9/4/2024 12:00:09 PM
|
Project Closed
|
9/4/2024 12:00:09 PM
|
Project Approved: 9/4/2024
|
9/4/2024 12:00:02 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
8/29/2024 12:28:28 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/22/2024 11:38:51 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
8/22/2024 11:38:49 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Erika Keech on behalf of County Attorney - Development Review
|
8/22/2024 11:38:47 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by April Willie on behalf of County Attorney - Development Review
|
8/22/2024 11:36:18 AM
|
Submission Triaged
|
8/22/2024 9:43:06 AM
|
Submission received from Applicant
|
8/8/2024 3:34:46 PM
|
Submission request sent to Applicant
|
7/28/2024 3:23:05 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/24/2024 4:39:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/18/2024 10:01:07 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/18/2024 10:01:06 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
|
7/18/2024 9:55:05 AM
|
Submission Triaged
|
7/16/2024 3:44:16 PM
|
Submission received from Applicant
|
7/12/2024 11:01:04 AM
|
Submission request sent to Applicant
|
7/12/2024 10:59:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/12/2024 10:57:02 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
7/12/2024 10:57:00 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Erika Keech on behalf of County Attorney - Development Review
|
7/12/2024 10:56:58 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by April Willie on behalf of County Attorney - Development Review
|
7/11/2024 5:14:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/10/2024 2:52:19 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/28/2024 7:58:16 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/28/2024 7:58:15 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/28/2024 7:58:13 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/28/2024 7:58:11 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Christina Prete on behalf of EPC Stormwater Review
|
6/28/2024 7:58:09 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kari Parsons on behalf of PCD Project Manager
|
6/28/2024 7:58:05 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/28/2024 7:58:03 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
|
6/27/2024 3:16:41 PM
|
Submission Triaged
|
6/27/2024 2:21:25 PM
|
Submission received from Applicant
|
5/22/2024 3:51:54 PM
|
Submission request sent to Applicant
|
5/22/2024 3:24:05 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/22/2024 2:33:08 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/8/2024 11:51:27 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/8/2024 11:51:26 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/8/2024 11:51:24 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/8/2024 11:51:22 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Christina Prete on behalf of EPC Stormwater Review
|
5/8/2024 11:51:18 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/8/2024 11:51:16 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
|
5/8/2024 11:50:09 AM
|
Submission Triaged
|
5/8/2024 10:51:20 AM
|
Submission received from Applicant
|
5/6/2024 1:50:05 PM
|
Submission request sent to Applicant
|
5/2/2024 10:22:48 AM
|
Project reopened for Review Comments
|
2/27/2024 11:33:01 AM
|
Submission request sent to Applicant
|
1/13/2023 2:13:37 PM
|
Project Closed
|
1/13/2023 2:13:37 PM
|
Project Approved: 1/13/2023
|
1/13/2023 2:13:25 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
1/10/2023 2:03:50 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/29/2022 2:27:41 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/29/2022 12:46:20 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/29/2022 9:19:39 AM
|
Submission request sent to Applicant
|
12/29/2022 9:14:19 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/27/2022 3:39:51 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/18/2022 11:42:02 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/13/2022 11:03:00 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/13/2022 11:02:58 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
12/13/2022 11:02:52 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Ashlyn Mathy on behalf of PCD Project Manager
|
12/13/2022 11:02:49 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/12/2022 11:09:01 AM
|
Fees paid: 12/12/2022 (Receipt: 1007274)
|
12/12/2022 10:03:24 AM
|
Project Manager Assigned: Ashlyn Mathy
|
11/7/2022 9:39:01 AM
|
Submission Triaged
|
11/3/2022 5:58:27 PM
|
Submission received from Applicant
|
4/25/2022 9:48:44 AM
|
Submission request sent to Applicant
|
4/24/2022 2:48:57 PM
|
Request for Review Comments returned by EPC Health Department
|
3/30/2022 10:08:00 AM
|
Submission request sent to Applicant
|
3/30/2022 10:07:34 AM
|
Payment Request sent: 3/30/2022
|
3/30/2022 10:06:21 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/30/2022 10:04:49 AM
|
