10/11/2022 3:36:01 PM
|
Project Closed
|
10/11/2022 3:36:01 PM
|
Project Approved: 10/11/2022
|
10/11/2022 3:35:01 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/3/2022 4:45:18 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/22/2022 5:00:27 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/19/2022 5:32:41 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/19/2022 5:32:40 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
9/19/2022 5:32:38 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/19/2022 5:30:44 PM
|
Submission Triaged
|
9/19/2022 2:56:35 PM
|
Submission received from Applicant
|
9/8/2022 9:38:04 AM
|
Submission request sent to Applicant
|
9/7/2022 7:09:20 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/6/2022 5:21:53 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/6/2022 5:02:37 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/10/2022 10:53:38 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/10/2022 10:53:36 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/10/2022 10:53:34 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/10/2022 10:51:46 AM
|
Submission Triaged
|
8/10/2022 9:22:50 AM
|
Submission received from Applicant
|
8/4/2022 7:22:36 AM
|
Submission request sent to Applicant
|
8/4/2022 7:20:41 AM
|
Project reopened for Review Comments
|
5/18/2022 10:27:21 AM
|
Project Closed
|
5/18/2022 10:27:21 AM
|
Project Approved: 5/18/2022
|
5/17/2022 2:14:59 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
5/16/2022 3:58:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/16/2022 1:44:14 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/5/2022 1:59:27 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
5/5/2022 1:59:25 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/5/2022 1:50:51 PM
|
Submission Triaged
|
5/5/2022 1:22:04 PM
|
Submission received from Applicant
|
4/27/2022 10:54:59 AM
|
Submission request sent to Applicant
|
4/27/2022 10:24:18 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/23/2022 4:29:48 PM
|
Request for Review Comments returned by EPC Health Department
|
4/15/2022 8:47:08 AM
|
Request for Review Comments returned by County Attorney - Water
|
4/14/2022 10:32:28 AM
|
Submission Triaged
|
4/14/2022 10:13:30 AM
|
Submission received from Applicant
|
4/14/2022 9:57:42 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/14/2022 7:07:47 AM
|
Submission request sent to Applicant
|
4/14/2022 6:56:24 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/31/2022 8:21:08 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/31/2022 7:04:00 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/31/2022 7:03:58 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
3/31/2022 7:03:57 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/31/2022 7:03:55 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/31/2022 6:59:47 AM
|
Submission Triaged
|
3/30/2022 3:01:19 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/29/2022 11:13:04 AM
|
Submission received from Applicant
|
3/29/2022 10:50:34 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
3/17/2022 2:17:43 PM
|
Submission request sent to Applicant
|
3/17/2022 2:16:14 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/17/2022 2:00:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/17/2022 12:31:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/16/2022 9:58:28 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/15/2022 3:22:14 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/15/2022 12:36:29 PM
|
Request for Review Comments returned by Colorado State Forest Service
|
3/15/2022 12:20:50 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/11/2022 3:35:19 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/7/2022 7:07:10 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/7/2022 7:07:06 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
3/7/2022 7:03:38 AM
|
Submission Triaged
|
3/7/2022 6:11:57 AM
|
Submission received from Applicant
|
3/1/2022 1:55:10 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
2/28/2022 11:51:06 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/28/2022 7:19:41 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
2/24/2022 7:57:32 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
2/23/2022 12:16:47 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/23/2022 11:50:34 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
2/23/2022 11:50:13 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
2/23/2022 11:06:52 AM
|
Request for Review Comments returned by RBD Floodplain
|
2/23/2022 9:06:28 AM
|
Submission request sent to Applicant
|
2/23/2022 8:58:14 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
2/23/2022 8:58:12 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
2/23/2022 8:58:10 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
2/23/2022 8:58:02 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
2/23/2022 8:58:00 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
2/23/2022 8:57:52 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
2/23/2022 8:57:44 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
2/23/2022 8:57:33 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
2/23/2022 8:57:31 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
2/23/2022 8:57:29 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
2/23/2022 8:57:27 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
2/23/2022 8:57:24 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
|
2/23/2022 8:57:21 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
2/23/2022 8:57:19 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
2/23/2022 8:57:17 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
2/23/2022 8:57:15 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
