Project Details

Search


File Number
PPR1950
Project Name
Araco Enterprises SDP
Description
A request for a Site Development Plan
Location
7470 Southmoor Drive
Parcels
6524400085 6524400085
Applicant
Araco Concrete Contractor, LLC
Arturo Acosta ( arturo@aracoconcrete.com )
(719) 459-3360
Arturo Acosta ( arturo@aracoconcrete.com )
(719) 459-3360
File Prefix
PPR - Plot Plan Review
Year
2019
Project Manager
Remove Ashlyn Mathy
Status
Closed
Created
10/28/2019 4:38:48 PM

View: Review Comments


Approved Documents (12)

Link Document
View Grading & Erosion Control checklist
View MS4 Post Construction Form
View PBMP Applicability Form
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)
View SWMP checklist
View Grading & Erosion Control Plan
View Site Development Plan
View Drainage Report - Final
View Traffic Impact Study
View Detention Maintenance Agreement (MS WORD version required - attachments included)
View Final Drainage Report addendum - “Addendum associated with Delta Revision G”
View GEC Plan - “Delta Revision G: Delete Pond A2”


Additional Documents (2)

Link Document Comment
View Signed Esqcp
View Recorded Documents - Private Detention Basin/Stormwater Quality Best Mgmnt Practice Maintenance Agreement and Easement - 224070038


Review Documents (35)

Link Document Date
View Application/Petition Form 1/28/2021 2:28:50 PM
View Legal Description (MS WORD Version required) 11/13/2019 12:10:26 PM
View Letter of Intent 11/3/2022 5:56:22 PM
View Title Commitment (Current within 30 days of submittal) 11/13/2019 11:51:27 AM
View Vicinity/Location Map 11/13/2019 11:51:28 AM
View Driveway Permit 11/13/2019 11:51:29 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 9/2/2021 3:52:46 PM
View Grading & Erosion Control checklist 5/8/2024 10:50:56 AM
View MS4 Post Construction Form 6/17/2024 2:53:37 PM
View PBMP Applicability Form 8/31/2021 10:43:28 AM
View PDB/BMP Operations & Maintenance Manual 7/22/2020 5:10:41 PM
View Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet) 6/17/2024 2:53:37 PM
View SWMP checklist 1/25/2021 3:30:58 PM
View Grading & Erosion Control Plan 6/27/2024 2:20:34 PM
View Landscape Plan drawings 7/23/2020 9:43:26 AM
View Sign Plan 11/13/2019 11:51:26 AM
View Site Development Plan 6/27/2024 2:20:36 PM
View Storm Water Management Plan (SWMP) 1/25/2021 3:30:57 PM
View Fire Commitment Letter 11/14/2019 7:36:32 AM
View Drainage Report - Final 7/16/2024 3:43:41 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 8/22/2024 9:42:49 AM
View Approved Non-Jurisdictional Impoundment Notices 11/3/2022 4:27:14 PM
View Deviation Request Form 4/27/2022 2:18:15 PM
View Elevation Plans 1/28/2021 1:44:06 PM
View Final Drainage Report addendum - “Addendum associated with Delta Revision G” 7/24/2024 1:15:10 PM
View Financial Assurance Forms 9/2/2021 3:52:45 PM
View Floor Plans (24" x 36") 1/28/2021 1:44:06 PM
View GEC Plan - “Delta Revision G: Delete Pond A2” 7/24/2024 1:15:11 PM
View GEC Plans 11/3/2022 4:58:29 PM
View Letter of Intent notation acceptance Email 11/3/2022 5:56:23 PM
View Lighting Plan 7/23/2020 9:37:58 AM
View PBMP Agreement 11/3/2022 4:25:54 PM
View Redline of Page 2 of the TIS report 4/27/2022 2:55:15 PM
View TIS REPORT w/ minor revision (rev. 4-27-22) 4/27/2022 2:55:16 PM
View Traffic Memo 3/7/2022 7:36:09 AM



Events (210)