Request for Review Comments email resent for Project Araco Enterprises SDP for review by Kylie Bagley on behalf of PCD Project Manager
|
3/29/2022 5:28:58 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/29/2022 2:21:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/28/2022 11:26:58 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/24/2022 2:35:18 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/10/2022 3:26:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/9/2022 11:27:42 AM
|
Request for Review Comments returned by Fountain
|
3/7/2022 3:01:49 PM
|
Submission request sent to Applicant
|
3/7/2022 9:41:57 AM
|
Request for Review Comments returned by RBD Floodplain
|
3/7/2022 8:37:48 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Travis Jones on behalf of Widefield Water & San
|
3/7/2022 8:37:46 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
|
3/7/2022 8:37:44 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
|
3/7/2022 8:37:41 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
|
3/7/2022 8:37:39 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
3/7/2022 8:37:37 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
|
3/7/2022 8:37:35 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/7/2022 8:37:29 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
3/7/2022 8:37:20 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/7/2022 8:37:14 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
|
3/7/2022 8:37:08 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
3/7/2022 8:37:03 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kylie Bagley on behalf of PCD Project Manager
|
3/7/2022 8:36:57 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/7/2022 8:10:06 AM
|
Submission Triaged
|
3/7/2022 7:41:48 AM
|
Submission received from Applicant
|
1/4/2022 3:28:23 PM
|
Project Manager Assigned: Kylie Bagley
|
12/14/2021 10:08:55 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
12/6/2021 7:44:51 AM
|
Submission request sent to Applicant
|
12/6/2021 7:42:51 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/6/2021 7:39:25 AM
|
Request for Review Comments email resent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/3/2021 2:21:04 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/3/2021 9:36:16 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/2/2021 4:40:44 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/2/2021 7:19:18 AM
|
Request for Review Comments email resent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/2/2021 7:16:05 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/1/2021 5:33:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/30/2021 8:49:08 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/12/2021 11:08:12 AM
|
Request for Review Comments returned by Fountain
|
11/10/2021 12:30:51 PM
|
Request for Review Comments returned by RBD Floodplain
|
11/10/2021 12:13:57 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
|
11/10/2021 12:13:55 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
|
11/10/2021 12:13:53 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
|
11/10/2021 12:13:51 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
|
11/10/2021 12:13:49 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/10/2021 12:13:46 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
|
11/10/2021 12:13:44 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/10/2021 12:13:38 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
11/10/2021 12:13:30 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
11/10/2021 12:13:26 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
|
11/10/2021 12:13:20 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
11/10/2021 12:13:16 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
|
11/10/2021 12:13:10 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/10/2021 11:03:13 AM
|
Project Manager Assigned: Mercedes Rivas
|
11/9/2021 3:11:10 PM
|
Project Manager Assigned: Ryan Howser
|
11/9/2021 3:10:22 PM
|
Submission Triaged
|
11/8/2021 8:17:40 PM
|
Submission received from Applicant
|
6/10/2021 5:03:41 PM
|
Project Manager Assigned: Nina Ruiz
|
5/18/2021 7:35:02 AM
|
Submission request sent to Applicant
|
5/17/2021 10:57:55 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/14/2021 2:11:22 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/14/2021 2:06:04 PM
|
Request for Review Comments email resent for Project Araco Enterprises SDP for review by Sophie Kiepe on behalf of PCD Project Manager
|
5/13/2021 4:32:24 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/5/2021 4:43:58 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/5/2021 11:03:06 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/5/2021 10:18:37 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/5/2021 9:38:57 AM
|
Submission Triaged
|
5/4/2021 3:29:36 PM
|
Submission received from Applicant
|
5/4/2021 12:17:14 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/15/2021 4:47:53 PM
|
Submission request sent to Applicant
|
4/15/2021 4:44:04 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
