| 3/28/2025 7:38:07 AM | Project Ready for Approval requests.  Review Comment period is complete. | 
                
                    | 3/26/2025 12:34:33 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/20/2025 8:36:45 AM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 3/20/2025 7:36:43 AM | Submission Triaged | 
                
                    | 3/19/2025 3:05:46 PM | Submission received from Applicant | 
                
                    | 3/14/2025 12:37:35 PM | Submission request sent to Applicant | 
                
                    | 3/14/2025 12:27:02 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/4/2025 9:47:43 AM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 3/4/2025 9:46:56 AM | Submission Triaged | 
                
                    | 3/2/2025 6:35:22 PM | Submission received from Applicant | 
                
                    | 4/17/2024 4:08:01 PM | Submission request sent to Applicant | 
                
                    | 4/15/2024 9:14:50 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 4/12/2024 10:05:50 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/10/2024 6:18:22 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/29/2024 4:26:30 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 3/29/2024 4:26:28 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 3/29/2024 4:26:26 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 3/29/2024 4:26:22 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 3/29/2024 4:26:20 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 3/29/2024 4:26:17 PM | Request for Review Comments email sent for Project Viewpoint Estates Filing No. 2 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 3/29/2024 4:23:23 PM | Submission Triaged | 
                
                    | 3/29/2024 2:52:15 PM | Submission received from Applicant | 
                
                    | 2/8/2024 3:50:57 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 2/1/2024 11:54:43 AM | Submission request sent to Applicant | 
                
                    | 2/1/2024 11:54:26 AM | Submission Triaged | 
                
                    | 1/26/2024 9:50:26 AM | Submission received from Applicant | 
                
                    | 1/23/2024 5:14:18 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 1/23/2024 5:14:16 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 1/23/2024 5:14:14 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 1/23/2024 5:14:12 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 1/19/2024 1:14:01 PM | Request for Review Comments returned by Ellicott Fire Protection District | 
                
                    | 1/17/2024 4:28:50 PM | Submission request sent to Applicant | 
                
                    | 1/17/2024 4:26:04 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/17/2024 3:08:36 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/17/2024 10:43:50 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 1/10/2024 9:28:07 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 1/8/2024 10:12:02 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 1/3/2024 1:37:42 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Mark Stanwood on behalf of Ellicott Fire Protection District | 
                
                    | 1/3/2024 1:37:40 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Michael Henley on behalf of Ellicott Fire Protection District | 
                
                    | 1/3/2024 1:37:38 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 1/3/2024 1:37:37 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 1/3/2024 1:37:34 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 1/3/2024 1:37:33 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 1/3/2024 1:37:31 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 1/3/2024 1:37:29 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 1/3/2024 1:37:27 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by April Willie on behalf of County Attorney - Water | 
                
                    | 1/3/2024 1:37:23 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/3/2024 1:37:19 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan (Minor) for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/3/2024 1:19:24 PM | Submission Triaged | 
                
                    | 1/3/2024 12:10:39 PM | Submission received from Applicant | 
                
                    | 4/21/2023 5:14:21 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 4/4/2023 9:30:15 AM | Submission request sent to Applicant | 
                
                    | 4/4/2023 9:29:16 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 4/4/2023 9:28:55 AM | Request for Review Comments email resent for Project Viewpoint Estates - Preliminary Plan for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 4/3/2023 9:12:55 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 3/30/2023 7:28:02 AM | Submission request sent to Applicant | 
                
                    | 3/30/2023 7:26:48 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/29/2023 2:54:56 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/29/2023 11:28:14 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 3/29/2023 10:43:13 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Richard Cromwell on behalf of Ellicott Utilities (does area that was Sunset Metro) | 
                
                    | 3/21/2023 8:59:43 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 3/9/2023 1:29:05 PM | Request for Review Comments returned by Ellicott Fire Protection District | 
                
                    | 3/8/2023 12:04:50 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 3/8/2023 10:43:45 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Michael Henley on behalf of Ellicott Fire Protection District | 
                
                    | 3/8/2023 10:43:41 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 3/8/2023 10:43:39 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 3/8/2023 10:43:36 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 3/8/2023 10:43:27 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water | 
                
                    | 3/8/2023 10:43:26 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 3/8/2023 10:43:24 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 3/8/2023 10:40:22 AM | Submission Triaged | 
                