2/23/2022 8:57:13 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
2/23/2022 8:57:09 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/23/2022 8:57:05 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
2/23/2022 8:57:03 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
2/23/2022 8:57:01 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
2/23/2022 8:56:56 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
2/23/2022 8:56:52 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
2/23/2022 8:56:46 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/23/2022 8:56:44 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
|
2/23/2022 8:56:40 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/23/2022 8:56:36 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
2/23/2022 8:56:34 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
2/23/2022 8:56:32 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
|
2/23/2022 8:56:27 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
2/23/2022 8:56:19 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/23/2022 8:56:15 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
2/23/2022 8:56:13 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
2/23/2022 8:56:10 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
2/23/2022 8:56:05 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/23/2022 8:49:10 AM
|
Submission Triaged
|
2/23/2022 8:48:05 AM
|
Submission received from Applicant
|
1/6/2022 4:52:33 PM
|
Project Manager Assigned: Kari Parsons
|
12/13/2021 9:17:10 PM
|
Submission request sent to Applicant
|
12/12/2021 8:41:41 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/6/2021 4:33:12 PM
|
Project Manager Assigned: Nina Ruiz
|
12/6/2021 10:11:55 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/3/2021 12:37:27 PM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/29/2021 12:22:04 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
11/22/2021 3:11:16 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/11/2021 12:09:27 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/3/2021 7:48:05 AM
|
Request for Review Comments returned by RBD Floodplain
|
11/3/2021 7:41:20 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/3/2021 7:33:39 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
11/3/2021 7:33:34 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/3/2021 7:32:38 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
11/3/2021 7:32:36 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
11/3/2021 7:32:34 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/3/2021 7:32:22 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
11/3/2021 7:32:16 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
11/3/2021 7:32:14 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
11/3/2021 7:32:09 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/3/2021 7:32:06 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
11/3/2021 7:31:59 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/3/2021 7:31:55 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/3/2021 7:31:48 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
11/3/2021 7:31:45 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
11/3/2021 7:31:41 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/3/2021 7:18:43 AM
|
Submission Triaged
|
11/2/2021 2:31:42 PM
|
Submission received from Applicant
|
9/14/2021 7:48:46 AM
|
Submission request sent to Applicant
|
9/14/2021 7:46:05 AM
|
Submission request sent to Applicant
|
9/13/2021 11:46:08 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/7/2021 12:46:39 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/5/2021 1:07:22 PM
|
Request for Review Comments returned by EPC Health Department
|
9/3/2021 8:39:17 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/3/2021 7:50:38 AM
|
Request for Review Comments email resent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
9/2/2021 4:15:10 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
8/31/2021 11:57:24 AM
|
Request for Review Comments returned by Parks Advisory Board
|
8/31/2021 11:56:12 AM
|
Request for Review Comments returned by EPC Parks Department
|
8/31/2021 9:01:10 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
8/26/2021 8:20:45 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
8/25/2021 2:32:46 PM
|
Request for Review Comments returned by EPC Environmental Services
|
8/25/2021 1:21:31 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
8/25/2021 11:34:31 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
8/24/2021 1:55:17 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
8/23/2021 12:04:47 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
8/23/2021 11:29:47 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/18/2021 1:38:50 PM
|
Submission Triaged
|
8/18/2021 12:55:50 PM
|
Submission received from Applicant
|
8/17/2021 8:04:52 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
8/17/2021 9:38:46 AM
|
Submission request sent to Applicant
|
8/16/2021 7:42:32 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
8/13/2021 10:37:27 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
8/11/2021 6:16:13 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
8/10/2021 3:11:14 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/10/2021 7:19:07 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/9/2021 2:34:46 PM
|
Request for Review Comments returned by County Attorney - Water
|
8/9/2021 8:43:01 AM
|
Request for Review Comments returned by RBD Floodplain
|
8/6/2021 5:14:12 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
8/6/2021 5:14:10 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
8/6/2021 5:14:08 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
