9/1/2021 11:02:49 AM
|
Project Closed
|
9/1/2021 11:02:49 AM
|
Project Approved: 9/1/2021
|
3/15/2021 10:41:58 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/15/2021 4:07:29 PM
|
Submission Triaged
|
3/15/2021 11:56:01 AM
|
Submission received from Applicant
|
3/15/2021 9:31:35 AM
|
Submission request sent to Applicant
|
3/8/2021 9:31:12 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/8/2021 9:29:47 AM
|
Submission Triaged
|
3/3/2021 4:55:19 PM
|
Submission received from Applicant
|
3/3/2021 1:08:36 PM
|
Submission request sent to Applicant
|
2/24/2021 2:49:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/24/2021 2:13:27 PM
|
Submission Triaged
|
2/24/2021 11:06:24 AM
|
Submission received from Applicant
|
2/24/2021 10:49:11 AM
|
Submission request sent to Applicant
|
2/24/2021 7:26:41 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/16/2021 5:16:34 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/15/2021 5:26:27 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/13/2021 11:42:18 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/12/2021 2:48:58 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
1/28/2021 2:24:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/26/2021 7:29:36 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/25/2021 3:54:13 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
1/25/2021 3:54:11 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
1/25/2021 3:54:07 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/25/2021 3:54:05 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by John Green on behalf of PCD Project Manager
|
1/25/2021 3:53:59 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/25/2021 3:44:44 PM
|
Submission Triaged
|
1/22/2021 12:41:33 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/21/2021 12:46:16 PM
|
Submission received from Applicant
|
1/21/2021 10:55:48 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/21/2021 9:15:30 AM
|
Submission request sent to Applicant
|
1/21/2021 9:14:54 AM
|
Submission Triaged
|
1/21/2021 9:13:25 AM
|
Submission Triaged
|
1/20/2021 3:38:50 PM
|
Submission received from Applicant
|
1/20/2021 2:29:38 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/19/2021 9:39:23 PM
|
Submission request sent to Applicant
|
1/19/2021 11:41:32 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/19/2021 8:14:41 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
1/13/2021 3:06:14 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
1/11/2021 8:06:32 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
1/11/2021 7:26:55 AM
|
Submission request sent to Applicant
|
1/8/2021 8:01:37 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/7/2021 11:17:02 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/4/2021 2:31:41 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/4/2021 7:40:41 AM
|
Request for Review Comments returned by Cimarron Hills Fire
|
12/31/2020 2:37:33 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/31/2020 2:06:29 PM
|
Request for Review Comments returned by Parks Advisory Board
|
12/31/2020 2:04:23 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/31/2020 8:16:33 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/30/2020 5:17:29 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
12/30/2020 5:17:27 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
12/30/2020 5:17:25 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Melissa Andrews on behalf of Falcon School District 49
|
12/30/2020 5:17:22 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/30/2020 5:17:20 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Terry Johns on behalf of Colorado Springs SD 11
|
12/30/2020 5:17:11 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
12/30/2020 5:17:09 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
12/30/2020 5:17:07 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
12/30/2020 5:17:05 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
12/30/2020 5:17:02 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
12/30/2020 5:17:00 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Autumn Mason on behalf of Central Marksheffel Metro
|
12/30/2020 5:16:58 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Pamela Davidson on behalf of Central CO Conservation District
|
12/30/2020 5:16:56 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/30/2020 5:16:54 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/30/2020 5:16:52 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/30/2020 5:16:50 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Elaine Kelly on behalf of US Postal Service
|
12/30/2020 5:16:48 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/30/2020 5:16:46 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/30/2020 5:16:44 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/30/2020 5:16:38 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/30/2020 5:16:32 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
12/30/2020 5:16:26 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by on behalf of Parks Advisory Board
|
12/30/2020 5:16:22 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/30/2020 5:16:20 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/30/2020 5:16:18 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
12/30/2020 5:16:16 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by on behalf of EPC Parks Department
|
12/30/2020 5:16:11 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by on behalf of EPC Health Department
|
12/30/2020 5:16:05 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/30/2020 5:16:03 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/30/2020 5:16:00 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by John Green on behalf of PCD Project Manager
|
12/30/2020 5:15:55 PM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/27/2020 1:50:03 PM
|
Project Manager Assigned: John Green
|
12/11/2020 10:57:36 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/10/2020 11:46:13 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/9/2020 1:23:32 PM
|
Submission Triaged
|
12/9/2020 12:46:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/9/2020 10:50:45 AM
|
Submission received from Applicant
|
12/8/2020 4:13:59 PM
|
Submission request sent to Applicant
|
12/8/2020 12:28:20 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/8/2020 12:23:21 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/25/2020 9:51:58 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
11/25/2020 9:51:54 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/25/2020 9:51:52 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
11/25/2020 9:51:50 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
11/25/2020 9:51:44 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/25/2020 9:49:24 AM
|
Submission Triaged
|
11/23/2020 3:08:34 PM
|
Submission received from Applicant
|
10/22/2020 12:25:42 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
10/16/2020 9:52:51 AM
|
Submission request sent to Applicant
|
10/16/2020 9:47:04 AM
|
Request for Review Comments returned by PCD Project Manager
|
10/14/2020 3:33:28 PM
|
Request for Review Comments email resent for Project Claremont Business Park 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