Date Comment
9/4/2024 12:00:09 PM Project Closed
9/4/2024 12:00:09 PM Project Approved: 9/4/2024
9/4/2024 12:00:02 PM Project Ready for Approval requests. Review Comment period is complete.
8/29/2024 12:28:28 PM Request for Review Comments returned by County Attorney - Development Review
8/22/2024 11:38:51 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
8/22/2024 11:38:49 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Erika Keech on behalf of County Attorney - Development Review
8/22/2024 11:38:47 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by April Willie on behalf of County Attorney - Development Review
8/22/2024 11:36:18 AM Submission Triaged
8/22/2024 9:43:06 AM Submission received from Applicant
8/8/2024 3:34:46 PM Submission request sent to Applicant
7/28/2024 3:23:05 PM Request for Review Comments returned by County Attorney - Development Review
7/24/2024 4:39:00 PM Request for Review Comments returned by PCD Engineering Division
7/18/2024 10:01:07 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
7/18/2024 10:01:06 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
7/18/2024 9:55:05 AM Submission Triaged
7/16/2024 3:44:16 PM Submission received from Applicant
7/12/2024 11:01:04 AM Submission request sent to Applicant
7/12/2024 10:59:54 AM Request for Review Comments returned by PCD Project Manager
7/12/2024 10:57:02 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
7/12/2024 10:57:00 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Erika Keech on behalf of County Attorney - Development Review
7/12/2024 10:56:58 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by April Willie on behalf of County Attorney - Development Review
7/11/2024 5:14:42 PM Request for Review Comments returned by PCD Engineering Division
7/10/2024 2:52:19 PM Request for Review Comments returned by EPC Stormwater Review
6/28/2024 7:58:16 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Shannon Mustoe on behalf of EPC Stormwater Review
6/28/2024 7:58:15 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mikayla Hartford on behalf of EPC Stormwater Review
6/28/2024 7:58:13 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Glenn Reese on behalf of EPC Stormwater Review
6/28/2024 7:58:11 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Christina Prete on behalf of EPC Stormwater Review
6/28/2024 7:58:09 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kari Parsons on behalf of PCD Project Manager
6/28/2024 7:58:05 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
6/28/2024 7:58:03 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
6/27/2024 3:16:41 PM Submission Triaged
6/27/2024 2:21:25 PM Submission received from Applicant
5/22/2024 3:51:54 PM Submission request sent to Applicant
5/22/2024 3:24:05 PM Request for Review Comments returned by EPC Stormwater Review
5/22/2024 2:33:08 PM Request for Review Comments returned by PCD Engineering Division
5/8/2024 11:51:27 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Shannon Mustoe on behalf of EPC Stormwater Review
5/8/2024 11:51:26 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mikayla Hartford on behalf of EPC Stormwater Review
5/8/2024 11:51:24 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Glenn Reese on behalf of EPC Stormwater Review
5/8/2024 11:51:22 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Christina Prete on behalf of EPC Stormwater Review
5/8/2024 11:51:18 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gilbert LaForce on behalf of PCD Engineering Division
5/8/2024 11:51:16 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Engineering Manager on behalf of PCD Engineering Division
5/8/2024 11:50:09 AM Submission Triaged
5/8/2024 10:51:20 AM Submission received from Applicant
5/6/2024 1:50:05 PM Submission request sent to Applicant
5/2/2024 10:22:48 AM Project reopened for Review Comments
2/27/2024 11:33:01 AM Submission request sent to Applicant
1/13/2023 2:13:37 PM Project Closed
1/13/2023 2:13:37 PM Project Approved: 1/13/2023
1/13/2023 2:13:25 PM Project Ready for Approval requests. Review Comment period is complete.
1/10/2023 2:03:50 PM Request for Review Comments returned by County Attorney - Development Review
12/29/2022 2:27:41 PM Request for Review Comments returned by PCD Engineering Division
12/29/2022 12:46:20 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/29/2022 9:19:39 AM Submission request sent to Applicant
12/29/2022 9:14:19 AM Request for Review Comments returned by PCD Project Manager
12/27/2022 3:39:51 PM Request for Review Comments returned by PCD Engineering Division
12/18/2022 11:42:02 AM Request for Review Comments returned by EPC Stormwater Review
12/13/2022 11:03:00 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
12/13/2022 11:02:58 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
12/13/2022 11:02:52 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Ashlyn Mathy on behalf of PCD Project Manager
12/13/2022 11:02:49 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/12/2022 11:09:01 AM Fees paid: 12/12/2022 (Receipt: 1007274)
12/12/2022 10:03:24 AM Project Manager Assigned: Ashlyn Mathy
11/7/2022 9:39:01 AM Submission Triaged
11/3/2022 5:58:27 PM Submission received from Applicant
4/25/2022 9:48:44 AM Submission request sent to Applicant
4/24/2022 2:48:57 PM Request for Review Comments returned by EPC Health Department
3/30/2022 10:08:00 AM Submission request sent to Applicant
3/30/2022 10:07:34 AM Payment Request sent: 3/30/2022
