5/17/2022 10:32:28 AM
|
Project Closed
|
5/17/2022 10:32:28 AM
|
Project Approved: 5/17/2022
|
5/13/2022 10:36:55 AM
|
Project Manager Assigned: Kari Parsons
|
5/3/2022 5:15:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/3/2022 1:26:07 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/28/2022 4:07:49 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Edi Anderson on behalf of County Attorney - Water
|
4/23/2022 7:06:00 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Nina Ruiz on behalf of PCD Project Manager
|
4/23/2022 7:05:58 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/23/2022 7:04:43 PM
|
Submission Triaged
|
4/22/2022 10:50:08 PM
|
Submission received from Applicant
|
4/22/2022 8:24:19 PM
|
Submission request sent to Applicant
|
4/22/2022 8:24:08 PM
|
Submission Triaged
|
4/21/2022 8:25:02 PM
|
Submission received from Applicant
|
4/12/2022 1:44:30 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/11/2022 12:43:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/11/2022 12:42:12 PM
|
Submission request sent to Applicant
|
4/8/2022 4:48:40 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/8/2022 1:55:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/1/2022 9:31:12 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/20/2022 8:54:42 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/20/2022 8:52:54 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/20/2022 8:52:48 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Edi Anderson on behalf of County Attorney - Water
|
3/20/2022 8:52:46 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Nina Ruiz on behalf of PCD Project Manager
|
3/20/2022 8:52:40 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/20/2022 8:51:06 PM
|
Submission Triaged
|
3/17/2022 3:05:51 PM
|
Submission received from Applicant
|
3/4/2022 11:54:38 AM
|
Submission request sent to Applicant
|
3/2/2022 3:28:57 PM
|
Submission request sent to Applicant
|
3/2/2022 3:25:14 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/23/2022 1:40:40 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
2/22/2022 6:59:15 PM
|
Submission request sent to Applicant
|
2/22/2022 6:58:16 PM
|
Submission request sent to Applicant
|
2/21/2022 9:33:33 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/17/2022 11:34:54 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/16/2022 9:08:01 PM
|
Submission request sent to Applicant
|
2/16/2022 2:47:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/3/2022 3:07:48 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/3/2022 1:01:40 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jeff Munger on behalf of Cherokee Metro Dist
|
2/3/2022 1:01:36 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
2/3/2022 1:01:34 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/3/2022 1:01:28 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Edi Anderson on behalf of County Attorney - Water
|
2/3/2022 1:01:25 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Nina Ruiz on behalf of PCD Project Manager
|
2/3/2022 1:01:21 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/3/2022 12:58:50 PM
|
Submission Triaged
|
2/3/2022 12:01:13 PM
|
Submission received from Applicant
|
1/26/2022 11:15:40 AM
|
Submission request sent to Applicant
|
1/26/2022 11:12:24 AM
|
Request for Review Comments returned by PCD Project Manager
|
1/26/2022 11:11:54 AM
|
Submission request sent to Applicant
|
1/12/2022 3:00:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/10/2022 4:28:56 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
1/10/2022 3:30:44 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/10/2022 11:38:26 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/4/2022 6:25:06 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/28/2021 1:47:07 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/23/2021 10:27:17 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
12/20/2021 8:13:28 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jeff Munger on behalf of Cherokee Metro Dist
|
12/20/2021 8:13:26 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/20/2021 8:13:24 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/20/2021 8:13:20 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/20/2021 8:11:34 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Nina Ruiz on behalf of PCD Project Manager
|
12/20/2021 8:11:27 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/20/2021 8:10:17 PM
|
Submission Triaged
|
12/20/2021 4:39:57 PM
|
Submission received from Applicant
|
12/9/2021 4:26:21 PM
|
Submission request sent to Applicant
|
12/9/2021 4:18:23 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/7/2021 4:34:38 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/6/2021 8:57:58 AM
|
Project Manager Assigned: Nina Ruiz
|
12/3/2021 2:40:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/1/2021 10:51:59 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/30/2021 2:51:46 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/23/2021 1:11:24 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/22/2021 3:22:55 PM
|
Request for Review Comments returned by Cherokee Metro Dist
|
11/22/2021 2:03:26 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
11/19/2021 2:23:35 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/17/2021 4:24:18 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
11/17/2021 12:47:57 PM
|
Request for Review Comments returned by US Postal Service
|
11/17/2021 9:02:38 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/16/2021 9:37:51 AM
|
Request for Review Comments returned by Parks Advisory Board
|
11/16/2021 9:36:39 AM
|
Request for Review Comments returned by EPC Parks Department
|
11/10/2021 11:58:30 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
11/5/2021 2:23:23 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/5/2021 1:59:21 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/5/2021 1:57:26 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/4/2021 4:52:24 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Mr. Michael Shafer on behalf of Peterson AFB
|
11/4/2021 4:52:22 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
|
11/4/2021 4:52:20 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
11/4/2021 4:52:18 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Melissa Andrews on behalf of Falcon School District 49
|
11/4/2021 4:52:15 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
11/4/2021 4:52:11 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Pamela Davis on behalf of El Paso County Conservation Dist
|
11/4/2021 4:52:09 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Peter Susemilh on behalf of Constitution Heights Metro
|
11/4/2021 4:52:07 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
11/4/2021 4:52:05 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
11/4/2021 4:51:56 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
