021 7:14:10 AM Submission Triaged
3/17/2021 3:44:17 PM Submission received from Applicant
1/30/2021 1:49:03 PM Request for Review Comments returned by EPC Health Department
1/14/2021 9:45:03 AM Request for Review Comments returned by Parks Advisory Board
1/12/2021 5:19:16 PM Request for Review Comments returned by PCD Project Manager
1/12/2021 5:15:57 PM Request for Review Comments email resent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
1/7/2021 5:22:44 PM Submission request sent to Applicant
1/7/2021 5:19:28 PM Submission request sent to Applicant
1/7/2021 5:16:49 PM Request for Review Comments returned by PCD Project Manager
1/6/2021 6:50:59 PM Request for Review Comments returned by PCD Engineering Division
12/29/2020 3:58:54 PM Request for Review Comments returned by Colorado Geological Survey
12/22/2020 4:52:06 PM Request for Review Comments returned by Colorado Division of Water Resources
12/18/2020 10:37:12 AM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/17/2020 10:55:03 AM Request for Review Comments returned by Colorado Parks and Wildlife
12/16/2020 11:58:40 AM Request for Review Comments returned by Pikes Peak Regional Building Department
12/16/2020 8:34:35 AM Request for Review Comments returned by EPC Stormwater Review
12/12/2020 10:02:13 PM Request for Review Comments returned by County Attorney - Development Review
12/11/2020 8:27:08 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
12/10/2020 9:28:07 AM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
12/9/2020 11:36:12 AM Request for Review Comments returned by EPC Parks Department
12/8/2020 1:33:02 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
12/3/2020 3:34:53 PM Request for Review Comments returned by EPC Environmental Services
12/1/2020 11:42:59 AM Request for Review Comments returned by Black Forest Land Use Committee
12/1/2020 8:45:23 AM Request for Review Comments returned by Academy SD 20 Building Fund
12/1/2020 7:49:22 AM Request for Review Comments returned by El Paso County Conservation Dist
11/30/2020 10:16:01 AM Request for Review Comments returned by Colorado State Forest Service
11/30/2020 8:36:14 AM Request for Review Comments returned by County Attorney - Water
11/30/2020 7:40:40 AM Request for Review Comments returned by RBD Floodplain
11/27/2020 9:39:40 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
11/27/2020 9:39:38 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
11/27/2020 9:39:36 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/27/2020 9:39:34 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
11/27/2020 9:39:32 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
11/27/2020 9:39:28 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
11/27/2020 9:39:25 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
11/27/2020 9:39:23 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
11/27/2020 9:39:21 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/27/2020 9:39:19 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
11/27/2020 9:39:17 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
11/27/2020 9:39:15 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
11/27/2020 9:39:13 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
11/27/2020 9:39:11 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/27/2020 9:39:09 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
11/27/2020 9:39:06 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/27/2020 9:39:03 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
11/27/2020 9:39:00 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
11/27/2020 9:38:58 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/27/2020 9:38:56 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/27/2020 9:38:54 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
11/27/2020 9:38:52 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
11/27/2020 9:38:50 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/27/2020 9:38:48 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/27/2020 9:38:46 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
11/27/2020 9:38:43 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/27/2020 9:38:40 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
11/27/2020 9:38:37 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
11/27/2020 9:38:35 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
11/27/2020 9:38:33 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
11/27/2020 9:38:26 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
11/27/2020 9:38:23 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
11/27/2020 9:38:21 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
11/27/2020 9:38:19 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
11/27/2020 9:38:17 AM Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/25/2020 1:31:33 PM Fees paid: 11/25/2020 (Receipt: 1003607)
11/19/2020 7:07:22 AM Submission Triaged
11/18/2020 6:07:26 PM Submission received from Applicant
11/18/2020 5:12:33 PM Submission request sent to Applicant
11/17/2020 7:25:56 AM Payment Request sent: 11/17/2020
11/17/2020 7:25:56 AM File # Assigned: SP208
11/17/2020 7:25:43 AM Submission Triaged
11/16/2020 1:15:29 PM Submission received from Applicant
11/10/2020 11:07:50 AM Submission request sent to Applicant
11/10/2020 11:07:30 AM Submission Triaged
11/10/2020 8:10:43 AM Submission received from Applicant
11/9/2020 10:09:28 AM Submission request sent to Applicant
11/6/2020 3:39:31 PM Submission request sent to Applicant
11/6/2020 3:38:41 PM Submission request sent to Applicant
11/6/2020 3:38:09 PM Submission Triaged
11/5/2020 5:06:06 PM Submission received from Applicant
5/8/2020 8:08:34 AM Submission request sent to Applicant
5/7/2020 4:20:44 PM Project Manager Assigned: Kari Parsons
5/7/2020 4:20:44 PM EA Assigned: EA2060
5/7/2020 4:20:44 PM Project Created