8/6/2021 5:14:00 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
8/6/2021 5:13:58 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
8/6/2021 5:13:56 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
8/6/2021 5:13:48 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
8/6/2021 5:13:46 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
8/6/2021 5:13:44 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
8/6/2021 5:13:39 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
8/6/2021 5:13:37 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
8/6/2021 5:13:35 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
|
8/6/2021 5:13:33 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
8/6/2021 5:13:31 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
8/6/2021 5:13:29 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
8/6/2021 5:13:26 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
8/6/2021 5:13:24 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
8/6/2021 5:13:20 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/6/2021 5:13:16 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
8/6/2021 5:13:14 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
8/6/2021 5:13:12 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
8/6/2021 5:13:08 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
8/6/2021 5:13:06 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/6/2021 5:13:00 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/6/2021 5:12:58 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
|
8/6/2021 5:12:54 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/6/2021 5:12:50 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
8/6/2021 5:12:48 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
8/6/2021 5:12:46 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
|
8/6/2021 5:12:36 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
8/6/2021 5:12:28 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/6/2021 5:12:26 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
8/6/2021 5:12:24 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
8/6/2021 5:12:22 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
8/6/2021 5:12:17 PM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/6/2021 5:07:39 PM
|
Submission Triaged
|
8/6/2021 4:31:28 PM
|
Submission received from Applicant
|
4/27/2021 3:53:08 PM
|
Submission request sent to Applicant
|
4/27/2021 3:50:57 PM
|
Submission request sent to Applicant
|
4/23/2021 6:32:29 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/20/2021 3:06:05 PM
|
Request for Review Comments returned by EPC Health Department
|
4/16/2021 11:56:39 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/14/2021 7:59:20 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/8/2021 4:09:36 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
4/8/2021 4:04:46 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
4/7/2021 1:39:39 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/7/2021 11:05:12 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/6/2021 5:47:39 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/2/2021 12:56:11 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
4/1/2021 3:04:31 PM
|
Request for Review Comments returned by Parks Advisory Board
|
4/1/2021 3:03:33 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/27/2021 6:58:43 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
3/22/2021 7:37:06 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
3/18/2021 4:07:51 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/18/2021 12:29:28 PM
|
Request for Review Comments returned by Trails and Open Space Coalition
|
3/18/2021 7:36:28 AM
|
Request for Review Comments returned by RBD Floodplain
|
3/18/2021 7:19:57 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
3/18/2021 7:19:55 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
3/18/2021 7:19:53 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/18/2021 7:19:51 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
3/18/2021 7:19:49 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
3/18/2021 7:19:47 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
3/18/2021 7:19:44 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
3/18/2021 7:19:42 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
3/18/2021 7:19:40 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
3/18/2021 7:19:38 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
3/18/2021 7:19:36 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
|
3/18/2021 7:19:33 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
3/18/2021 7:19:30 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
3/18/2021 7:19:28 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
3/18/2021 7:19:26 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/18/2021 7:19:24 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/18/2021 7:19:22 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
3/18/2021 7:19:20 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/18/2021 7:19:14 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/18/2021 7:19:12 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
|
3/18/2021 7:19:08 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/18/2021 7:19:04 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
|
3/18/2021 7:19:02 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
3/18/2021 7:18:54 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
3/18/2021 7:18:52 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/18/2021 7:18:47 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/18/2021 7:14:10 AM
|
Submission Triaged
|
3/17/2021 3:44:17 PM
|
Submission received from Applicant
|
1/30/2021 1:49:03 PM
|
Request for Review Comments returned by EPC Health Department
|