3/30/2022 10:06:21 AM Request for Review Comments returned by PCD Project Manager
3/30/2022 10:04:49 AM Request for Review Comments email resent for Project Araco Enterprises SDP for review by Kylie Bagley on behalf of PCD Project Manager
3/29/2022 5:28:58 PM Request for Review Comments returned by EPC Stormwater Review
3/29/2022 2:21:40 PM Request for Review Comments returned by PCD Project Manager
3/28/2022 11:26:58 AM Request for Review Comments returned by PCD Engineering Division
3/24/2022 2:35:18 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/10/2022 3:26:36 PM Request for Review Comments returned by County Attorney - Development Review
3/9/2022 11:27:42 AM Request for Review Comments returned by Fountain
3/7/2022 3:01:49 PM Submission request sent to Applicant
3/7/2022 9:41:57 AM Request for Review Comments returned by RBD Floodplain
3/7/2022 8:37:48 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Travis Jones on behalf of Widefield Water & San
3/7/2022 8:37:46 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
3/7/2022 8:37:44 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
3/7/2022 8:37:41 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
3/7/2022 8:37:39 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
3/7/2022 8:37:37 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
3/7/2022 8:37:35 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
3/7/2022 8:37:29 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
3/7/2022 8:37:20 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/7/2022 8:37:14 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
3/7/2022 8:37:08 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
3/7/2022 8:37:03 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kylie Bagley on behalf of PCD Project Manager
3/7/2022 8:36:57 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/7/2022 8:10:06 AM Submission Triaged
3/7/2022 7:41:48 AM Submission received from Applicant
1/4/2022 3:28:23 PM Project Manager Assigned: Kylie Bagley
12/14/2021 10:08:55 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
12/6/2021 7:44:51 AM Submission request sent to Applicant
12/6/2021 7:42:51 AM Request for Review Comments returned by PCD Project Manager
12/6/2021 7:39:25 AM Request for Review Comments email resent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
12/3/2021 2:21:04 PM Request for Review Comments returned by County Attorney - Development Review
12/3/2021 9:36:16 AM Request for Review Comments returned by EPC Stormwater Review
12/2/2021 4:40:44 PM Request for Review Comments returned by PCD Project Manager
12/2/2021 7:19:18 AM Request for Review Comments email resent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
12/2/2021 7:16:05 AM Request for Review Comments returned by PCD Project Manager
12/1/2021 5:33:26 PM Request for Review Comments returned by PCD Engineering Division
11/30/2021 8:49:08 AM Request for Review Comments returned by Pikes Peak Regional Building Department
11/12/2021 11:08:12 AM Request for Review Comments returned by Fountain
11/10/2021 12:30:51 PM Request for Review Comments returned by RBD Floodplain
11/10/2021 12:13:57 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
11/10/2021 12:13:55 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
11/10/2021 12:13:53 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
11/10/2021 12:13:51 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
11/10/2021 12:13:49 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/10/2021 12:13:46 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
11/10/2021 12:13:44 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/10/2021 12:13:38 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
11/10/2021 12:13:30 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
11/10/2021 12:13:26 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
11/10/2021 12:13:20 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
11/10/2021 12:13:16 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Mercedes Rivas on behalf of PCD Project Manager
11/10/2021 12:13:10 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/10/2021 11:03:13 AM Project Manager Assigned: Mercedes Rivas
11/9/2021 3:11:10 PM Project Manager Assigned: Ryan Howser
11/9/2021 3:10:22 PM Submission Triaged
11/8/2021 8:17:40 PM Submission received from Applicant
6/10/2021 5:03:41 PM Project Manager Assigned: Nina Ruiz
5/18/2021 7:35:02 AM Submission request sent to Applicant
5/17/2021 10:57:55 AM Request for Review Comments returned by EPC Stormwater Review
5/14/2021 2:11:22 PM Request for Review Comments returned by PCD Project Manager
5/14/2021 2:06:04 PM Request for Review Comments email resent for Project Araco Enterprises SDP for review by Sophie Kiepe on behalf of PCD Project Manager
5/13/2021 4:32:24 PM Request for Review Comments returned by PCD Engineering Division
5/5/2021 4:43:58 PM Request for Review Comments returned by PCD Project Manager
5/5/2021 11:03:06 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/5/2021 10:18:37 AM Request for Review Comments returned by County Attorney - Development Review
5/5/2021 9:38:57 AM Submission Triaged
5/4/2021 3:29:36 PM Submission received from Applicant
5/4/2021 12:17:14 PM Request for Review Comments returned by Pikes Peak Regional Building Department
4/15/2021 4:47:53 PM Submission request sent to Applicant
4/15/2021 4:44:04 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