4/15/2021 4:44:00 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
4/15/2021 4:43:58 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
4/15/2021 4:43:56 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Sophie Kiepe on behalf of PCD Project Manager
|
4/15/2021 4:39:00 PM
|
Submission Triaged
|
4/14/2021 2:00:06 PM
|
Submission received from Applicant
|
12/7/2020 11:23:45 AM
|
Project Manager Assigned: Sophie Kiepe
|
9/9/2020 1:40:46 PM
|
Request for Review Comments returned by EPC Health Department
|
8/31/2020 7:55:54 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/28/2020 11:25:44 AM
|
Submission request sent to Applicant
|
8/28/2020 11:20:01 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/27/2020 9:51:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/27/2020 8:52:32 AM
|
Request for Review Comments returned by Fountain
|
8/25/2020 3:19:55 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/24/2020 5:36:56 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
8/20/2020 10:48:47 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
8/13/2020 8:58:11 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/31/2020 8:58:41 AM
|
Request for Review Comments returned by RBD Floodplain
|
7/31/2020 7:31:41 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
|
7/31/2020 7:31:41 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
|
7/31/2020 7:31:40 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
|
7/31/2020 7:31:39 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
|
7/31/2020 7:31:38 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/31/2020 7:31:37 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
|
7/31/2020 7:31:36 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
7/31/2020 7:31:35 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
7/31/2020 7:31:32 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
|
7/31/2020 7:31:30 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
7/31/2020 7:31:29 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Rad Dickson on behalf of PCD Project Manager
|
7/31/2020 7:31:27 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/31/2020 7:30:32 AM
|
Submission Triaged
|
7/29/2020 2:50:34 PM
|
Submission received from Applicant
|
7/29/2020 2:24:23 PM
|
Submission request sent to Applicant
|
7/29/2020 2:23:54 PM
|
Submission request sent to Applicant
|
7/29/2020 2:23:30 PM
|
Submission Triaged
|
7/29/2020 8:38:12 AM
|
Submission received from Applicant
|
7/8/2020 12:39:27 PM
|
Project Manager Assigned: Rad Dickson
|
1/30/2020 11:36:30 AM
|
Request for Review Comments returned by EPC Health Department
|
12/17/2019 12:03:09 PM
|
Submission request sent to Applicant
|
12/17/2019 12:00:26 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/17/2019 11:59:49 AM
|
Request for Review Comments email resent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
|
12/17/2019 11:52:42 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/13/2019 9:42:20 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/5/2019 8:33:44 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/3/2019 8:16:24 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
|
12/3/2019 8:16:23 AM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/2/2019 2:17:06 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/14/2019 4:00:33 PM
|
Request for Review Comments returned by RBD Floodplain
|
11/14/2019 3:41:09 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
|
11/14/2019 3:41:06 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
|
11/14/2019 3:41:02 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
|
11/14/2019 3:40:58 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
|
11/14/2019 3:40:54 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
11/14/2019 3:40:50 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
|
11/14/2019 3:40:47 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
11/14/2019 3:40:43 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
|
11/14/2019 3:40:32 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
|
11/14/2019 3:40:28 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
|
11/14/2019 3:40:25 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
|
11/14/2019 3:40:21 PM
|
Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/14/2019 2:40:20 PM
|
Fees paid: 11/14/2019 (Receipt: 1002026)
|
11/14/2019 10:54:22 AM
|
Payment Request sent: 11/14/2019
|
11/14/2019 10:54:15 AM
|
File # Assigned: PPR1950
|
11/14/2019 8:50:38 AM
|
Submission Triaged
|
11/14/2019 7:37:07 AM
|
Submission received from Applicant
|
11/13/2019 3:51:00 PM
|
Submission request sent to Applicant
|
11/13/2019 3:48:36 PM
|
Submission Triaged
|
11/13/2019 12:29:28 PM
|
Submission received from Applicant
|
11/12/2019 4:55:53 PM
|
Submission request sent to Applicant
|
10/29/2019 7:53:26 AM
|
Submission request sent to Applicant
|
10/28/2019 4:48:30 PM
|
Submission request sent to Applicant
|
10/28/2019 4:38:56 PM
|
Project Manager Assigned: Gabe Sevigny
|
10/28/2019 4:38:56 PM
|
Project Created
|