                    | 3/7/2023 9:03:21 AM | Submission received from Applicant | 
                
                    | 1/12/2022 3:44:00 PM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 1/5/2022 6:03:57 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 1/4/2022 3:47:51 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 1/3/2022 8:58:06 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 1/3/2022 8:47:18 AM | Submission request sent to Applicant | 
                
                    | 1/3/2022 8:42:46 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 12/29/2021 12:02:05 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 12/26/2021 4:35:32 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 12/22/2021 3:06:37 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 12/22/2021 10:41:45 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 12/22/2021 10:03:01 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 12/22/2021 7:31:46 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 12/21/2021 12:35:04 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 12/20/2021 12:50:49 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 12/16/2021 3:59:26 PM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Mercedes Rivas on behalf of PCD Project Manager | 
                
                    | 12/6/2021 2:54:24 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 12/6/2021 8:56:12 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 12/3/2021 8:42:00 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 12/2/2021 1:04:51 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 12/2/2021 12:41:57 PM | Request for Review Comments returned by Ellicott Fire Protection District | 
                
                    | 12/2/2021 10:50:47 AM | Request for Review Comments returned by Colorado State Forest Service | 
                
                    | 12/1/2021 11:52:02 AM | Request for Review Comments returned by El Paso County Conservation Dist | 
                
                    | 12/1/2021 10:38:54 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 12/1/2021 10:38:52 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Lisa Johnson on behalf of Ellicott Town Center Metropolitan District | 
                
                    | 12/1/2021 10:38:50 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Chris Smith on behalf of Ellicott SD 22 | 
                
                    | 12/1/2021 10:38:47 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Michael Henley on behalf of Ellicott Fire Protection District | 
                
                    | 12/1/2021 10:38:45 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist | 
                
                    | 12/1/2021 10:38:43 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 12/1/2021 10:38:41 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 12/1/2021 10:38:36 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 12/1/2021 10:38:33 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service | 
                
                    | 12/1/2021 10:38:30 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 12/1/2021 10:38:18 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 12/1/2021 10:38:14 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/1/2021 10:38:09 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 12/1/2021 10:37:56 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 12/1/2021 10:37:53 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 12/1/2021 10:37:48 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department | 
                
                    | 12/1/2021 10:37:45 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer | 
                
                    | 12/1/2021 10:37:42 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 12/1/2021 10:37:40 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 12/1/2021 10:37:28 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 12/1/2021 10:37:26 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Edi Anderson on behalf of County Attorney - Water | 
                
                    | 12/1/2021 10:37:23 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 12/1/2021 10:37:20 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Mercedes Rivas on behalf of PCD Project Manager | 
                
                    | 12/1/2021 10:37:17 AM | Request for Review Comments email sent for Project Viewpoint Estates - Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 11/23/2021 9:56:17 AM | Fees paid: 11/23/2021 (Receipt: 1005422) | 
                
                    | 11/22/2021 9:20:42 PM | Project Manager Assigned: Mercedes Rivas | 
                
                    | 11/22/2021 9:20:25 PM | Payment Request sent: 11/22/2021 | 
                
                    | 11/22/2021 9:20:25 PM | File # Assigned: SP215 | 
                
                    | 11/22/2021 9:20:16 PM | Submission Triaged | 
                
                    | 11/19/2021 3:38:27 PM | Submission received from Applicant | 
                
                    | 11/16/2021 4:56:10 PM | Submission request sent to Applicant | 
                
                    | 11/16/2021 4:54:59 PM | Project Manager Assigned: Nina Ruiz | 
                
                    | 8/21/2020 4:50:54 PM | Submission request sent to Applicant | 
                
                    | 8/21/2020 4:38:35 PM | Submission request sent to Applicant | 
                
                    | 4/14/2020 4:21:47 PM | Submission request sent to Applicant | 
                
                    | 4/14/2020 4:06:58 PM | Submission request sent to Applicant | 
                
                    | 4/14/2020 3:11:38 PM | Project Manager Assigned: Gabe Sevigny | 
                
                    | 4/14/2020 3:11:38 PM | EA Assigned: EA19218 | 
                
                    | 4/14/2020 3:11:38 PM | Project Created |