4/15/2021 4:44:00 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
4/15/2021 4:43:58 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
4/15/2021 4:43:56 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Sophie Kiepe on behalf of PCD Project Manager
4/15/2021 4:39:00 PM Submission Triaged
4/14/2021 2:00:06 PM Submission received from Applicant
12/7/2020 11:23:45 AM Project Manager Assigned: Sophie Kiepe
9/9/2020 1:40:46 PM Request for Review Comments returned by EPC Health Department
8/31/2020 7:55:54 AM Request for Review Comments returned by EPC Stormwater Review
8/28/2020 11:25:44 AM Submission request sent to Applicant
8/28/2020 11:20:01 AM Request for Review Comments returned by PCD Project Manager
8/27/2020 9:51:49 PM Request for Review Comments returned by PCD Engineering Division
8/27/2020 8:52:32 AM Request for Review Comments returned by Fountain
8/25/2020 3:19:55 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
8/24/2020 5:36:56 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
8/20/2020 10:48:47 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/13/2020 8:58:11 PM Request for Review Comments returned by County Attorney - Development Review
7/31/2020 8:58:41 AM Request for Review Comments returned by RBD Floodplain
7/31/2020 7:31:41 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
7/31/2020 7:31:41 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
7/31/2020 7:31:40 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
7/31/2020 7:31:39 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
7/31/2020 7:31:38 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
7/31/2020 7:31:37 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
7/31/2020 7:31:36 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
7/31/2020 7:31:35 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
7/31/2020 7:31:32 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
7/31/2020 7:31:30 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
7/31/2020 7:31:29 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Rad Dickson on behalf of PCD Project Manager
7/31/2020 7:31:27 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/31/2020 7:30:32 AM Submission Triaged
7/29/2020 2:50:34 PM Submission received from Applicant
7/29/2020 2:24:23 PM Submission request sent to Applicant
7/29/2020 2:23:54 PM Submission request sent to Applicant
7/29/2020 2:23:30 PM Submission Triaged
7/29/2020 8:38:12 AM Submission received from Applicant
7/8/2020 12:39:27 PM Project Manager Assigned: Rad Dickson
1/30/2020 11:36:30 AM Request for Review Comments returned by EPC Health Department
12/17/2019 12:03:09 PM Submission request sent to Applicant
12/17/2019 12:00:26 PM Request for Review Comments returned by PCD Project Manager
12/17/2019 11:59:49 AM Request for Review Comments email resent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
12/17/2019 11:52:42 AM Request for Review Comments returned by PCD Project Manager
12/13/2019 9:42:20 PM Request for Review Comments returned by PCD Engineering Division
12/5/2019 8:33:44 AM Request for Review Comments returned by Pikes Peak Regional Building Department
12/3/2019 8:16:24 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
12/3/2019 8:16:23 AM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/2/2019 2:17:06 PM Request for Review Comments returned by County Attorney - Development Review
11/14/2019 4:00:33 PM Request for Review Comments returned by RBD Floodplain
11/14/2019 3:41:09 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Brandon Bernard on behalf of Widefield Water & San
11/14/2019 3:41:06 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Dennis Neal on behalf of Widefield SD 3
11/14/2019 3:41:02 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joel Stahn on behalf of Fountain Valley Power
11/14/2019 3:40:58 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Kristy Martinez on behalf of Fountain
11/14/2019 3:40:54 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
11/14/2019 3:40:50 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Keith Curtis on behalf of RBD Floodplain
11/14/2019 3:40:47 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
11/14/2019 3:40:43 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
11/14/2019 3:40:32 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by on behalf of EPC Health Department
11/14/2019 3:40:28 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Lori Seago on behalf of County Attorney - Development Review
11/14/2019 3:40:25 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Gabe Sevigny on behalf of PCD Project Manager
11/14/2019 3:40:21 PM Request for Review Comments email sent for Project Araco Enterprises SDP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/14/2019 2:40:20 PM Fees paid: 11/14/2019 (Receipt: 1002026)
11/14/2019 10:54:22 AM Payment Request sent: 11/14/2019
11/14/2019 10:54:15 AM File # Assigned: PPR1950
11/14/2019 8:50:38 AM Submission Triaged
11/14/2019 7:37:07 AM Submission received from Applicant
11/13/2019 3:51:00 PM Submission request sent to Applicant
11/13/2019 3:48:36 PM Submission Triaged
11/13/2019 12:29:28 PM Submission received from Applicant
11/12/2019 4:55:53 PM Submission request sent to Applicant
10/29/2019 7:53:26 AM Submission request sent to Applicant
10/28/2019 4:48:30 PM Submission request sent to Applicant
10/28/2019 4:38:56 PM Project Manager Assigned: Gabe Sevigny
10/28/2019 4:38:56 PM Project Created