11/4/2021 4:51:54 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jeff Munger on behalf of Cherokee Metro Dist
|
11/4/2021 4:51:52 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Susan Davies on behalf of Trails and Open Space Coalition
|
11/4/2021 4:51:50 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/4/2021 4:51:48 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
11/4/2021 4:51:46 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elaine Kelly on behalf of US Postal Service
|
11/4/2021 4:51:44 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
11/4/2021 4:51:40 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
11/4/2021 4:51:34 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/4/2021 4:51:32 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of Parks Advisory Board
|
11/4/2021 4:51:29 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/4/2021 4:51:27 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
11/4/2021 4:51:25 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
11/4/2021 4:51:23 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of EPC Parks Department
|
11/4/2021 4:51:18 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of EPC Health Department
|
11/4/2021 4:51:12 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/4/2021 4:51:10 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Edi Anderson on behalf of County Attorney - Water
|
11/4/2021 4:51:08 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Lori Seago on behalf of County Attorney - Development Review
|
11/4/2021 4:51:05 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kari Parsons on behalf of PCD Project Manager
|
11/4/2021 4:51:01 PM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/4/2021 4:38:44 PM
|
Submission Triaged
|
11/4/2021 4:27:34 PM
|
Submission received from Applicant
|
11/4/2021 12:47:12 PM
|
Submission request sent to Applicant
|
11/4/2021 12:46:57 PM
|
Submission Triaged
|
11/4/2021 11:02:16 AM
|
Submission received from Applicant
|
10/28/2021 9:39:22 AM
|
Submission request sent to Applicant
|
10/28/2021 9:39:00 AM
|
Submission Triaged
|
10/26/2021 10:18:21 AM
|
Submission received from Applicant
|
10/11/2020 7:00:00 PM
|
Request for Review Comments returned by EPC Health Department
|
10/2/2020 1:44:00 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/2/2020 9:46:33 AM
|
Submission request sent to Applicant
|
10/2/2020 9:45:55 AM
|
Submission request sent to Applicant
|
10/2/2020 9:44:55 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/30/2020 11:42:27 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/29/2020 3:31:36 PM
|
Request for Review Comments returned by US Postal Service
|
9/20/2020 1:22:36 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/17/2020 2:40:15 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
9/16/2020 10:24:38 AM
|
Request for Review Comments returned by Cherokee Metro Dist
|
9/15/2020 9:56:18 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/15/2020 9:16:44 AM
|
Request for Review Comments returned by Parks Advisory Board
|
9/15/2020 9:00:56 AM
|
Request for Review Comments returned by EPC Parks Department
|
9/4/2020 8:39:40 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
9/3/2020 10:04:25 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
8/31/2020 12:17:51 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/27/2020 1:35:19 PM
|
Request for Review Comments returned by EPC Environmental Services
|
8/27/2020 7:53:36 AM
|
Request for Review Comments returned by County Attorney - Water
|
8/27/2020 7:24:24 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Mr. Michael Shafer on behalf of Peterson AFB
|
8/27/2020 7:24:22 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency)
|
8/27/2020 7:24:20 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
8/27/2020 7:24:19 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Melissa Andrews on behalf of Falcon School District 49
|
8/27/2020 7:24:18 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
|
8/27/2020 7:24:17 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Pamela Davis on behalf of El Paso County Conservation Dist
|
8/27/2020 7:24:15 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Peter Susemilh on behalf of Constitution Heights Metro
|
8/27/2020 7:24:14 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/27/2020 7:24:13 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Carl Schueler on behalf of Colorado Springs Planning & Community Development
|
8/27/2020 7:24:11 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
8/27/2020 7:24:10 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jeff Munger on behalf of Cherokee Metro Dist
|
8/27/2020 7:24:09 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Susan Davies on behalf of Trails and Open Space Coalition
|
8/27/2020 7:24:08 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
8/27/2020 7:24:07 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/27/2020 7:24:06 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elaine Kelly on behalf of US Postal Service
|
8/27/2020 7:24:05 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
8/27/2020 7:24:04 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/27/2020 7:24:02 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/27/2020 7:24:01 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of Parks Advisory Board
|
8/27/2020 7:24:00 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
8/27/2020 7:23:59 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
8/27/2020 7:23:58 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of EPC Parks Department
|
8/27/2020 7:23:57 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by on behalf of EPC Health Department
|
8/27/2020 7:23:54 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kathy Andrew on behalf of EPC Environmental Services
|
8/27/2020 7:23:53 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Edi Anderson on behalf of County Attorney - Water
|
8/27/2020 7:23:52 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Kari Parsons on behalf of PCD Project Manager
|
8/27/2020 7:23:51 AM
|
Request for Review Comments email sent for Project Midtown at Hanna Ridge Fil No 3( East) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
8/27/2020 7:22:04 AM
|
Fees paid: 8/27/2020 (Receipt: 1003168)
|
8/25/2020 5:25:24 PM
|
Payment Request sent: 8/25/2020
|
8/25/2020 5:25:24 PM
|
File # Assigned: PUDSP207
|
8/25/2020 5:25:21 PM
|
Submission Triaged
|
8/25/2020 10:52:04 AM
|
Submission received from Applicant
|
8/25/2020 7:22:50 AM
|
Submission request sent to Applicant
|
8/25/2020 7:22:23 AM
|
Submission Triaged
|
8/21/2020 3:44:23 PM
|
Submission received from Applicant
|
7/8/2020 7:34:59 AM
|
Submission request sent to Applicant
|
12/9/2019 11:37:15 AM
|
Submission request sent to Applicant
|
12/9/2019 9:46:31 AM
|
Project Manager Assigned: Kari Parsons
|
12/9/2019 9:46:31 AM
|
EA Assigned: EA19234
|
12/9/2019 9:46:31 AM
|
Project Created
|