1/14/2021 9:45:03 AM
|
Request for Review Comments returned by Parks Advisory Board
|
1/12/2021 5:19:16 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/12/2021 5:15:57 PM
|
Request for Review Comments email resent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/7/2021 5:22:44 PM
|
Submission request sent to Applicant
|
1/7/2021 5:19:28 PM
|
Submission request sent to Applicant
|
1/7/2021 5:16:49 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/6/2021 6:50:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/29/2020 3:58:54 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/22/2020 4:52:06 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/18/2020 10:37:12 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/17/2020 10:55:03 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/16/2020 11:58:40 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/16/2020 8:34:35 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/12/2020 10:02:13 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/11/2020 8:27:08 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/10/2020 9:28:07 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
12/9/2020 11:36:12 AM
|
Request for Review Comments returned by EPC Parks Department
|
12/8/2020 1:33:02 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/3/2020 3:34:53 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/1/2020 11:42:59 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
12/1/2020 8:45:23 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
12/1/2020 7:49:22 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
11/30/2020 10:16:01 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
11/30/2020 8:36:14 AM
|
Request for Review Comments returned by County Attorney - Water
|
11/30/2020 7:40:40 AM
|
Request for Review Comments returned by RBD Floodplain
|
11/27/2020 9:39:40 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Susan Davies on behalf of Trails and Open Space Coalition
|
11/27/2020 9:39:38 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
11/27/2020 9:39:36 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
11/27/2020 9:39:34 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
11/27/2020 9:39:32 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
11/27/2020 9:39:28 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
|
11/27/2020 9:39:25 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
11/27/2020 9:39:23 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
11/27/2020 9:39:21 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/27/2020 9:39:19 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
11/27/2020 9:39:17 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
11/27/2020 9:39:15 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by P.J. Langmaid on behalf of Black Forest Fire Protection District
|
11/27/2020 9:39:13 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
11/27/2020 9:39:11 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
11/27/2020 9:39:09 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
|
11/27/2020 9:39:06 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/27/2020 9:39:03 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
11/27/2020 9:39:00 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/27/2020 9:38:58 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/27/2020 9:38:56 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
11/27/2020 9:38:54 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
|
11/27/2020 9:38:52 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
11/27/2020 9:38:50 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
11/27/2020 9:38:48 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/27/2020 9:38:46 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of Parks Advisory Board
|
11/27/2020 9:38:43 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/27/2020 9:38:40 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
11/27/2020 9:38:37 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
11/27/2020 9:38:35 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by on behalf of EPC Parks Department
|
11/27/2020 9:38:33 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
11/27/2020 9:38:26 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/27/2020 9:38:23 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water
|
11/27/2020 9:38:21 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
11/27/2020 9:38:19 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager
|
11/27/2020 9:38:17 AM
|
Request for Review Comments email sent for Project Homestead North Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/25/2020 1:31:33 PM
|
Fees paid: 11/25/2020 (Receipt: 1003607)
|
11/19/2020 7:07:22 AM
|
Submission Triaged
|
11/18/2020 6:07:26 PM
|
Submission received from Applicant
|
11/18/2020 5:12:33 PM
|
Submission request sent to Applicant
|
11/17/2020 7:25:56 AM
|
Payment Request sent: 11/17/2020
|
11/17/2020 7:25:56 AM
|
File # Assigned: SP208
|
11/17/2020 7:25:43 AM
|
Submission Triaged
|
11/16/2020 1:15:29 PM
|
Submission received from Applicant
|
11/10/2020 11:07:50 AM
|
Submission request sent to Applicant
|
11/10/2020 11:07:30 AM
|
Submission Triaged
|
11/10/2020 8:10:43 AM
|
Submission received from Applicant
|
11/9/2020 10:09:28 AM
|
Submission request sent to Applicant
|
11/6/2020 3:39:31 PM
|
Submission request sent to Applicant
|
11/6/2020 3:38:41 PM
|
Submission request sent to Applicant
|
11/6/2020 3:38:09 PM
|
Submission Triaged
|
11/5/2020 5:06:06 PM
|
Submission received from Applicant
|
5/8/2020 8:08:34 AM
|
Submission request sent to Applicant
|
5/7/2020 4:20:44 PM
|
Project Manager Assigned: Kari Parsons
|
5/7/2020 4:20:44 PM
|
EA Assigned: EA2060
|
5/7/2020 4:20:44 PM
|
Project Created
|