10/9/2020 10:00:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/9/2020 1:47:33 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/8/2020 9:45:33 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
10/7/2020 9:21:22 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/6/2020 9:44:42 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/28/2020 4:44:54 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/25/2020 4:05:10 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/22/2020 11:17:19 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
9/21/2020 10:50:30 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
9/21/2020 10:50:28 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/21/2020 10:50:21 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
9/21/2020 10:50:15 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
9/21/2020 10:50:13 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/21/2020 10:50:11 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/21/2020 10:50:07 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/21/2020 10:50:05 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
9/21/2020 10:50:00 AM
|
Request for Review Comments email sent for Project Claremont Business Park 2 Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/18/2020 4:56:15 PM
|
Submission Triaged
|
9/17/2020 10:06:57 AM
|
Submission received from Applicant
|
8/12/2020 10:56:56 AM
|
Submission request sent to Applicant
|
7/27/2020 10:14:21 AM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
7/23/2020 4:59:34 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
7/23/2020 2:31:26 PM
|
Request for Review Comments email resent for Project Claremont Business Park 2 Filing 1 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
7/20/2020 2:48:09 PM
|
Request for Review Comments returned by Colorado Springs Public Works
|
7/17/2020 2:25:05 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/17/2020 2:24:22 PM
|
Request for Review Comments email resent for Project Claremont Business Park 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
7/17/2020 11:03:31 AM
|
Submission request sent to Applicant
|
7/17/2020 10:48:30 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/17/2020 10:38:06 AM
|
Request for Review Comments email resent for Project Claremont Business Park 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
7/17/2020 7:21:23 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
7/16/2020 9:51:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/16/2020 3:49:59 PM
|
Request for Review Comments returned by Parks Advisory Board
|
7/16/2020 3:48:53 PM
|
Request for Review Comments returned by EPC Parks Department
|
7/16/2020 12:19:19 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/16/2020 11:02:43 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/16/2020 9:11:15 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/14/2020 3:34:09 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/14/2020 10:59:30 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/9/2020 1:11:48 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
7/7/2020 12:58:52 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/7/2020 9:23:05 AM
|
Request for Review Comments email resent for Project Claremont Business Park 2 Filing 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/7/2020 8:43:21 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
7/3/2020 9:56:26 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/2/2020 7:33:37 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
6/29/2020 2:56:13 PM
|
Request for Review Comments returned by EPC Environmental Services
|
6/26/2020 8:48:13 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
6/26/2020 8:48:12 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
6/26/2020 8:48:11 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Melissa Andrews on behalf of Falcon School District 49
|
6/26/2020 8:48:11 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/26/2020 8:48:10 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Terry Johns on behalf of Colorado Springs SD 11
|
6/26/2020 8:48:09 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Shirley Applegate on behalf of Colorado Springs Public Works
|
6/26/2020 8:48:08 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
6/26/2020 8:48:07 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
6/26/2020 8:48:06 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Division Chief John McLeod on behalf of Cimarron Hills Fire
|
6/26/2020 8:48:05 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Jeff Munger on behalf of Cherokee Metro Dist
|
6/26/2020 8:48:04 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Autumn Mason on behalf of Central Marksheffel Metro
|
6/26/2020 8:48:03 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Pamela Davidson on behalf of Central CO Conservation District
|
6/26/2020 8:48:02 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
6/26/2020 8:48:01 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
6/26/2020 8:48:00 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
6/26/2020 8:47:59 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Elaine Kelly on behalf of US Postal Service
|
6/26/2020 8:47:58 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
6/26/2020 8:47:57 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
6/26/2020 8:47:56 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/26/2020 8:47:55 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/26/2020 8:47:54 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
6/26/2020 8:47:52 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by on behalf of Parks Advisory Board
|
6/26/2020 8:47:51 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
6/26/2020 8:47:50 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
6/26/2020 8:47:49 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
6/26/2020 8:47:48 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by on behalf of EPC Parks Department
|
6/26/2020 8:47:47 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by on behalf of EPC Health Department
|
6/26/2020 8:47:44 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
6/26/2020 8:47:43 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
6/26/2020 8:47:42 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Lindsay Darden on behalf of PCD Project Manager
|
6/26/2020 8:47:41 AM
|
Request for Review Comments email sent for Project Claremont 2 Filing 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/17/2020 1:51:06 PM
|
Fees paid: 6/17/2020 (Receipt: 1002866)
|
6/17/2020 1:22:44 PM
|
Payment Request sent: 6/17/2020
|
6/17/2020 1:22:44 PM
|
File # Assigned: SF2014
|
6/17/2020 1:22:38 PM
|
Submission Triaged
|
6/17/2020 12:27:45 PM
|
Submission received from Applicant
|
6/17/2020 12:18:25 PM
|
Submission request sent to Applicant
|
6/17/2020 12:18:11 PM
|
Submission Triaged
|
6/17/2020 11:23:13 AM
|
Submission received from Applicant
|
3/4/2020 5:16:10 PM
|
Submission request sent to Applicant
|
3/4/2020 5:04:34 PM
|
Project Manager Assigned: Lindsay Darden
|
3/4/2020 5:04:34 PM
|
EA Assigned: EA19107
|
3/4/2020 5:04:34 PM
|
Project Created
|